---
title: "City of Holyoke - (MA) (MA) Rate & SAIDI"
url: https://epri-peac.com/utilities/ma-city-of-holyoke-ma-8774/
description: "2025 EIA-861 profile for City of Holyoke - (MA) (MA): 16.36 c/kWh rate, SAIDI 37.0 min/yr, 12 solar systems. Verified US government and CEC engineering data."
---

EIA-861 Grid Reliability & Net Metering

# City of Holyoke - (MA) (MA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Holyoke - (MA) (EIA ID 8774, MA) serves 15,155 customers at 16.36 c/kWh (-14.05 c/kWh vs Massachusetts average) with 37.0 min/yr SAIDI (0.62 hrs/yr) with 12 net-metered residential solar systems (0.08% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 8774

- **Res. Rate** : 16.36 c/kWh

- **SAIDI (All Events)** : 37.0 min/yr

- **Net-Metered PV** : 12 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Holyoke - (MA) Compare on Tariffs and Reliability?

How City of Holyoke - (MA) (Municipal) performs across 1 county on kWh rates and outage resilience. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Across 1 county including Hampden, City of Holyoke - (MA) bills residential power at 16.36 c/kWh (-14.05 c/kWh vs Massachusetts average vs. Massachusetts), offsetting ~$1,767/yr on an 8 kW array compared to peer Town of Shrewsbury - (MA) (15.53 c/kWh). With 15,155 customer accounts (Municipal), 2025 Form EIA-861 shows City of Holyoke - (MA) recorded 37.0 SAIDI outage minutes (0.62 hrs/yr, rank #75 of 751 reporting utilities), with 12 net-metered residential solar systems (0.08% customer adoption).

## Where Does City of Holyoke - (MA) Sit Across US Utility Rates?

National utility tariff curve marking City of Holyoke - (MA) at 16.36 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Holyoke - (MA) Rank Across Cost & Reliability?

Relative ranking of City of Holyoke - (MA) on residential electricity pricing and annual IEEE SAIDI outage duration. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

## What Do EIA-861 Benchmarks Show for City of Holyoke - (MA)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Holyoke - (MA) in Massachusetts.

Lowest Rate #1,464 / 1,989

### 16.36 c/kWh (-14.05 vs MA)

Commercial avg: 14.66 c/kWh; Industrial: 12.13 c/kWh; est. residential bill $101.23/mo.

Reliability #75 / 751

### 37.0 min/yr (0.62 hrs)

0.0% (0.0 min) from Major Event Days; avg restore 79.6 min (~2.4 kWh @ 1.8 kW).

Post-25D Payback

### 13.4 Years @ 16.36 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,767/yr at 1,350 kWh/kW.

Distributed PV

### 12 Net-Metered Systems

0.088 MW residential PV (0.08% of customers) across 1 county; state FEMA declarations (2015-2026): 12.

City of Holyoke - (MA) Reliability & Solar Offset Calculation

Backup_Energy = (79.6 min / 60) * 1.8 kW = 2.4 kWh/event | Solar_Offset = 10,800 kWh * $0.1636 = $1,767/yr

EIA-861 2025 Utility ID 8774: Rate=16.36 c/kWh, Cust=15,155, SAIDI=37.0 min, PV=12.

**Result:** 0.62 outage hrs/yr; 13.4 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Holyoke - (MA)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Holyoke - (MA). Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Form EIA-861 2025 filing metrics for City of Holyoke - (MA) (Utility ID 8774).

| EIA Utility ID & BA Code | ID 8774 · ISNE |
|---|---|
| State & Ownership Type | MA · Municipal |
| Retail Electricity Rates | 16.36 c/kWh Res · 14.66 c Comm · 12.13 c Ind |
| Avg Monthly Usage & Bill | 618.8 kWh/mo ($101.23/mo est.) |
| SAIDI (All Events w/ MED) | 37.0 min/yr (0.62 hrs/yr) |
| SAIDI (Without Major Events) | 37.0 min/yr (Storm share: 0.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.464 /yr · 79.6 min restore |
| Residential Net-Metered PV | 12 systems (0.088 MW) |
| Counties Served (Sample) | 1 county (Hampden) |

## Which Peer Electric Utilities Operate in MA?

Nearby Massachusetts electric utilities of comparable customer size led by Town of Shrewsbury - (MA) (15.53 c/kWh). Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Town of Shrewsbury - (MA)**](https://epri-peac.com/utilities/ma-town-of-shrewsbury-ma-17127/) | 15.53 c | 830.5 min | 173 | 15,206 |
| [**Town of Middleborough - (MA)**](https://epri-peac.com/utilities/ma-town-of-middleborough-ma-12473/) | 15.59 c | — | 125 | 14,978 |
| [**SmartEnergy Holdings, LLC**](https://epri-peac.com/utilities/ma-smartenergy-holdings-llc-58956/) | 20.95 c | — | 0 | 14,952 |
| [**Residents Energy, LLC**](https://epri-peac.com/utilities/ma-residents-energy-llc-59809/) | 20.91 c | — | 0 | 15,864 |

What to Check & Best-Fit Scenarios

## What Should City of Holyoke - (MA) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Holyoke - (MA) (Municipal, MA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: City of Holyoke - (MA)'s 16.36 c/kWh blended residential rate in MA does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: City of Holyoke - (MA) system-wide SAIDI averages rural and urban circuits across its MA territory or nearby Town of Shrewsbury - (MA).

### City of Holyoke - (MA) Solar & Battery Evaluators

Compare your actual City of Holyoke - (MA) monthly kWh statement against 16.36 c/kWh and verify current export tariffs in MA.

### City of Holyoke - (MA) Outage & Generator Planners

Use City of Holyoke - (MA)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Holyoke - (MA) (Massachusetts) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Holyoke - (MA)'s residential electricity rate and 2026 solar payback?

City of Holyoke - (MA) averages 16.36 c/kWh (-14.05 c/kWh vs Massachusetts average vs. Massachusetts). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,767/yr (13.4-year payback).

### How reliable is City of Holyoke - (MA) compared to peer Massachusetts utilities?

City of Holyoke - (MA) recorded 37.0 SAIDI outage minutes (0.62 hrs/yr, rank #75 of 751 reporting utilities); compare rates and outage history directly with Town of Shrewsbury - (MA) (15.53 c/kWh) across Massachusetts.

### Which counties and customers does City of Holyoke - (MA) serve in Massachusetts?

EIA-861 filings list 15,155 customers across 1 county including Hampden, with 12 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Holyoke - (MA).

## Related Pages

Explore Massachusetts energy benchmarks, Town of Shrewsbury - (MA), county outage profiles, and NEC 705.12 tools alongside City of Holyoke - (MA).

[Massachusetts State Energy Rates & Utilities](https://epri-peac.com/states/massachusetts/) [All Massachusetts County Power & Outage Profiles](https://epri-peac.com/counties/massachusetts/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 16.36 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
