title: "Missoula Electric Coop, Inc (ID) Rate & SAIDI"
url: https://epri-peac.com/utilities/id-missoula-electric-coop-inc-12692/
description: "2025 EIA-861 profile for Missoula Electric Coop, Inc (ID): 10.5 c/kWh rate, SAIDI 7.8 min/yr, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# Missoula Electric Coop, Inc (ID) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Missoula Electric Coop, Inc (EIA ID 12692, ID) serves 44 customers at 10.5 c/kWh (-1.33 c/kWh vs Idaho average) with 7.8 min/yr SAIDI (0.13 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 12692

- **Res. Rate** : 10.5 c/kWh

- **SAIDI (All Events)** : 7.8 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Missoula Electric Coop, Inc Compare on Tariffs and Reliability?

How Missoula Electric Coop, Inc (Cooperative) performs across 1 county on kWh rates and outage resilience. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Missoula Electric Coop, Inc (Cooperative) recorded 7.8 SAIDI outage minutes (0.13 hrs/yr, rank #8 of 751 reporting utilities). Typical residential meters drew 1,147.7 kWh/mo ($120.45/mo) in 2025, while its tariff offers a low 10.5 c/kWh residential rate (-8.04 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 20.8 years without federal 25D—compare rates directly with Raft Rural Elec Coop Inc (10.16 c/kWh).

## Where Does Missoula Electric Coop, Inc Sit Across US Utility Rates?

National utility tariff curve marking Missoula Electric Coop, Inc at 10.5 c/kWh vs. 18.54 c/kWh US mean.

## How Does Missoula Electric Coop, Inc Rank Across Cost & Reliability?

Relative ranking of Missoula Electric Coop, Inc on residential electricity pricing and annual IEEE SAIDI outage duration. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

## What Do EIA-861 Benchmarks Show for Missoula Electric Coop, Inc?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Missoula Electric Coop, Inc in Idaho.

Lowest Rate #183 / 1,989

### 10.5 c/kWh (-1.33 vs ID)

Commercial avg: 10.03 c/kWh; est. residential bill $120.45/mo.

Reliability #8 / 751

### 7.8 min/yr (0.13 hrs)

89.7% (7.0 min) from Major Event Days; avg restore 51.9 min (~1.6 kWh @ 1.8 kW).

Post-25D Payback

### 20.8 Years @ 10.5 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,134/yr at 1,350 kWh/kW.

Service Territory

### 44 Customers · 1 County

Serves 1 county including Idaho in Idaho; state FEMA declarations (2015-2026): 26.

Missoula Electric Coop, Inc Reliability & Solar Offset Calculation

Backup_Energy = (51.9 min / 60) * 1.8 kW = 1.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1050 = $1,134/yr

EIA-861 2025 Utility ID 12692: Rate=10.5 c/kWh, Cust=44, SAIDI=7.8 min.

**Result:** 0.13 outage hrs/yr; 20.8 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Missoula Electric Coop, Inc?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Missoula Electric Coop, Inc. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

Form EIA-861 2025 filing metrics for Missoula Electric Coop, Inc (Utility ID 12692).

| EIA Utility ID & BA Code | ID 12692 · BPAT |
|---|---|
| State & Ownership Type | ID · Cooperative |
| Retail Electricity Rates | 10.5 c/kWh Res · 10.03 c Comm |
| Avg Monthly Usage & Bill | 1,147.7 kWh/mo ($120.45/mo est.) |
| SAIDI (All Events w/ MED) | 7.8 min/yr (0.13 hrs/yr) |
| SAIDI (Without Major Events) | 0.8 min/yr (Storm share: 89.7%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.15 /yr · 51.9 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Idaho) |

## Which Peer Electric Utilities Operate in ID?

Nearby Idaho electric utilities of comparable customer size led by Raft Rural Elec Coop Inc (10.16 c/kWh).

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Raft Rural Elec Coop Inc**](https://epri-peac.com/utilities/id-raft-rural-elec-coop-inc-22814/) | 10.16 c | — | 0 | 1,398 |
| [**Lower Valley Energy Inc**](https://epri-peac.com/utilities/id-lower-valley-energy-inc-11273/) | 7.84 c | — | 3 | 1,663 |
| [**Inland Power & Light Company**](https://epri-peac.com/utilities/id-inland-power-light-company-8699/) | 9.45 c | — | 6 | 2,175 |
| [**Salmon River Electric Coop Inc**](https://epri-peac.com/utilities/id-salmon-river-electric-coop-inc-16565/) | 9.87 c | 356.1 min | 0 | 2,426 |

What to Check & Best-Fit Scenarios

## What Should Missoula Electric Coop, Inc Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Missoula Electric Coop, Inc (Cooperative, ID) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: Missoula Electric Coop, Inc (Cooperative) reports historical 2025 EIA-861 averages rather than live rate-case riders in ID.
- Export credit rules: check Missoula Electric Coop, Inc's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### Missoula Electric Coop, Inc Solar & Battery Evaluators

Compare your actual Missoula Electric Coop, Inc monthly kWh statement against 10.5 c/kWh and verify current export tariffs in ID.

### Missoula Electric Coop, Inc Outage & Generator Planners

Use Missoula Electric Coop, Inc's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Missoula Electric Coop, Inc (Idaho) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Missoula Electric Coop, Inc's residential electricity rate and 2026 solar payback?

Missoula Electric Coop, Inc averages 10.5 c/kWh (-1.33 c/kWh vs Idaho average vs. Idaho). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,134/yr (20.8-year payback).

### How reliable is Missoula Electric Coop, Inc compared to peer Idaho utilities?

Missoula Electric Coop, Inc recorded 7.8 SAIDI outage minutes (0.13 hrs/yr, rank #8 of 751 reporting utilities); compare rates and outage history directly with Raft Rural Elec Coop Inc (10.16 c/kWh) across Idaho.

### Which counties and customers does Missoula Electric Coop, Inc serve in Idaho?

EIA-861 filings list 44 customers across 1 county including Idaho, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Missoula Electric Coop, Inc.

## Related Pages

Explore Idaho energy benchmarks, Raft Rural Elec Coop Inc, county outage profiles, and NEC 705.12 tools alongside Missoula Electric Coop, Inc.

[Idaho State Energy Rates & Utilities](https://epri-peac.com/states/idaho/) [All Idaho County Power & Outage Profiles](https://epri-peac.com/counties/idaho/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 10.5 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)