# City of Jellico (KY) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Jellico (EIA ID 9697, KY) serves 1,755 customers at 14.1 c/kWh (+0.97 c/kWh vs Kentucky average) with no standalone IEEE SAIDI filing (1 county served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 9697

- **Res. Rate** : 14.1 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Jellico Compare on Tariffs and Reliability?

How City of Jellico (Municipal) performs across 1 county on kWh rates and outage resilience. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

City of Jellico (Municipal) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 396.3 min/yr). Typical residential meters drew 1,116.7 kWh/mo ($157.50/mo) in 2025, while its tariff bills residential power at 14.1 c/kWh (+0.97 c/kWh vs Kentucky average vs. Kentucky), offsetting ~$1,523/yr on an 8 kW array—compare rates directly with City of Benton - (KY) (14.95 c/kWh).

## Where Does City of Jellico Sit Across US Utility Rates?

National utility tariff curve marking City of Jellico at 14.1 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Jellico Rank Across Cost & Reliability?

Relative ranking of City of Jellico on residential electricity pricing and annual IEEE SAIDI outage duration. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

## What Do EIA-861 Benchmarks Show for City of Jellico?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Jellico in Kentucky. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Lowest Rate #1,004 / 1,989

### 14.1 c/kWh (+0.97 vs KY)

Commercial avg: 15.82 c/kWh; est. residential bill $157.50/mo.

State Reliability Context

### 396.3 min/yr (KY Avg)

Utility did not file separate IEEE SAIDI in 2025; Kentucky customer-weighted SAIDI is 396.3 min/yr.

Post-25D Payback

### 15.5 Years @ 14.1 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,523/yr at 1,350 kWh/kW.

Service Territory

### 1,755 Customers · 1 County

Serves 1 county including Whitley in Kentucky; state FEMA declarations (2015-2026): 32.

City of Jellico Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1410 = $1,523/yr

EIA-861 2025 Utility ID 9697: Rate=14.1 c/kWh, Cust=1,755.

**Result:** 15.5 yr 8 kW cash payback at 14.1 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Jellico?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Jellico. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

Form EIA-861 2025 filing metrics for City of Jellico (Utility ID 9697).

| EIA Utility ID & BA Code | ID 9697 · TVA |
|---|---|
| State & Ownership Type | KY · Municipal |
| Retail Electricity Rates | 14.1 c/kWh Res · 15.82 c Comm |
| Avg Monthly Usage & Bill | 1,116.7 kWh/mo ($157.50/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Whitley) |

## Which Peer Electric Utilities Operate in KY?

Nearby Kentucky electric utilities of comparable customer size led by City of Benton - (KY) (14.95 c/kWh). Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Benton - (KY)**](https://epri-peac.com/utilities/ky-city-of-benton-ky-1582/) | 14.95 c | — | 0 | 1,891 |
| [**City of Fulton - (KY)**](https://epri-peac.com/utilities/ky-city-of-fulton-ky-6840/) | 14.11 c | — | 0 | 1,195 |
| [**Gibson Electric Members Corp**](https://epri-peac.com/utilities/ky-gibson-electric-members-corp-7174/) | 14.04 c | — | 0 | 2,531 |
| [**City of Hickman**](https://epri-peac.com/utilities/ky-city-of-hickman-8548/) | 14.99 c | — | 0 | 813 |

What to Check & Best-Fit Scenarios

## What Should City of Jellico Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Jellico (Municipal, KY) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether City of Jellico acts as a wires-only TDU or bundled utility in KY.
- Transformer limits: City of Jellico interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.

### City of Jellico Solar & Battery Evaluators

Compare your actual City of Jellico monthly kWh statement against 14.1 c/kWh and verify current export tariffs in KY.

### City of Jellico Outage & Generator Planners

Use City of Jellico's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Jellico (Kentucky) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

### What is City of Jellico's residential electricity rate and 2026 solar payback?

City of Jellico averages 14.1 c/kWh (+0.97 c/kWh vs Kentucky average vs. Kentucky). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,523/yr (15.5-year payback).

### How reliable is City of Jellico compared to peer Kentucky utilities?

City of Jellico did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 396.3 min/yr); compare rates and outage history directly with City of Benton - (KY) (14.95 c/kWh) across Kentucky.

### Which counties and customers does City of Jellico serve in Kentucky?

EIA-861 filings list 1,755 customers across 1 county including Whitley, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Jellico.

## Related Pages

Explore Kentucky energy benchmarks, City of Benton - (KY), county outage profiles, and NEC 705.12 tools alongside City of Jellico.

[Kentucky State Energy Rates & Utilities](https://epri-peac.com/states/kentucky/) [All Kentucky County Power & Outage Profiles](https://epri-peac.com/counties/kentucky/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 14.1 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)