---
title: "City of Gladstone (MI) Rate & SAIDI"
url: https://epri-peac.com/utilities/mi-city-of-gladstone-7265/
description: "2025 EIA-861 profile for City of Gladstone (MI): 16.88 c/kWh rate, SAIDI Not reported in EIA-861, 4 solar systems. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# City of Gladstone (MI) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Gladstone (EIA ID 7265, MI) serves 2,546 customers at 16.88 c/kWh (-3.15 c/kWh vs Michigan average) with no standalone IEEE SAIDI filing (1 county served) with 4 net-metered residential solar systems (0.16% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 7265

- **Res. Rate** : 16.88 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 4 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Gladstone Compare on Tariffs and Reliability?

How City of Gladstone (Municipal) performs across 1 county on kWh rates and outage resilience. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

City of Gladstone (Municipal) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 608.7 min/yr). Typical residential meters drew 544.7 kWh/mo ($91.92/mo) in 2025, while its tariff bills residential power at 16.88 c/kWh (-3.15 c/kWh vs Michigan average vs. Michigan), offsetting ~$1,823/yr on an 8 kW array—compare rates directly with City of Negaunee (20.6 c/kWh).

## Where Does City of Gladstone Sit Across US Utility Rates?

National utility tariff curve marking City of Gladstone at 16.88 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Gladstone Rank Across Cost & Reliability?

Relative ranking of City of Gladstone on residential electricity pricing and annual IEEE SAIDI outage duration. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

## What Do EIA-861 Benchmarks Show for City of Gladstone?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Gladstone in Michigan. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Lowest Rate #1,533 / 1,989

### 16.88 c/kWh (-3.15 vs MI)

Commercial avg: 14.6 c/kWh; est. residential bill $91.92/mo.

State Reliability Context

### 608.7 min/yr (MI Avg)

Utility did not file separate IEEE SAIDI in 2025; Michigan customer-weighted SAIDI is 608.7 min/yr.

Post-25D Payback

### 12.9 Years @ 16.88 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,823/yr at 1,350 kWh/kW.

Distributed PV

### 4 Net-Metered Systems

0.03 MW residential PV (0.16% of customers) across 1 county; state FEMA declarations (2015-2026): 11.

City of Gladstone Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1688 = $1,823/yr

EIA-861 2025 Utility ID 7265: Rate=16.88 c/kWh, Cust=2,546, PV=4.

**Result:** 12.9 yr 8 kW cash payback at 16.88 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Gladstone?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Gladstone. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Form EIA-861 2025 filing metrics for City of Gladstone (Utility ID 7265).

| EIA Utility ID & BA Code | ID 7265 · MISO |
|---|---|
| State & Ownership Type | MI · Municipal |
| Retail Electricity Rates | 16.88 c/kWh Res · 14.6 c Comm |
| Avg Monthly Usage & Bill | 544.7 kWh/mo ($91.92/mo est.) |
| Residential Net-Metered PV | 4 systems (0.03 MW) |
| Counties Served (Sample) | 1 county (Delta) |

## Which Peer Electric Utilities Operate in MI?

Nearby Michigan electric utilities of comparable customer size led by City of Negaunee (20.6 c/kWh). Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Negaunee**](https://epri-peac.com/utilities/mi-city-of-negaunee-13352/) | 20.6 c | — | 3 | 1,982 |
| [**City of Norway - (MI)**](https://epri-peac.com/utilities/mi-city-of-norway-mi-13826/) | 18.47 c | — | 4 | 1,878 |
| [**City of Crystal Falls - (MI)**](https://epri-peac.com/utilities/mi-city-of-crystal-falls-mi-4604/) | 19.19 c | — | 1 | 1,462 |
| [**Village of L'Anse - (MI)**](https://epri-peac.com/utilities/mi-village-of-l-anse-mi-10508/) | 18.18 c | — | 1 | 1,342 |

What to Check & Best-Fit Scenarios

## What Should City of Gladstone Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Gladstone (Municipal, MI) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: City of Gladstone (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in MI.
- Export credit rules: check City of Gladstone's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### City of Gladstone Solar & Battery Evaluators

Compare your actual City of Gladstone monthly kWh statement against 16.88 c/kWh and verify current export tariffs in MI.

### City of Gladstone Outage & Generator Planners

Use City of Gladstone's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Gladstone (Michigan) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

### What is City of Gladstone's residential electricity rate and 2026 solar payback?

City of Gladstone averages 16.88 c/kWh (-3.15 c/kWh vs Michigan average vs. Michigan). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,823/yr (12.9-year payback).

### How reliable is City of Gladstone compared to peer Michigan utilities?

City of Gladstone did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 608.7 min/yr); compare rates and outage history directly with City of Negaunee (20.6 c/kWh) across Michigan.

### Which counties and customers does City of Gladstone serve in Michigan?

EIA-861 filings list 2,546 customers across 1 county including Delta, with 4 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Gladstone.

## Related Pages

Explore Michigan energy benchmarks, City of Negaunee, county outage profiles, and NEC 705.12 tools alongside City of Gladstone.

[Michigan State Energy Rates & Utilities](https://epri-peac.com/states/michigan/) [All Michigan County Power & Outage Profiles](https://epri-peac.com/counties/michigan/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 16.88 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
