---
title: "Corridor Energy Cooperative (IA) Rate & SAIDI"
url: https://epri-peac.com/utilities/ia-corridor-energy-cooperative-11053/
description: "2025 EIA-861 profile for Corridor Energy Cooperative (IA): 14.18 c/kWh rate, SAIDI 135.0 min/yr, 683 solar systems. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# Corridor Energy Cooperative (IA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Corridor Energy Cooperative (EIA ID 11053, IA) serves 30,992 customers at 14.18 c/kWh (+0.56 c/kWh vs Iowa average) with 135.0 min/yr SAIDI (2.25 hrs/yr) with 683 net-metered residential solar systems (2.2% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 11053

- **Res. Rate** : 14.18 c/kWh

- **SAIDI (All Events)** : 135.0 min/yr

- **Net-Metered PV** : 683 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Corridor Energy Cooperative Compare on Tariffs and Reliability?

Solar payback, residential tariff (14.18 c/kWh), and outage history inside Corridor Energy Cooperative territory. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Evaluating solar or generator backup under Corridor Energy Cooperative (Iowa) starts with its 14.18 c/kWh residential baseline (+0.56 c/kWh vs Iowa average) and 15.4-year 8 kW cash payback. EIA-861 records show Corridor Energy Cooperative recorded 135.0 SAIDI outage minutes (2.25 hrs/yr, rank #304 of 751 reporting utilities) across 30,992 accounts.

## Where Does Corridor Energy Cooperative Sit Across US Utility Rates?

Benchmarking Corridor Energy Cooperative's 14.18 c/kWh residential rate against 1,989 EIA-861 utilities. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

## How Does Corridor Energy Cooperative Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Corridor Energy Cooperative across Iowa utilities. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

## What Do EIA-861 Benchmarks Show for Corridor Energy Cooperative?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Corridor Energy Cooperative in 2025. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Lowest Rate #1,024 / 1,989

### 14.18 c/kWh (+0.56 vs IA)

Commercial avg: 14.08 c/kWh; Industrial: 9.31 c/kWh; est. residential bill $125.74/mo.

Reliability #304 / 751

### 135.0 min/yr (2.25 hrs)

0.0% (0.0 min) from Major Event Days; avg restore 76.4 min (~2.3 kWh @ 1.8 kW).

Post-25D Payback

### 15.4 Years @ 14.18 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,531/yr at 1,350 kWh/kW.

Distributed PV

### 683 Net-Metered Systems

5.519 MW residential PV (2.2% of customers) across 6 counties; state FEMA declarations (2015-2026): 20.

Corridor Energy Cooperative Reliability & Solar Offset Calculation

Backup_Energy = (76.4 min / 60) * 1.8 kW = 2.3 kWh/event | Solar_Offset = 10,800 kWh * $0.1418 = $1,531/yr

EIA-861 2025 Utility ID 11053: Rate=14.18 c/kWh, Cust=30,992, SAIDI=135.0 min, PV=683.

**Result:** 2.25 outage hrs/yr; 15.4 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Corridor Energy Cooperative?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 11053. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

Form EIA-861 2025 filing metrics for Corridor Energy Cooperative (Utility ID 11053).

| EIA Utility ID & BA Code | ID 11053 · MISO |
|---|---|
| State & Ownership Type | IA · Cooperative |
| Retail Electricity Rates | 14.18 c/kWh Res · 14.08 c Comm · 9.31 c Ind |
| Avg Monthly Usage & Bill | 886.9 kWh/mo ($125.74/mo est.) |
| SAIDI (All Events w/ MED) | 135.0 min/yr (2.25 hrs/yr) |
| SAIDI (Without Major Events) | 135.0 min/yr (Storm share: 0.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.766 /yr · 76.4 min restore |
| Residential Net-Metered PV | 683 systems (5.519 MW) |
| Counties Served (Sample) | 6 counties (Benton, Cedar, Iowa, Johnson, Jones, Linn) |

## Which Peer Electric Utilities Operate in IA?

Benchmark Corridor Energy Cooperative directly against City of Ames - (IA) and peer Iowa retail electric power providers. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Ames - (IA)**](https://epri-peac.com/utilities/ia-city-of-ames-ia-554/) | 12.12 c | 21.1 min | 215 | 25,123 |
| [**Eastern Iowa Light & Power Coop**](https://epri-peac.com/utilities/ia-eastern-iowa-light-power-coop-5605/) | 14.81 c | 92.2 min | 330 | 20,472 |
| [**Cedar Falls Utilities**](https://epri-peac.com/utilities/ia-cedar-falls-utilities-3203/) | 11.56 c | — | 78 | 17,746 |
| [**Midland Power Coop**](https://epri-peac.com/utilities/ia-midland-power-coop-12450/) | 13.66 c | — | 18 | 12,083 |

What to Check & Best-Fit Scenarios

## What Should Corridor Energy Cooperative Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Corridor Energy Cooperative (Cooperative, IA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether Corridor Energy Cooperative acts as a wires-only TDU or bundled utility in IA.
- Transformer limits: Corridor Energy Cooperative interconnection engineering still checks neighborhood transformer kVA regardless of 135.0 SAIDI.

### Corridor Energy Cooperative Solar & Battery Evaluators

Compare your actual Corridor Energy Cooperative monthly kWh statement against 14.18 c/kWh and verify current export tariffs in IA.

### Corridor Energy Cooperative Outage & Generator Planners

Use Corridor Energy Cooperative's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Corridor Energy Cooperative (Iowa) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

### What is Corridor Energy Cooperative's residential electricity rate and 2026 solar payback?

Corridor Energy Cooperative averages 14.18 c/kWh (+0.56 c/kWh vs Iowa average vs. Iowa). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,531/yr (15.4-year payback).

### How reliable is Corridor Energy Cooperative compared to peer Iowa utilities?

Corridor Energy Cooperative recorded 135.0 SAIDI outage minutes (2.25 hrs/yr, rank #304 of 751 reporting utilities); compare rates and outage history directly with City of Ames - (IA) (12.12 c/kWh) across Iowa.

### Which counties and customers does Corridor Energy Cooperative serve in Iowa?

EIA-861 filings list 30,992 customers across 6 counties including Benton, Cedar, Iowa, with 683 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Corridor Energy Cooperative.

## Related Pages

Explore Iowa energy benchmarks, City of Ames - (IA), county outage profiles, and NEC 705.12 tools alongside Corridor Energy Cooperative.

[Iowa State Energy Rates & Utilities](https://epri-peac.com/states/iowa/) [All Iowa County Power & Outage Profiles](https://epri-peac.com/counties/iowa/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 14.18 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
