title: "A & N Electric Coop (MD) Rate & SAIDI"
url: https://epri-peac.com/utilities/md-a-n-electric-coop-84/
description: "2025 EIA-861 profile for A & N Electric Coop (MD): 14.54 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# A & N Electric Coop (MD) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

A & N Electric Coop (EIA ID 84, MD) serves 226 customers at 14.54 c/kWh (-4.99 c/kWh vs Maryland average) with no standalone IEEE SAIDI filing (1 county served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 84

- **Res. Rate** : 14.54 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does A & N Electric Coop Compare on Tariffs and Reliability?

EIA-861 rate delta (-4.99 c/kWh vs Maryland average), customer scale (226), and 2026 solar payback benchmarks for A & N Electric Coop.

Ranked #1,103 of 1,989 reporting US utilities for residential rate (above US utility median; lower than 44.4% of peers), A & N Electric Coop serves 226 accounts in Maryland (Cooperative). Commercial power averages 14.76 c/kWh. It did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 178.3 min/yr), with zero residential net-metered PV reported in 2025 filings.

## Where Does A & N Electric Coop Sit Across US Utility Rates?

Positions A & N Electric Coop (14.54 c/kWh) across 1,989 US electric utility residential tariffs. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

## How Does A & N Electric Coop Rank Across Cost & Reliability?

Percentile placement of A & N Electric Coop across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for A & N Electric Coop?

Four key EIA-861 rate, outage, and solar payback benchmarks for A & N Electric Coop (Cooperative) in Maryland. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Lowest Rate #1,103 / 1,989

### 14.54 c/kWh (-4.99 vs MD)

Commercial avg: 14.76 c/kWh; est. residential bill $124.82/mo.

State Reliability Context

### 178.3 min/yr (MD Avg)

Utility did not file separate IEEE SAIDI in 2025; Maryland customer-weighted SAIDI is 178.3 min/yr.

Post-25D Payback

### 15.0 Years @ 14.54 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,570/yr at 1,350 kWh/kW.

Service Territory

### 226 Customers · 1 County

Serves 1 county including Somerset in Maryland; state FEMA declarations (2015-2026): 8.

A & N Electric Coop Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1454 = $1,570/yr

EIA-861 2025 Utility ID 84: Rate=14.54 c/kWh, Cust=226.

**Result:** 15.0 yr 8 kW cash payback at 14.54 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for A & N Electric Coop?

Complete Form EIA-861 filing summary for A & N Electric Coop (ID 84) covering sales, PV, and counties. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Form EIA-861 2025 filing metrics for A & N Electric Coop (Utility ID 84).

| EIA Utility ID & BA Code | ID 84 · PJM |
|---|---|
| State & Ownership Type | MD · Cooperative |
| Retail Electricity Rates | 14.54 c/kWh Res · 14.76 c Comm |
| Avg Monthly Usage & Bill | 858.4 kWh/mo ($124.82/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Somerset) |

## Which Peer Electric Utilities Operate in MD?

Compare A & N Electric Coop directly with AP Holdings LLC and nearby Maryland electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**AP Holdings LLC**](https://epri-peac.com/utilities/md-ap-holdings-llc-56571/) | 12.11 c | — | 0 | 223 |
| [**RPA Energy, Inc.**](https://epri-peac.com/utilities/md-rpa-energy-inc-63695/) | 20.9 c | — | 0 | 223 |
| [**Eligo Energy, LLC**](https://epri-peac.com/utilities/md-eligo-energy-llc-59054/) | 18.13 c | — | 0 | 210 |
| [**Atlantic Energy LLC**](https://epri-peac.com/utilities/md-atlantic-energy-llc-60583/) | 26.74 c | — | 0 | 210 |

What to Check & Best-Fit Scenarios

## What Should A & N Electric Coop Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for A & N Electric Coop (Cooperative, MD) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: A & N Electric Coop (Cooperative) reports historical 2025 EIA-861 averages rather than live rate-case riders in MD.
- Export credit rules: check A & N Electric Coop's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### A & N Electric Coop Solar & Battery Evaluators

Compare your actual A & N Electric Coop monthly kWh statement against 14.54 c/kWh and verify current export tariffs in MD.

### A & N Electric Coop Outage & Generator Planners

Use A & N Electric Coop's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for A & N Electric Coop (Maryland) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is A & N Electric Coop's residential electricity rate and 2026 solar payback?

A & N Electric Coop averages 14.54 c/kWh (-4.99 c/kWh vs Maryland average vs. Maryland). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,570/yr (15.0-year payback).

### How reliable is A & N Electric Coop compared to peer Maryland utilities?

A & N Electric Coop did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 178.3 min/yr); compare rates and outage history directly with AP Holdings LLC (12.11 c/kWh) across Maryland.

### Which counties and customers does A & N Electric Coop serve in Maryland?

EIA-861 filings list 226 customers across 1 county including Somerset, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting A & N Electric Coop.

## Related Pages

Explore Maryland energy benchmarks, AP Holdings LLC, county outage profiles, and NEC 705.12 tools alongside A & N Electric Coop.

[Maryland State Energy Rates & Utilities](https://epri-peac.com/states/maryland/) [All Maryland County Power & Outage Profiles](https://epri-peac.com/counties/maryland/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 14.54 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)