---
title: "City of Preston - (IA) (IA) Rate & SAIDI"
url: https://epri-peac.com/utilities/ia-city-of-preston-ia-15349/
description: "2025 EIA-861 profile for City of Preston - (IA) (IA): 13.75 c/kWh rate, SAIDI Not reported in EIA-861, 2 solar systems. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# City of Preston - (IA) (IA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Preston - (IA) (EIA ID 15349, IA) serves 502 customers at 13.75 c/kWh (+0.13 c/kWh vs Iowa average) with no standalone IEEE SAIDI filing (1 county served) with 2 net-metered residential solar systems (0.4% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 15349

- **Res. Rate** : 13.75 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 2 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Preston - (IA) Compare on Tariffs and Reliability?

Solar payback, residential tariff (13.75 c/kWh), and outage history inside City of Preston - (IA) territory. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Homeowners inside City of Preston - (IA)'s Iowa footprint (1 county including Jackson) face 13.75 c/kWh benchmark pricing (-4.79 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 15.9 years. Reliability data did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 183.2 min/yr).

## Where Does City of Preston - (IA) Sit Across US Utility Rates?

Benchmarking City of Preston - (IA)'s 13.75 c/kWh residential rate against 1,989 EIA-861 utilities. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

## How Does City of Preston - (IA) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of Preston - (IA) across Iowa utilities. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

## What Do EIA-861 Benchmarks Show for City of Preston - (IA)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of Preston - (IA) in 2025.

Lowest Rate #888 / 1,989

### 13.75 c/kWh (+0.13 vs IA)

Commercial avg: 11.61 c/kWh; est. residential bill $92.28/mo.

State Reliability Context

### 183.2 min/yr (IA Avg)

Utility did not file separate IEEE SAIDI in 2025; Iowa customer-weighted SAIDI is 183.2 min/yr.

Post-25D Payback

### 15.9 Years @ 13.75 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,485/yr at 1,350 kWh/kW.

Distributed PV

### 2 Net-Metered Systems

0.014 MW residential PV (0.4% of customers) across 1 county; state FEMA declarations (2015-2026): 20.

City of Preston - (IA) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1375 = $1,485/yr

EIA-861 2025 Utility ID 15349: Rate=13.75 c/kWh, Cust=502, PV=2.

**Result:** 15.9 yr 8 kW cash payback at 13.75 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Preston - (IA)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 15349. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Form EIA-861 2025 filing metrics for City of Preston - (IA) (Utility ID 15349).

| EIA Utility ID & BA Code | ID 15349 · MISO |
|---|---|
| State & Ownership Type | IA · Municipal |
| Retail Electricity Rates | 13.75 c/kWh Res · 11.61 c Comm |
| Avg Monthly Usage & Bill | 671.3 kWh/mo ($92.28/mo est.) |
| Residential Net-Metered PV | 2 systems (0.014 MW) |
| Counties Served (Sample) | 1 county (Jackson) |

## Which Peer Electric Utilities Operate in IA?

Benchmark City of Preston - (IA) directly against City of Coon Rapids -(IA) and peer Iowa retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Coon Rapids -(IA)**](https://epri-peac.com/utilities/ia-city-of-coon-rapids-ia-4305/) | 9.78 c | — | 0 | 630 |
| [**Amana Society Service Co**](https://epri-peac.com/utilities/ia-amana-society-service-co-471/) | 17.02 c | — | 0 | 709 |
| [**Federated Rural Electric Assn**](https://epri-peac.com/utilities/ia-federated-rural-electric-assn-6258/) | 12.89 c | — | 0 | 53 |
| [**Freeborn Mower Electric Cooperative**](https://epri-peac.com/utilities/ia-freeborn-mower-electric-cooperative-6782/) | 14.63 c | — | 0 | 6 |

What to Check & Best-Fit Scenarios

## What Should City of Preston - (IA) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Preston - (IA) (Municipal, IA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: City of Preston - (IA)'s 13.75 c/kWh blended residential rate in IA does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: City of Preston - (IA) system-wide SAIDI averages rural and urban circuits across its IA territory or nearby City of Coon Rapids -(IA).

### City of Preston - (IA) Solar & Battery Evaluators

Compare your actual City of Preston - (IA) monthly kWh statement against 13.75 c/kWh and verify current export tariffs in IA.

### City of Preston - (IA) Outage & Generator Planners

Use City of Preston - (IA)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Preston - (IA) (Iowa) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Preston - (IA)'s residential electricity rate and 2026 solar payback?

City of Preston - (IA) averages 13.75 c/kWh (+0.13 c/kWh vs Iowa average vs. Iowa). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,485/yr (15.9-year payback).

### How reliable is City of Preston - (IA) compared to peer Iowa utilities?

City of Preston - (IA) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 183.2 min/yr); compare rates and outage history directly with City of Coon Rapids -(IA) (9.78 c/kWh) across Iowa.

### Which counties and customers does City of Preston - (IA) serve in Iowa?

EIA-861 filings list 502 customers across 1 county including Jackson, with 2 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Preston - (IA).

## Related Pages

Explore Iowa energy benchmarks, City of Coon Rapids -(IA), county outage profiles, and NEC 705.12 tools alongside City of Preston - (IA).

[Iowa State Energy Rates & Utilities](https://epri-peac.com/states/iowa/) [All Iowa County Power & Outage Profiles](https://epri-peac.com/counties/iowa/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.75 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
