EIA-861 Grid Reliability & Net Metering

# City of Norwood - (MA) (MA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Norwood - (MA) (EIA ID 13839, MA) serves 13,617 customers at 17.61 c/kWh (-12.80 c/kWh vs Massachusetts average) with 117.4 min/yr SAIDI (1.96 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 13839

- **Res. Rate** : 17.61 c/kWh

- **SAIDI (All Events)** : 117.4 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Norwood - (MA) Compare on Tariffs and Reliability?

EIA-861 rate delta (-12.80 c/kWh vs Massachusetts average), customer scale (13,617), and 2026 solar payback benchmarks for City of Norwood - (MA).

Ranked #1,617 of 1,989 reporting US utilities for residential rate (above US utility median; lower than 18.7% of peers), City of Norwood - (MA) serves 13,617 accounts in Massachusetts (Municipal). Commercial power averages 19.54 c/kWh. It recorded 117.4 SAIDI outage minutes (1.96 hrs/yr, rank #272 of 751 reporting utilities), with zero residential net-metered PV reported in 2025 filings.

## Where Does City of Norwood - (MA) Sit Across US Utility Rates?

Positions City of Norwood - (MA) (17.61 c/kWh) across 1,989 US electric utility residential tariffs. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

## How Does City of Norwood - (MA) Rank Across Cost & Reliability?

Percentile placement of City of Norwood - (MA) across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for City of Norwood - (MA)?

Four key EIA-861 rate, outage, and solar payback benchmarks for City of Norwood - (MA) (Municipal) in Massachusetts. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Lowest Rate #1,617 / 1,989

### 17.61 c/kWh (-12.80 vs MA)

Commercial avg: 19.54 c/kWh; Industrial: 15.62 c/kWh; est. residential bill $98.36/mo.

Reliability #272 / 751

### 117.4 min/yr (1.96 hrs)

71.1% (83.5 min) from Major Event Days; avg restore 69.1 min (~2.1 kWh @ 1.8 kW).

Post-25D Payback

### 12.4 Years @ 17.61 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,902/yr at 1,350 kWh/kW.

Service Territory

### 13,617 Customers · 1 County

Serves 1 county including Norfolk in Massachusetts; state FEMA declarations (2015-2026): 12.

City of Norwood - (MA) Reliability & Solar Offset Calculation

Backup_Energy = (69.1 min / 60) * 1.8 kW = 2.1 kWh/event | Solar_Offset = 10,800 kWh * $0.1761 = $1,902/yr

EIA-861 2025 Utility ID 13839: Rate=17.61 c/kWh, Cust=13,617, SAIDI=117.4 min.

**Result:** 1.96 outage hrs/yr; 12.4 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Norwood - (MA)?

Complete Form EIA-861 filing summary for City of Norwood - (MA) (ID 13839) covering sales, PV, and counties. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Form EIA-861 2025 filing metrics for City of Norwood - (MA) (Utility ID 13839).

| EIA Utility ID & BA Code | ID 13839 · ISNE |
|---|---|
| State & Ownership Type | MA · Municipal |
| Retail Electricity Rates | 17.61 c/kWh Res · 19.54 c Comm · 15.62 c Ind |
| Avg Monthly Usage & Bill | 558.5 kWh/mo ($98.36/mo est.) |
| SAIDI (All Events w/ MED) | 117.4 min/yr (1.96 hrs/yr) |
| SAIDI (Without Major Events) | 33.9 min/yr (Storm share: 71.1%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.7 /yr · 69.1 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Norfolk) |

## Which Peer Electric Utilities Operate in MA?

Compare City of Norwood - (MA) directly with Town of Braintree - (MA) and nearby Massachusetts electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Town of Braintree - (MA)**](https://epri-peac.com/utilities/ma-town-of-braintree-ma-2144/) | 16.17 c | 71.8 min | 42 | 14,090 |
| [**Town of North Attleborough - (MA)**](https://epri-peac.com/utilities/ma-town-of-north-attleborough-ma-13679/) | 15.87 c | 9.9 min | 45 | 12,650 |
| [**SmartEnergy Holdings, LLC**](https://epri-peac.com/utilities/ma-smartenergy-holdings-llc-58956/) | 20.95 c | — | 0 | 14,952 |
| [**Town of Middleborough - (MA)**](https://epri-peac.com/utilities/ma-town-of-middleborough-ma-12473/) | 15.59 c | — | 125 | 14,978 |

What to Check & Best-Fit Scenarios

## What Should City of Norwood - (MA) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Norwood - (MA) (Municipal, MA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether City of Norwood - (MA) acts as a wires-only TDU or bundled utility in MA.
- Transformer limits: City of Norwood - (MA) interconnection engineering still checks neighborhood transformer kVA regardless of 117.4 SAIDI.

### City of Norwood - (MA) Solar & Battery Evaluators

Compare your actual City of Norwood - (MA) monthly kWh statement against 17.61 c/kWh and verify current export tariffs in MA.

### City of Norwood - (MA) Outage & Generator Planners

Use City of Norwood - (MA)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Norwood - (MA) (Massachusetts) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Norwood - (MA)'s residential electricity rate and 2026 solar payback?

City of Norwood - (MA) averages 17.61 c/kWh (-12.80 c/kWh vs Massachusetts average vs. Massachusetts). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,902/yr (12.4-year payback).

### How reliable is City of Norwood - (MA) compared to peer Massachusetts utilities?

City of Norwood - (MA) recorded 117.4 SAIDI outage minutes (1.96 hrs/yr, rank #272 of 751 reporting utilities); compare rates and outage history directly with Town of Braintree - (MA) (16.17 c/kWh) across Massachusetts.

### Which counties and customers does City of Norwood - (MA) serve in Massachusetts?

EIA-861 filings list 13,617 customers across 1 county including Norfolk, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Norwood - (MA).

## Related Pages

Explore Massachusetts energy benchmarks, Town of Braintree - (MA), county outage profiles, and NEC 705.12 tools alongside City of Norwood - (MA).

[Massachusetts State Energy Rates & Utilities](https://epri-peac.com/states/massachusetts/) [All Massachusetts County Power & Outage Profiles](https://epri-peac.com/counties/massachusetts/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 17.61 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)