Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Logansport - (IN) (EIA ID 11142, IN) serves 11,507 customers at 10.31 c/kWh (-5.65 c/kWh vs Indiana average) with no standalone IEEE SAIDI filing (1 county served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 11142

- **Res. Rate** : 10.31 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Logansport - (IN) Compare on Tariffs and Reliability?

EIA-861 rate delta (-5.65 c/kWh vs Indiana average), customer scale (11,507), and 2026 solar payback benchmarks for City of Logansport - (IN).

Ranked #166 of 1,989 reporting US utilities for residential rate (top 8.3%; lower than 91.7% of peers), City of Logansport - (IN) serves 11,507 accounts in Indiana (Municipal). Commercial power averages 9.84 c/kWh. It did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 379.0 min/yr), with zero residential net-metered PV reported in 2025 filings.

## Where Does City of Logansport - (IN) Sit Across US Utility Rates?

Positions City of Logansport - (IN) (10.31 c/kWh) across 1,989 US electric utility residential tariffs. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

## How Does City of Logansport - (IN) Rank Across Cost & Reliability?

Percentile placement of City of Logansport - (IN) across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for City of Logansport - (IN)?

Four key EIA-861 rate, outage, and solar payback benchmarks for City of Logansport - (IN) (Municipal) in Indiana. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Lowest Rate #166 / 1,989

### 10.31 c/kWh (-5.65 vs IN)

Commercial avg: 9.84 c/kWh; Industrial: 7.67 c/kWh; est. residential bill $80.99/mo.

State Reliability Context

### 379.0 min/yr (IN Avg)

Utility did not file separate IEEE SAIDI in 2025; Indiana customer-weighted SAIDI is 379.0 min/yr.

Post-25D Payback

### 21.2 Years @ 10.31 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,113/yr at 1,350 kWh/kW.

Service Territory

### 11,507 Customers · 1 County

Serves 1 county including Cass in Indiana; state FEMA declarations (2015-2026): 8.

City of Logansport - (IN) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1031 = $1,113/yr

EIA-861 2025 Utility ID 11142: Rate=10.31 c/kWh, Cust=11,507.

**Result:** 21.2 yr 8 kW cash payback at 10.31 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Logansport - (IN)?

Complete Form EIA-861 filing summary for City of Logansport - (IN) (ID 11142) covering sales, PV, and counties. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Form EIA-861 2025 filing metrics for City of Logansport - (IN) (Utility ID 11142).

| EIA Utility ID & BA Code | ID 11142 · MISO |
|---|---|
| State & Ownership Type | IN · Municipal |
| Retail Electricity Rates | 10.31 c/kWh Res · 9.84 c Comm · 7.67 c Ind |
| Avg Monthly Usage & Bill | 785.2 kWh/mo ($80.99/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Cass) |

## Which Peer Electric Utilities Operate in IN?

Compare City of Logansport - (IN) directly with Bartholomew County Rural E M C and nearby Indiana electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Bartholomew County Rural E M C**](https://epri-peac.com/utilities/in-bartholomew-county-rural-e-m-c-1283/) | 14.53 c | 544.1 min | 59 | 11,493 |
| [**Noble County R E M C**](https://epri-peac.com/utilities/in-noble-county-r-e-m-c-13647/) | 13.36 c | 135.2 min | 75 | 11,036 |
| [**City of Greenfield - (IN)**](https://epri-peac.com/utilities/in-city-of-greenfield-in-7627/) | 13.05 c | 17.2 min | 0 | 12,009 |
| [**Whitewater Valley Rural EMC**](https://epri-peac.com/utilities/in-whitewater-valley-rural-emc-20216/) | 15.39 c | — | 65 | 12,035 |

What to Check & Best-Fit Scenarios

## What Should City of Logansport - (IN) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Logansport - (IN) (Municipal, IN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether City of Logansport - (IN) acts as a wires-only TDU or bundled utility in IN.
- Transformer limits: City of Logansport - (IN) interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.

### City of Logansport - (IN) Solar & Battery Evaluators

Compare your actual City of Logansport - (IN) monthly kWh statement against 10.31 c/kWh and verify current export tariffs in IN.

### City of Logansport - (IN) Outage & Generator Planners

Use City of Logansport - (IN)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Logansport - (IN) (Indiana) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Logansport - (IN)'s residential electricity rate and 2026 solar payback?

City of Logansport - (IN) averages 10.31 c/kWh (-5.65 c/kWh vs Indiana average vs. Indiana). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,113/yr (21.2-year payback).

### How reliable is City of Logansport - (IN) compared to peer Indiana utilities?

City of Logansport - (IN) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 379.0 min/yr); compare rates and outage history directly with Bartholomew County Rural E M C (14.53 c/kWh) across Indiana.

### Which counties and customers does City of Logansport - (IN) serve in Indiana?

EIA-861 filings list 11,507 customers across 1 county including Cass, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Logansport - (IN).

## Related Pages

Explore Indiana energy benchmarks, Bartholomew County Rural E M C, county outage profiles, and NEC 705.12 tools alongside City of Logansport - (IN).

[Indiana State Energy Rates & Utilities](https://epri-peac.com/states/indiana/) [All Indiana County Power & Outage Profiles](https://epri-peac.com/counties/indiana/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 10.31 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)