---
title: "First Point Power, LLC (MA) Rate & SAIDI"
url: https://epri-peac.com/utilities/ma-first-point-power-llc-59793/
description: "2025 EIA-861 profile for First Point Power, LLC (MA): 14.01 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# First Point Power, LLC (MA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

First Point Power, LLC (EIA ID 59793, MA) serves 279,362 customers at 14.01 c/kWh (-16.40 c/kWh vs Massachusetts average) with no standalone IEEE SAIDI filing (0 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 59793

- **Res. Rate** : 14.01 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does First Point Power, LLC Compare on Tariffs and Reliability?

EIA-861 rate delta (-16.40 c/kWh vs Massachusetts average), customer scale (279,362), and 2026 solar payback benchmarks for First Point Power, LLC.

Serving 279,362 customers across 0 counties in Massachusetts, First Point Power, LLC (Retail Power Marketer, Balancing Authority ISNE) bills residential power at 14.01 c/kWh (-16.40 c/kWh vs Massachusetts average vs. Massachusetts), offsetting ~$1,513/yr on an 8 kW array. Grid filings show the utility did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 122.2 min/yr), with zero residential net-metered PV reported in 2025 filings.

## Where Does First Point Power, LLC Sit Across US Utility Rates?

Positions First Point Power, LLC (14.01 c/kWh) across 1,989 US electric utility residential tariffs. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

## How Does First Point Power, LLC Rank Across Cost & Reliability?

Percentile placement of First Point Power, LLC across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for First Point Power, LLC?

Four key EIA-861 rate, outage, and solar payback benchmarks for First Point Power, LLC (Retail Power Marketer) in Massachusetts.

Lowest Rate #975 / 1,989

### 14.01 c/kWh (-16.40 vs MA)

Commercial avg: 13.54 c/kWh; Industrial: 12.56 c/kWh; est. residential bill $85.06/mo.

State Reliability Context

### 122.2 min/yr (MA Avg)

Utility did not file separate IEEE SAIDI in 2025; Massachusetts customer-weighted SAIDI is 122.2 min/yr.

Post-25D Payback

### 15.6 Years @ 14.01 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,513/yr at 1,350 kWh/kW.

Service Territory

### 279,362 Customers · 0 Counties

Serves 0 counties in Massachusetts; state FEMA declarations (2015-2026): 12.

First Point Power, LLC Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1401 = $1,513/yr

EIA-861 2025 Utility ID 59793: Rate=14.01 c/kWh, Cust=279,362.

**Result:** 15.6 yr 8 kW cash payback at 14.01 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for First Point Power, LLC?

Complete Form EIA-861 filing summary for First Point Power, LLC (ID 59793) covering sales, PV, and counties. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

Form EIA-861 2025 filing metrics for First Point Power, LLC (Utility ID 59793).

| EIA Utility ID & BA Code | ID 59793 · ISNE |
|---|---|
| State & Ownership Type | MA · Retail Power Marketer |
| Retail Electricity Rates | 14.01 c/kWh Res · 13.54 c Comm · 12.56 c Ind |
| Avg Monthly Usage & Bill | 607.0 kWh/mo ($85.06/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |

## Which Peer Electric Utilities Operate in MA?

Compare First Point Power, LLC directly with Constellation NewEnergy, Inc and nearby Massachusetts electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Constellation NewEnergy, Inc**](https://epri-peac.com/utilities/ma-constellation-newenergy-inc-13374/) | 15.27 c | — | 0 | 275,274 |
| [**Dynegy Energy Services, LLC**](https://epri-peac.com/utilities/ma-dynegy-energy-services-llc-59385/) | 13.72 c | — | 0 | 147,349 |
| [**NextEra Energy Services, LLC**](https://epri-peac.com/utilities/ma-nextera-energy-services-llc-7279/) | 12.65 c | — | 0 | 137,207 |
| [**Reliant Energy Northeast LLC**](https://epri-peac.com/utilities/ma-reliant-energy-northeast-llc-57037/) | 16.4 c | — | 0 | 81,964 |

What to Check & Best-Fit Scenarios

## What Should First Point Power, LLC Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for First Point Power, LLC (Retail Power Marketer, MA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside First Point Power, LLC (MA) shift real bills away from 14.01 c/kWh.
- Outage clustering: Major Event Days skew First Point Power, LLC annual minutes differently than routine non-storm reliability.

### First Point Power, LLC Solar & Battery Evaluators

Compare your actual First Point Power, LLC monthly kWh statement against 14.01 c/kWh and verify current export tariffs in MA.

### First Point Power, LLC Outage & Generator Planners

Use First Point Power, LLC's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for First Point Power, LLC (Massachusetts) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is First Point Power, LLC's residential electricity rate and 2026 solar payback?

First Point Power, LLC averages 14.01 c/kWh (-16.40 c/kWh vs Massachusetts average vs. Massachusetts). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,513/yr (15.6-year payback).

### How reliable is First Point Power, LLC compared to peer Massachusetts utilities?

First Point Power, LLC did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 122.2 min/yr); compare rates and outage history directly with Constellation NewEnergy, Inc (15.27 c/kWh) across Massachusetts.

### Which counties and customers does First Point Power, LLC serve in Massachusetts?

EIA-861 filings list 279,362 customers across 0 counties, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting First Point Power, LLC.

## Related Pages

Explore Massachusetts energy benchmarks, Constellation NewEnergy, Inc, county outage profiles, and NEC 705.12 tools alongside First Point Power, LLC.

[Massachusetts State Energy Rates & Utilities](https://epri-peac.com/states/massachusetts/) [All Massachusetts County Power & Outage Profiles](https://epri-peac.com/counties/massachusetts/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 14.01 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
