---
title: "City of Glasgow - (KY) (KY) Rate & SAIDI"
url: https://epri-peac.com/utilities/ky-city-of-glasgow-ky-7270/
description: "2025 EIA-861 profile for City of Glasgow - (KY) (KY): 13.96 c/kWh rate, SAIDI 163.2 min/yr, 2025 rate & service profile. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# City of Glasgow - (KY) (KY) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Glasgow - (KY) (EIA ID 7270, KY) serves 5,675 customers at 13.96 c/kWh (+0.83 c/kWh vs Kentucky average) with 163.2 min/yr SAIDI (2.72 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 7270

- **Res. Rate** : 13.96 c/kWh

- **SAIDI (All Events)** : 163.2 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Glasgow - (KY) Compare on Tariffs and Reliability?

How City of Glasgow - (KY) (Municipal) performs across 1 county on kWh rates and outage resilience. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

City of Glasgow - (KY) (Municipal) recorded 163.2 SAIDI outage minutes (2.72 hrs/yr, rank #351 of 751 reporting utilities). Typical residential meters drew 987.8 kWh/mo ($137.93/mo) in 2025, while its tariff bills residential power at 13.96 c/kWh (+0.83 c/kWh vs Kentucky average vs. Kentucky), offsetting ~$1,508/yr on an 8 kW array—compare rates directly with City of Murray - (KY) (14.27 c/kWh).

## Where Does City of Glasgow - (KY) Sit Across US Utility Rates?

National utility tariff curve marking City of Glasgow - (KY) at 13.96 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Glasgow - (KY) Rank Across Cost & Reliability?

Relative ranking of City of Glasgow - (KY) on residential electricity pricing and annual IEEE SAIDI outage duration. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

## What Do EIA-861 Benchmarks Show for City of Glasgow - (KY)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Glasgow - (KY) in Kentucky.

Lowest Rate #962 / 1,989

### 13.96 c/kWh (+0.83 vs KY)

Commercial avg: 12.39 c/kWh; Industrial: 8.56 c/kWh; est. residential bill $137.93/mo.

Reliability #351 / 751

### 163.2 min/yr (2.72 hrs)

0.0% (0.0 min) from Major Event Days; avg restore 61.3 min (~1.8 kWh @ 1.8 kW).

Post-25D Payback

### 15.6 Years @ 13.96 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,508/yr at 1,350 kWh/kW.

Service Territory

### 5,675 Customers · 1 County

Serves 1 county including Barren in Kentucky; state FEMA declarations (2015-2026): 32.

City of Glasgow - (KY) Reliability & Solar Offset Calculation

Backup_Energy = (61.3 min / 60) * 1.8 kW = 1.8 kWh/event | Solar_Offset = 10,800 kWh * $0.1396 = $1,508/yr

EIA-861 2025 Utility ID 7270: Rate=13.96 c/kWh, Cust=5,675, SAIDI=163.2 min.

**Result:** 2.72 outage hrs/yr; 15.6 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Glasgow - (KY)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Glasgow - (KY). Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

Form EIA-861 2025 filing metrics for City of Glasgow - (KY) (Utility ID 7270).

| EIA Utility ID & BA Code | ID 7270 · TVA |
|---|---|
| State & Ownership Type | KY · Municipal |
| Retail Electricity Rates | 13.96 c/kWh Res · 12.39 c Comm · 8.56 c Ind |
| Avg Monthly Usage & Bill | 987.8 kWh/mo ($137.93/mo est.) |
| SAIDI (All Events w/ MED) | 163.2 min/yr (2.72 hrs/yr) |
| SAIFI & CAIDI (Per-Outage Avg) | 2.66 /yr · 61.3 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Barren) |

## Which Peer Electric Utilities Operate in KY?

Nearby Kentucky electric utilities of comparable customer size led by City of Murray - (KY) (14.27 c/kWh). Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Murray - (KY)**](https://epri-peac.com/utilities/ky-city-of-murray-ky-13138/) | 14.27 c | — | 0 | 6,187 |
| [**City of Berea Municipal Utility**](https://epri-peac.com/utilities/ky-city-of-berea-municipal-utility-49998/) | 9.52 c | — | 28 | 4,698 |
| [**City of Franklin - (KY)**](https://epri-peac.com/utilities/ky-city-of-franklin-ky-6718/) | 13.42 c | — | 0 | 4,621 |
| [**Madisonville Municipal Utils**](https://epri-peac.com/utilities/ky-madisonville-municipal-utils-11488/) | 11.92 c | — | 3 | 6,923 |

What to Check & Best-Fit Scenarios

## What Should City of Glasgow - (KY) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Glasgow - (KY) (Municipal, KY) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether City of Glasgow - (KY) acts as a wires-only TDU or bundled utility in KY.
- Transformer limits: City of Glasgow - (KY) interconnection engineering still checks neighborhood transformer kVA regardless of 163.2 SAIDI.

### City of Glasgow - (KY) Solar & Battery Evaluators

Compare your actual City of Glasgow - (KY) monthly kWh statement against 13.96 c/kWh and verify current export tariffs in KY.

### City of Glasgow - (KY) Outage & Generator Planners

Use City of Glasgow - (KY)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Glasgow - (KY) (Kentucky) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Glasgow - (KY)'s residential electricity rate and 2026 solar payback?

City of Glasgow - (KY) averages 13.96 c/kWh (+0.83 c/kWh vs Kentucky average vs. Kentucky). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,508/yr (15.6-year payback).

### How reliable is City of Glasgow - (KY) compared to peer Kentucky utilities?

City of Glasgow - (KY) recorded 163.2 SAIDI outage minutes (2.72 hrs/yr, rank #351 of 751 reporting utilities); compare rates and outage history directly with City of Murray - (KY) (14.27 c/kWh) across Kentucky.

### Which counties and customers does City of Glasgow - (KY) serve in Kentucky?

EIA-861 filings list 5,675 customers across 1 county including Barren, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Glasgow - (KY).

## Related Pages

Explore Kentucky energy benchmarks, City of Murray - (KY), county outage profiles, and NEC 705.12 tools alongside City of Glasgow - (KY).

[Kentucky State Energy Rates & Utilities](https://epri-peac.com/states/kentucky/) [All Kentucky County Power & Outage Profiles](https://epri-peac.com/counties/kentucky/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.96 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
