---
title: "Town of Hudson - (MA) (MA) Rate & SAIDI"
url: https://epri-peac.com/utilities/ma-town-of-hudson-ma-8973/
description: "2025 EIA-861 profile for Town of Hudson - (MA) (MA): 13.14 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# Town of Hudson - (MA) (MA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Town of Hudson - (MA) (EIA ID 8973, MA) serves 11,582 customers at 13.14 c/kWh (-17.27 c/kWh vs Massachusetts average) with no standalone IEEE SAIDI filing (1 county served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 8973

- **Res. Rate** : 13.14 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Town of Hudson - (MA) Compare on Tariffs and Reliability?

How Town of Hudson - (MA) (Municipal) performs across 1 county on kWh rates and outage resilience. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Across 1 county including Middlesex, Town of Hudson - (MA) bills residential power at 13.14 c/kWh (-17.27 c/kWh vs Massachusetts average vs. Massachusetts), offsetting ~$1,419/yr on an 8 kW array compared to peer Town of Danvers (16.55 c/kWh). With 11,582 customer accounts (Municipal), 2025 Form EIA-861 shows Town of Hudson - (MA) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 122.2 min/yr), with zero residential net-metered PV reported in 2025 filings.

## Where Does Town of Hudson - (MA) Sit Across US Utility Rates?

National utility tariff curve marking Town of Hudson - (MA) at 13.14 c/kWh vs. 18.54 c/kWh US mean.

## How Does Town of Hudson - (MA) Rank Across Cost & Reliability?

Relative ranking of Town of Hudson - (MA) on residential electricity pricing and annual IEEE SAIDI outage duration. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

## What Do EIA-861 Benchmarks Show for Town of Hudson - (MA)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Town of Hudson - (MA) in Massachusetts.

Lowest Rate #704 / 1,989

### 13.14 c/kWh (-17.27 vs MA)

Commercial avg: 10.86 c/kWh; Industrial: 15.58 c/kWh; est. residential bill $102.38/mo.

State Reliability Context

### 122.2 min/yr (MA Avg)

Utility did not file separate IEEE SAIDI in 2025; Massachusetts customer-weighted SAIDI is 122.2 min/yr.

Post-25D Payback

### 16.6 Years @ 13.14 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,419/yr at 1,350 kWh/kW.

Service Territory

### 11,582 Customers · 1 County

Serves 1 county including Middlesex in Massachusetts; state FEMA declarations (2015-2026): 12.

Town of Hudson - (MA) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1314 = $1,419/yr

EIA-861 2025 Utility ID 8973: Rate=13.14 c/kWh, Cust=11,582.

**Result:** 16.6 yr 8 kW cash payback at 13.14 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for Town of Hudson - (MA)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Town of Hudson - (MA). All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Form EIA-861 2025 filing metrics for Town of Hudson - (MA) (Utility ID 8973).

| EIA Utility ID & BA Code | ID 8973 · ISNE |
|---|---|
| State & Ownership Type | MA · Municipal |
| Retail Electricity Rates | 13.14 c/kWh Res · 10.86 c Comm · 15.58 c Ind |
| Avg Monthly Usage & Bill | 779.4 kWh/mo ($102.38/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Middlesex) |

## Which Peer Electric Utilities Operate in MA?

Nearby Massachusetts electric utilities of comparable customer size led by Town of Danvers (16.55 c/kWh). Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Town of Danvers**](https://epri-peac.com/utilities/ma-town-of-danvers-5480/) | 16.55 c | — | 70 | 11,677 |
| [**Nantucket Electric Co**](https://epri-peac.com/utilities/ma-nantucket-electric-co-13206/) | 23.24 c | 102.6 min | 312 | 10,751 |
| [**Town of North Attleborough - (MA)**](https://epri-peac.com/utilities/ma-town-of-north-attleborough-ma-13679/) | 15.87 c | 9.9 min | 45 | 12,650 |
| [**Nordic Energy Services, LLC**](https://epri-peac.com/utilities/ma-nordic-energy-services-llc-59088/) | 22.09 c | — | 0 | 9,927 |

What to Check & Best-Fit Scenarios

## What Should Town of Hudson - (MA) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Town of Hudson - (MA) (Municipal, MA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside Town of Hudson - (MA) (MA) shift real bills away from 13.14 c/kWh.
- Outage clustering: Major Event Days skew Town of Hudson - (MA) annual minutes differently than routine non-storm reliability.

### Town of Hudson - (MA) Solar & Battery Evaluators

Compare your actual Town of Hudson - (MA) monthly kWh statement against 13.14 c/kWh and verify current export tariffs in MA.

### Town of Hudson - (MA) Outage & Generator Planners

Use Town of Hudson - (MA)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Town of Hudson - (MA) (Massachusetts) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Town of Hudson - (MA)'s residential electricity rate and 2026 solar payback?

Town of Hudson - (MA) averages 13.14 c/kWh (-17.27 c/kWh vs Massachusetts average vs. Massachusetts). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,419/yr (16.6-year payback).

### How reliable is Town of Hudson - (MA) compared to peer Massachusetts utilities?

Town of Hudson - (MA) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 122.2 min/yr); compare rates and outage history directly with Town of Danvers (16.55 c/kWh) across Massachusetts.

### Which counties and customers does Town of Hudson - (MA) serve in Massachusetts?

EIA-861 filings list 11,582 customers across 1 county including Middlesex, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Town of Hudson - (MA).

## Related Pages

Explore Massachusetts energy benchmarks, Town of Danvers, county outage profiles, and NEC 705.12 tools alongside Town of Hudson - (MA).

[Massachusetts State Energy Rates & Utilities](https://epri-peac.com/states/massachusetts/) [All Massachusetts County Power & Outage Profiles](https://epri-peac.com/counties/massachusetts/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.14 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
