---
title: "City of Peru - (IN) (IN) Rate & SAIDI"
url: https://epri-peac.com/utilities/in-city-of-peru-in-14839/
description: "2025 EIA-861 profile for City of Peru - (IN) (IN): 13.25 c/kWh rate, SAIDI 62.5 min/yr, 15 solar systems. Verified US government and CEC engineering data."
---

EIA-861 Grid Reliability & Net Metering

# City of Peru - (IN) (IN) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Peru - (IN) (EIA ID 14839, IN) serves 8,847 customers at 13.25 c/kWh (-2.71 c/kWh vs Indiana average) with 62.5 min/yr SAIDI (1.04 hrs/yr) with 15 net-metered residential solar systems (0.17% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 14839

- **Res. Rate** : 13.25 c/kWh

- **SAIDI (All Events)** : 62.5 min/yr

- **Net-Metered PV** : 15 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Peru - (IN) Compare on Tariffs and Reliability?

Solar payback, residential tariff (13.25 c/kWh), and outage history inside City of Peru - (IN) territory. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Homeowners inside City of Peru - (IN)'s Indiana footprint (2 counties including Cass, Miami) face 13.25 c/kWh benchmark pricing (-5.29 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 16.5 years. Reliability data recorded 62.5 SAIDI outage minutes (1.04 hrs/yr, rank #142 of 751 reporting utilities).

## Where Does City of Peru - (IN) Sit Across US Utility Rates?

Benchmarking City of Peru - (IN)'s 13.25 c/kWh residential rate against 1,989 EIA-861 utilities. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

## How Does City of Peru - (IN) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of Peru - (IN) across Indiana utilities. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

## What Do EIA-861 Benchmarks Show for City of Peru - (IN)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of Peru - (IN) in 2025.

Lowest Rate #741 / 1,989

### 13.25 c/kWh (-2.71 vs IN)

Commercial avg: 12.39 c/kWh; Industrial: 10.83 c/kWh; est. residential bill $110.99/mo.

Reliability #142 / 751

### 62.5 min/yr (1.04 hrs)

36.3% (22.7 min) from Major Event Days; avg restore 81.1 min (~2.4 kWh @ 1.8 kW).

Post-25D Payback

### 16.5 Years @ 13.25 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,431/yr at 1,350 kWh/kW.

Distributed PV

### 15 Net-Metered Systems

0.086 MW residential PV (0.17% of customers) across 2 counties; state FEMA declarations (2015-2026): 8.

City of Peru - (IN) Reliability & Solar Offset Calculation

Backup_Energy = (81.1 min / 60) * 1.8 kW = 2.4 kWh/event | Solar_Offset = 10,800 kWh * $0.1325 = $1,431/yr

EIA-861 2025 Utility ID 14839: Rate=13.25 c/kWh, Cust=8,847, SAIDI=62.5 min, PV=15.

**Result:** 1.04 outage hrs/yr; 16.5 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Peru - (IN)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 14839. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

Form EIA-861 2025 filing metrics for City of Peru - (IN) (Utility ID 14839).

| EIA Utility ID & BA Code | ID 14839 · MISO |
|---|---|
| State & Ownership Type | IN · Municipal |
| Retail Electricity Rates | 13.25 c/kWh Res · 12.39 c Comm · 10.83 c Ind |
| Avg Monthly Usage & Bill | 837.9 kWh/mo ($110.99/mo est.) |
| SAIDI (All Events w/ MED) | 62.5 min/yr (1.04 hrs/yr) |
| SAIDI (Without Major Events) | 39.8 min/yr (Storm share: 36.3%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.77 /yr · 81.1 min restore |
| Residential Net-Metered PV | 15 systems (0.086 MW) |
| Counties Served (Sample) | 2 counties (Cass, Miami) |

## Which Peer Electric Utilities Operate in IN?

Benchmark City of Peru - (IN) directly against Southern Indiana R E C, Inc and peer Indiana retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Southern Indiana R E C, Inc**](https://epri-peac.com/utilities/in-southern-indiana-r-e-c-inc-19445/) | 15.47 c | 893.7 min | 55 | 8,957 |
| [**Crawfordsville Elec, Lgt & Pwr**](https://epri-peac.com/utilities/in-crawfordsville-elec-lgt-pwr-4508/) | 12.83 c | — | 15 | 8,685 |
| [**Steuben County Rural E M C**](https://epri-peac.com/utilities/in-steuben-county-rural-e-m-c-18100/) | 14.05 c | — | 0 | 9,193 |
| [**City of Lebanon - (IN)**](https://epri-peac.com/utilities/in-city-of-lebanon-in-9613/) | 11.82 c | — | 0 | 8,328 |

What to Check & Best-Fit Scenarios

## What Should City of Peru - (IN) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Peru - (IN) (Municipal, IN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside City of Peru - (IN) (IN) shift real bills away from 13.25 c/kWh.
- Outage clustering: Major Event Days skew City of Peru - (IN) annual minutes differently than routine non-storm reliability.

### City of Peru - (IN) Solar & Battery Evaluators

Compare your actual City of Peru - (IN) monthly kWh statement against 13.25 c/kWh and verify current export tariffs in IN.

### City of Peru - (IN) Outage & Generator Planners

Use City of Peru - (IN)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Peru - (IN) (Indiana) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Peru - (IN)'s residential electricity rate and 2026 solar payback?

City of Peru - (IN) averages 13.25 c/kWh (-2.71 c/kWh vs Indiana average vs. Indiana). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,431/yr (16.5-year payback).

### How reliable is City of Peru - (IN) compared to peer Indiana utilities?

City of Peru - (IN) recorded 62.5 SAIDI outage minutes (1.04 hrs/yr, rank #142 of 751 reporting utilities); compare rates and outage history directly with Southern Indiana R E C, Inc (15.47 c/kWh) across Indiana.

### Which counties and customers does City of Peru - (IN) serve in Indiana?

EIA-861 filings list 8,847 customers across 2 counties including Cass, Miami, with 15 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Peru - (IN).

## Related Pages

Explore Indiana energy benchmarks, Southern Indiana R E C, Inc, county outage profiles, and NEC 705.12 tools alongside City of Peru - (IN).

[Indiana State Energy Rates & Utilities](https://epri-peac.com/states/indiana/) [All Indiana County Power & Outage Profiles](https://epri-peac.com/counties/indiana/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.25 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
