title: "City of Holland - (MI) (MI) Rate & SAIDI"
url: https://epri-peac.com/utilities/mi-city-of-holland-mi-8723/
description: "2025 EIA-861 profile for City of Holland - (MI) (MI): 11.43 c/kWh rate, SAIDI 70.8 min/yr, 31 solar systems. Verified US government and CEC engineering data."
---

EIA-861 Grid Reliability & Net Metering

# City of Holland - (MI) (MI) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Holland - (MI) (EIA ID 8723, MI) serves 27,007 customers at 11.43 c/kWh (-8.60 c/kWh vs Michigan average) with 70.8 min/yr SAIDI (1.18 hrs/yr) with 31 net-metered residential solar systems (0.11% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 8723

- **Res. Rate** : 11.43 c/kWh

- **SAIDI (All Events)** : 70.8 min/yr

- **Net-Metered PV** : 31 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Holland - (MI) Compare on Tariffs and Reliability?

How City of Holland - (MI) (Municipal) performs across 2 counties on kWh rates and outage resilience. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

City of Holland - (MI) (Municipal) recorded 70.8 SAIDI outage minutes (1.18 hrs/yr, rank #163 of 751 reporting utilities). Typical residential meters drew 613.1 kWh/mo ($70.06/mo) in 2025, while its tariff offers a low 11.43 c/kWh residential rate (-7.11 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 19.1 years without federal 25D—compare rates directly with Midwest Energy Cooperative - (MI) (19.49 c/kWh).

## Where Does City of Holland - (MI) Sit Across US Utility Rates?

National utility tariff curve marking City of Holland - (MI) at 11.43 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Holland - (MI) Rank Across Cost & Reliability?

Relative ranking of City of Holland - (MI) on residential electricity pricing and annual IEEE SAIDI outage duration. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

## What Do EIA-861 Benchmarks Show for City of Holland - (MI)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Holland - (MI) in Michigan.

Lowest Rate #297 / 1,989

### 11.43 c/kWh (-8.60 vs MI)

Commercial avg: 10.41 c/kWh; Industrial: 6.91 c/kWh; est. residential bill $70.06/mo.

Reliability #163 / 751

### 70.8 min/yr (1.18 hrs)

54.0% (38.2 min) from Major Event Days; avg restore 176.9 min (~5.3 kWh @ 1.8 kW).

Post-25D Payback

### 19.1 Years @ 11.43 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,234/yr at 1,350 kWh/kW.

Distributed PV

### 31 Net-Metered Systems

0.177 MW residential PV (0.11% of customers) across 2 counties; state FEMA declarations (2015-2026): 11.

City of Holland - (MI) Reliability & Solar Offset Calculation

Backup_Energy = (176.9 min / 60) * 1.8 kW = 5.3 kWh/event | Solar_Offset = 10,800 kWh * $0.1143 = $1,234/yr

EIA-861 2025 Utility ID 8723: Rate=11.43 c/kWh, Cust=27,007, SAIDI=70.8 min, PV=31.

**Result:** 1.18 outage hrs/yr; 19.1 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Holland - (MI)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Holland - (MI). Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Form EIA-861 2025 filing metrics for City of Holland - (MI) (Utility ID 8723).

| EIA Utility ID & BA Code | ID 8723 · MISO |
|---|---|
| State & Ownership Type | MI · Municipal |
| Retail Electricity Rates | 11.43 c/kWh Res · 10.41 c Comm · 6.91 c Ind |
| Avg Monthly Usage & Bill | 613.1 kWh/mo ($70.06/mo est.) |
| SAIDI (All Events w/ MED) | 70.8 min/yr (1.18 hrs/yr) |
| SAIDI (Without Major Events) | 32.6 min/yr (Storm share: 54.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.4 /yr · 176.9 min restore |
| Residential Net-Metered PV | 31 systems (0.177 MW) |
| Counties Served (Sample) | 2 counties (Allegan, Ottawa) |

## Which Peer Electric Utilities Operate in MI?

Nearby Michigan electric utilities of comparable customer size led by Midwest Energy Cooperative - (MI) (19.49 c/kWh). All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Midwest Energy Cooperative - (MI)**](https://epri-peac.com/utilities/mi-midwest-energy-cooperative-mi-12377/) | 19.49 c | 1,012.2 min | 317 | 29,359 |
| [**Tri-County Electric Coop (MI)**](https://epri-peac.com/utilities/mi-tri-county-electric-coop-mi-19396/) | 18.33 c | 1,153.0 min | 194 | 23,136 |
| [**Presque Isle Elec & Gas Coop**](https://epri-peac.com/utilities/mi-presque-isle-elec-gas-coop-15340/) | 23.93 c | — | 52 | 32,519 |
| [**Upper Michigan Energy Resources Corp.**](https://epri-peac.com/utilities/mi-upper-michigan-energy-resources-corp-60631/) | 17.46 c | 1,249.0 min | 91 | 33,339 |

What to Check & Best-Fit Scenarios

## What Should City of Holland - (MI) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Holland - (MI) (Municipal, MI) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: City of Holland - (MI) (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in MI.
- Export credit rules: check City of Holland - (MI)'s active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### City of Holland - (MI) Solar & Battery Evaluators

Compare your actual City of Holland - (MI) monthly kWh statement against 11.43 c/kWh and verify current export tariffs in MI.

### City of Holland - (MI) Outage & Generator Planners

Use City of Holland - (MI)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Holland - (MI) (Michigan) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Holland - (MI)'s residential electricity rate and 2026 solar payback?

City of Holland - (MI) averages 11.43 c/kWh (-8.60 c/kWh vs Michigan average vs. Michigan). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,234/yr (19.1-year payback).

### How reliable is City of Holland - (MI) compared to peer Michigan utilities?

City of Holland - (MI) recorded 70.8 SAIDI outage minutes (1.18 hrs/yr, rank #163 of 751 reporting utilities); compare rates and outage history directly with Midwest Energy Cooperative - (MI) (19.49 c/kWh) across Michigan.

### Which counties and customers does City of Holland - (MI) serve in Michigan?

EIA-861 filings list 27,007 customers across 2 counties including Allegan, Ottawa, with 31 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Holland - (MI).

## Related Pages

Explore Michigan energy benchmarks, Midwest Energy Cooperative - (MI), county outage profiles, and NEC 705.12 tools alongside City of Holland - (MI).

[Michigan State Energy Rates & Utilities](https://epri-peac.com/states/michigan/) [All Michigan County Power & Outage Profiles](https://epri-peac.com/counties/michigan/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 11.43 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)