Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Thomasville - (GA) (EIA ID 18848, GA) serves 14,275 customers at 13.59 c/kWh (-1.15 c/kWh vs Georgia average) with 160.9 min/yr SAIDI (2.68 hrs/yr) with 5 net-metered residential solar systems (0.04% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 18848

- **Res. Rate** : 13.59 c/kWh

- **SAIDI (All Events)** : 160.9 min/yr

- **Net-Metered PV** : 5 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Thomasville - (GA) Compare on Tariffs and Reliability?

How City of Thomasville - (GA) (Municipal) performs across 2 counties on kWh rates and outage resilience. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Across 2 counties including Grady, Thomas, City of Thomasville - (GA) bills residential power at 13.59 c/kWh (-1.15 c/kWh vs Georgia average vs. Georgia), offsetting ~$1,468/yr on an 8 kW array compared to peer City of Lawrenceville - (GA) (15.01 c/kWh). With 14,275 customer accounts (Municipal), 2025 Form EIA-861 shows City of Thomasville - (GA) recorded 160.9 SAIDI outage minutes (2.68 hrs/yr, rank #349 of 751 reporting utilities), with 5 net-metered residential solar systems (0.04% customer adoption).

## Where Does City of Thomasville - (GA) Sit Across US Utility Rates?

National utility tariff curve marking City of Thomasville - (GA) at 13.59 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Thomasville - (GA) Rank Across Cost & Reliability?

Relative ranking of City of Thomasville - (GA) on residential electricity pricing and annual IEEE SAIDI outage duration. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

## What Do EIA-861 Benchmarks Show for City of Thomasville - (GA)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Thomasville - (GA) in Georgia.

Lowest Rate #845 / 1,989

### 13.59 c/kWh (-1.15 vs GA)

Commercial avg: 11.34 c/kWh; est. residential bill $156.86/mo.

Reliability #349 / 751

### 160.9 min/yr (2.68 hrs)

21.6% (34.7 min) from Major Event Days; avg restore 74.1 min (~2.2 kWh @ 1.8 kW).

Post-25D Payback

### 16.1 Years @ 13.59 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,468/yr at 1,350 kWh/kW.

Distributed PV

### 5 Net-Metered Systems

0.046 MW residential PV (0.04% of customers) across 2 counties; state FEMA declarations (2015-2026): 27.

City of Thomasville - (GA) Reliability & Solar Offset Calculation

Backup_Energy = (74.1 min / 60) * 1.8 kW = 2.2 kWh/event | Solar_Offset = 10,800 kWh * $0.1359 = $1,468/yr

EIA-861 2025 Utility ID 18848: Rate=13.59 c/kWh, Cust=14,275, SAIDI=160.9 min, PV=5.

**Result:** 2.68 outage hrs/yr; 16.1 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Thomasville - (GA)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Thomasville - (GA). Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Form EIA-861 2025 filing metrics for City of Thomasville - (GA) (Utility ID 18848).

| EIA Utility ID & BA Code | ID 18848 · SOCO |
|---|---|
| State & Ownership Type | GA · Municipal |
| Retail Electricity Rates | 13.59 c/kWh Res · 11.34 c Comm |
| Avg Monthly Usage & Bill | 1,154.4 kWh/mo ($156.86/mo est.) |
| SAIDI (All Events w/ MED) | 160.9 min/yr (2.68 hrs/yr) |
| SAIDI (Without Major Events) | 126.2 min/yr (Storm share: 21.6%) |
| SAIFI & CAIDI (Per-Outage Avg) | 2.172 /yr · 74.1 min restore |
| Residential Net-Metered PV | 5 systems (0.046 MW) |
| Counties Served (Sample) | 2 counties (Grady, Thomas) |

## Which Peer Electric Utilities Operate in GA?

Nearby Georgia electric utilities of comparable customer size led by City of Lawrenceville - (GA) (15.01 c/kWh). Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Lawrenceville - (GA)**](https://epri-peac.com/utilities/ga-city-of-lawrenceville-ga-10800/) | 15.01 c | — | 19 | 14,747 |
| [**Three Notch Elec Member Corp**](https://epri-peac.com/utilities/ga-three-notch-elec-member-corp-18499/) | 16.91 c | — | 48 | 13,680 |
| [**City of Griffin - (GA)**](https://epri-peac.com/utilities/ga-city-of-griffin-ga-7679/) | 14.95 c | — | 0 | 13,584 |
| [**Dalton Utilities**](https://epri-peac.com/utilities/ga-dalton-utilities-4744/) | 10.34 c | — | 0 | 13,473 |

What to Check & Best-Fit Scenarios

## What Should City of Thomasville - (GA) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Thomasville - (GA) (Municipal, GA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: City of Thomasville - (GA)'s 13.59 c/kWh blended residential rate in GA does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: City of Thomasville - (GA) system-wide SAIDI averages rural and urban circuits across its GA territory or nearby City of Lawrenceville - (GA).

### City of Thomasville - (GA) Solar & Battery Evaluators

Compare your actual City of Thomasville - (GA) monthly kWh statement against 13.59 c/kWh and verify current export tariffs in GA.

### City of Thomasville - (GA) Outage & Generator Planners

Use City of Thomasville - (GA)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Thomasville - (GA) (Georgia) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Thomasville - (GA)'s residential electricity rate and 2026 solar payback?

City of Thomasville - (GA) averages 13.59 c/kWh (-1.15 c/kWh vs Georgia average vs. Georgia). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,468/yr (16.1-year payback).

### How reliable is City of Thomasville - (GA) compared to peer Georgia utilities?

City of Thomasville - (GA) recorded 160.9 SAIDI outage minutes (2.68 hrs/yr, rank #349 of 751 reporting utilities); compare rates and outage history directly with City of Lawrenceville - (GA) (15.01 c/kWh) across Georgia.

### Which counties and customers does City of Thomasville - (GA) serve in Georgia?

EIA-861 filings list 14,275 customers across 2 counties including Grady, Thomas, with 5 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Thomasville - (GA).

## Related Pages

Explore Georgia energy benchmarks, City of Lawrenceville - (GA), county outage profiles, and NEC 705.12 tools alongside City of Thomasville - (GA).

[Georgia State Energy Rates & Utilities](https://epri-peac.com/states/georgia/) [All Georgia County Power & Outage Profiles](https://epri-peac.com/counties/georgia/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.59 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)