---
title: "Dynegy Energy Services, LLC (IL) Rate & SAIDI"
url: https://epri-peac.com/utilities/il-dynegy-energy-services-llc-59385/
description: "2025 EIA-861 profile for Dynegy Energy Services, LLC (IL): 7.41 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# Dynegy Energy Services, LLC (IL) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Dynegy Energy Services, LLC (EIA ID 59385, IL) serves 31,847 customers at 7.41 c/kWh (-10.26 c/kWh vs Illinois average) with no standalone IEEE SAIDI filing (0 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 59385

- **Res. Rate** : 7.41 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Dynegy Energy Services, LLC Compare on Tariffs and Reliability?

Solar payback, residential tariff (7.41 c/kWh), and outage history inside Dynegy Energy Services, LLC territory. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

Evaluating solar or generator backup under Dynegy Energy Services, LLC (Illinois) starts with its 7.41 c/kWh residential baseline (-10.26 c/kWh vs Illinois average) and 29.5-year 8 kW cash payback. EIA-861 records show Dynegy Energy Services, LLC did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 145.8 min/yr) across 31,847 accounts.

## Where Does Dynegy Energy Services, LLC Sit Across US Utility Rates?

Benchmarking Dynegy Energy Services, LLC's 7.41 c/kWh residential rate against 1,989 EIA-861 utilities. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

## How Does Dynegy Energy Services, LLC Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Dynegy Energy Services, LLC across Illinois utilities. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

## What Do EIA-861 Benchmarks Show for Dynegy Energy Services, LLC?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Dynegy Energy Services, LLC in 2025.

Lowest Rate #22 / 1,989

### 7.41 c/kWh (-10.26 vs IL)

Commercial avg: 7.08 c/kWh; Industrial: 5.76 c/kWh; est. residential bill $33.20/mo.

State Reliability Context

### 145.8 min/yr (IL Avg)

Utility did not file separate IEEE SAIDI in 2025; Illinois customer-weighted SAIDI is 145.8 min/yr.

Post-25D Payback

### 29.5 Years @ 7.41 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$800/yr at 1,350 kWh/kW.

Service Territory

### 31,847 Customers · 0 Counties

Serves 0 counties in Illinois; state FEMA declarations (2015-2026): 8.

Dynegy Energy Services, LLC Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.0741 = $800/yr

EIA-861 2025 Utility ID 59385: Rate=7.41 c/kWh, Cust=31,847.

**Result:** 29.5 yr 8 kW cash payback at 7.41 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for Dynegy Energy Services, LLC?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 59385. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Form EIA-861 2025 filing metrics for Dynegy Energy Services, LLC (Utility ID 59385).

| EIA Utility ID & BA Code | ID 59385 · PJM |
|---|---|
| State & Ownership Type | IL · Retail Power Marketer |
| Retail Electricity Rates | 7.41 c/kWh Res · 7.08 c Comm · 5.76 c Ind |
| Avg Monthly Usage & Bill | 448.0 kWh/mo ($33.20/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |

## Which Peer Electric Utilities Operate in IL?

Benchmark Dynegy Energy Services, LLC directly against Just Energy Solutions Inc. and peer Illinois retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Just Energy Solutions Inc.**](https://epri-peac.com/utilities/il-just-energy-solutions-inc-4100/) | 11.61 c | — | 0 | 31,576 |
| [**Energy Services Providers, Inc**](https://epri-peac.com/utilities/il-energy-services-providers-inc-55874/) | 13.28 c | — | 0 | 30,668 |
| [**CleanChoice Energy, Inc.**](https://epri-peac.com/utilities/il-cleanchoice-energy-inc-58951/) | 12.31 c | — | 0 | 29,609 |
| [**Corn Belt Energy Corporation**](https://epri-peac.com/utilities/il-corn-belt-energy-corporation-4362/) | 15.59 c | 1,364.8 min | 724 | 34,952 |

What to Check & Best-Fit Scenarios

## What Should Dynegy Energy Services, LLC Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Dynegy Energy Services, LLC (Retail Power Marketer, IL) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: Dynegy Energy Services, LLC (Retail Power Marketer) reports historical 2025 EIA-861 averages rather than live rate-case riders in IL.
- Export credit rules: check Dynegy Energy Services, LLC's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### Dynegy Energy Services, LLC Solar & Battery Evaluators

Compare your actual Dynegy Energy Services, LLC monthly kWh statement against 7.41 c/kWh and verify current export tariffs in IL.

### Dynegy Energy Services, LLC Outage & Generator Planners

Use Dynegy Energy Services, LLC's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Dynegy Energy Services, LLC (Illinois) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Dynegy Energy Services, LLC's residential electricity rate and 2026 solar payback?

Dynegy Energy Services, LLC averages 7.41 c/kWh (-10.26 c/kWh vs Illinois average vs. Illinois). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$800/yr (29.5-year payback).

### How reliable is Dynegy Energy Services, LLC compared to peer Illinois utilities?

Dynegy Energy Services, LLC did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 145.8 min/yr); compare rates and outage history directly with Just Energy Solutions Inc. (11.61 c/kWh) across Illinois.

### Which counties and customers does Dynegy Energy Services, LLC serve in Illinois?

EIA-861 filings list 31,847 customers across 0 counties, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Dynegy Energy Services, LLC.

## Related Pages

Explore Illinois energy benchmarks, Just Energy Solutions Inc., county outage profiles, and NEC 705.12 tools alongside Dynegy Energy Services, LLC.

[Illinois State Energy Rates & Utilities](https://epri-peac.com/states/illinois/) [All Illinois County Power & Outage Profiles](https://epri-peac.com/counties/illinois/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 7.41 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
