---
title: "Shelby Energy Coop, Inc - (KY) (KY) Rate & SAIDI"
url: https://epri-peac.com/utilities/ky-shelby-energy-coop-inc-ky-17044/
description: "2025 EIA-861 profile for Shelby Energy Coop, Inc - (KY) (KY): 13.95 c/kWh rate, SAIDI 244.9 min/yr, 169 solar systems. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# Shelby Energy Coop, Inc - (KY) (KY) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Shelby Energy Coop, Inc - (KY) (EIA ID 17044, KY) serves 17,245 customers at 13.95 c/kWh (+0.82 c/kWh vs Kentucky average) with 244.9 min/yr SAIDI (4.08 hrs/yr) with 169 net-metered residential solar systems (0.98% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 17044

- **Res. Rate** : 13.95 c/kWh

- **SAIDI (All Events)** : 244.9 min/yr

- **Net-Metered PV** : 169 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Shelby Energy Coop, Inc - (KY) Compare on Tariffs and Reliability?

Solar payback, residential tariff (13.95 c/kWh), and outage history inside Shelby Energy Coop, Inc - (KY) territory. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Homeowners inside Shelby Energy Coop, Inc - (KY)'s Kentucky footprint (10 counties including Anderson, Carroll, Franklin) face 13.95 c/kWh benchmark pricing (-4.59 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 15.7 years. Reliability data logged 244.9 SAIDI outage minutes (4.08 hrs/yr, 19.3% storm-driven), making battery backup or a standby ATS worthwhile.

## Where Does Shelby Energy Coop, Inc - (KY) Sit Across US Utility Rates?

Benchmarking Shelby Energy Coop, Inc - (KY)'s 13.95 c/kWh residential rate against 1,989 EIA-861 utilities. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

## How Does Shelby Energy Coop, Inc - (KY) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Shelby Energy Coop, Inc - (KY) across Kentucky utilities. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

## What Do EIA-861 Benchmarks Show for Shelby Energy Coop, Inc - (KY)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Shelby Energy Coop, Inc - (KY) in 2025.

Lowest Rate #958 / 1,989

### 13.95 c/kWh (+0.82 vs KY)

Commercial avg: 10.4 c/kWh; Industrial: 8.28 c/kWh; est. residential bill $177.81/mo.

Reliability #486 / 751

### 244.9 min/yr (4.08 hrs)

19.3% (47.2 min) from Major Event Days; avg restore 131.7 min (~4.0 kWh @ 1.8 kW).

Post-25D Payback

### 15.7 Years @ 13.95 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,507/yr at 1,350 kWh/kW.

Distributed PV

### 169 Net-Metered Systems

1.9 MW residential PV (0.98% of customers) across 10 counties; state FEMA declarations (2015-2026): 32.

Shelby Energy Coop, Inc - (KY) Reliability & Solar Offset Calculation

Backup_Energy = (131.7 min / 60) * 1.8 kW = 4.0 kWh/event | Solar_Offset = 10,800 kWh * $0.1395 = $1,507/yr

EIA-861 2025 Utility ID 17044: Rate=13.95 c/kWh, Cust=17,245, SAIDI=244.9 min, PV=169.

**Result:** 4.08 outage hrs/yr; 15.7 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Shelby Energy Coop, Inc - (KY)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 17044. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

Form EIA-861 2025 filing metrics for Shelby Energy Coop, Inc - (KY) (Utility ID 17044).

| EIA Utility ID & BA Code | ID 17044 · PJM |
|---|---|
| State & Ownership Type | KY · Cooperative |
| Retail Electricity Rates | 13.95 c/kWh Res · 10.4 c Comm · 8.28 c Ind |
| Avg Monthly Usage & Bill | 1,274.6 kWh/mo ($177.81/mo est.) |
| SAIDI (All Events w/ MED) | 244.9 min/yr (4.08 hrs/yr) |
| SAIDI (Without Major Events) | 197.7 min/yr (Storm share: 19.3%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.86 /yr · 131.7 min restore |
| Residential Net-Metered PV | 169 systems (1.9 MW) |
| Counties Served (Sample) | 10 counties (Anderson, Carroll, Franklin, Henry, Jefferson, Oldham, Owen, Shelby, Spencer, Trimble) |

## Which Peer Electric Utilities Operate in KY?

Benchmark Shelby Energy Coop, Inc - (KY) directly against City of Frankfort - (KY) and peer Kentucky retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Frankfort - (KY)**](https://epri-peac.com/utilities/ky-city-of-frankfort-ky-6708/) | 11.11 c | 84.8 min | 95 | 17,258 |
| [**Licking Valley Rural E.C.C.**](https://epri-peac.com/utilities/ky-licking-valley-rural-e-c-c-11011/) | 15.21 c | — | 0 | 16,861 |
| [**City of Paducah - (KY)**](https://epri-peac.com/utilities/ky-city-of-paducah-ky-14371/) | 15.35 c | 33.3 min | 0 | 18,967 |
| [**Grayson Rural Electric Coop Corp**](https://epri-peac.com/utilities/ky-grayson-rural-electric-coop-corp-7558/) | 15.99 c | 2,391.0 min | 55 | 14,471 |

What to Check & Best-Fit Scenarios

## What Should Shelby Energy Coop, Inc - (KY) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Shelby Energy Coop, Inc - (KY) (Cooperative, KY) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside Shelby Energy Coop, Inc - (KY) (KY) shift real bills away from 13.95 c/kWh.
- Outage clustering: Major Event Days skew Shelby Energy Coop, Inc - (KY) annual minutes differently than routine non-storm reliability.

### Shelby Energy Coop, Inc - (KY) Solar & Battery Evaluators

Compare your actual Shelby Energy Coop, Inc - (KY) monthly kWh statement against 13.95 c/kWh and verify current export tariffs in KY.

### Shelby Energy Coop, Inc - (KY) Outage & Generator Planners

Use Shelby Energy Coop, Inc - (KY)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Shelby Energy Coop, Inc - (KY) (Kentucky) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Shelby Energy Coop, Inc - (KY)'s residential electricity rate and 2026 solar payback?

Shelby Energy Coop, Inc - (KY) averages 13.95 c/kWh (+0.82 c/kWh vs Kentucky average vs. Kentucky). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,507/yr (15.7-year payback).

### How reliable is Shelby Energy Coop, Inc - (KY) compared to peer Kentucky utilities?

Shelby Energy Coop, Inc - (KY) logged 244.9 SAIDI outage minutes (4.08 hrs/yr, 19.3% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with City of Frankfort - (KY) (11.11 c/kWh) across Kentucky.

### Which counties and customers does Shelby Energy Coop, Inc - (KY) serve in Kentucky?

EIA-861 filings list 17,245 customers across 10 counties including Anderson, Carroll, Franklin, with 169 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Shelby Energy Coop, Inc - (KY).

## Related Pages

Explore Kentucky energy benchmarks, City of Frankfort - (KY), county outage profiles, and NEC 705.12 tools alongside Shelby Energy Coop, Inc - (KY).

[Kentucky State Energy Rates & Utilities](https://epri-peac.com/states/kentucky/) [All Kentucky County Power & Outage Profiles](https://epri-peac.com/counties/kentucky/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.95 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
