---
title: "City of Griffin - (GA) (GA) Rate & SAIDI"
url: https://epri-peac.com/utilities/ga-city-of-griffin-ga-7679/
description: "2025 EIA-861 profile for City of Griffin - (GA) (GA): 14.95 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# City of Griffin - (GA) (GA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Griffin - (GA) (EIA ID 7679, GA) serves 13,584 customers at 14.95 c/kWh (+0.21 c/kWh vs Georgia average) with no standalone IEEE SAIDI filing (3 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 7679

- **Res. Rate** : 14.95 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Griffin - (GA) Compare on Tariffs and Reliability?

EIA-861 rate delta (+0.21 c/kWh vs Georgia average), customer scale (13,584), and 2026 solar payback benchmarks for City of Griffin - (GA).

Ranked #1,205 of 1,989 reporting US utilities for residential rate (above US utility median; lower than 39.4% of peers), City of Griffin - (GA) serves 13,584 accounts in Georgia (Municipal). Commercial power averages 15.29 c/kWh. It did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 268.9 min/yr), with zero residential net-metered PV reported in 2025 filings.

## Where Does City of Griffin - (GA) Sit Across US Utility Rates?

Positions City of Griffin - (GA) (14.95 c/kWh) across 1,989 US electric utility residential tariffs. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

## How Does City of Griffin - (GA) Rank Across Cost & Reliability?

Percentile placement of City of Griffin - (GA) across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for City of Griffin - (GA)?

Four key EIA-861 rate, outage, and solar payback benchmarks for City of Griffin - (GA) (Municipal) in Georgia. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Lowest Rate #1,205 / 1,989

### 14.95 c/kWh (+0.21 vs GA)

Commercial avg: 15.29 c/kWh; Industrial: 10.14 c/kWh; est. residential bill $150.96/mo.

State Reliability Context

### 268.9 min/yr (GA Avg)

Utility did not file separate IEEE SAIDI in 2025; Georgia customer-weighted SAIDI is 268.9 min/yr.

Post-25D Payback

### 14.6 Years @ 14.95 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,615/yr at 1,350 kWh/kW.

Service Territory

### 13,584 Customers · 3 Counties

Serves 3 counties including Lamar, Pike, Spalding in Georgia; state FEMA declarations (2015-2026): 27.

City of Griffin - (GA) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1495 = $1,615/yr

EIA-861 2025 Utility ID 7679: Rate=14.95 c/kWh, Cust=13,584.

**Result:** 14.6 yr 8 kW cash payback at 14.95 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Griffin - (GA)?

Complete Form EIA-861 filing summary for City of Griffin - (GA) (ID 7679) covering sales, PV, and counties. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

Form EIA-861 2025 filing metrics for City of Griffin - (GA) (Utility ID 7679).

| EIA Utility ID & BA Code | ID 7679 · SOCO |
|---|---|
| State & Ownership Type | GA · Municipal |
| Retail Electricity Rates | 14.95 c/kWh Res · 15.29 c Comm · 10.14 c Ind |
| Avg Monthly Usage & Bill | 1,009.8 kWh/mo ($150.96/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 3 counties (Lamar, Pike, Spalding) |

## Which Peer Electric Utilities Operate in GA?

Compare City of Griffin - (GA) directly with Three Notch Elec Member Corp and nearby Georgia electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Three Notch Elec Member Corp**](https://epri-peac.com/utilities/ga-three-notch-elec-member-corp-18499/) | 16.91 c | — | 48 | 13,680 |
| [**Dalton Utilities**](https://epri-peac.com/utilities/ga-dalton-utilities-4744/) | 10.34 c | — | 0 | 13,473 |
| [**City of Covington - (GA)**](https://epri-peac.com/utilities/ga-city-of-covington-ga-4433/) | 14.82 c | — | 0 | 13,302 |
| [**Tri-State Electric Member Corp**](https://epri-peac.com/utilities/ga-tri-state-electric-member-corp-19154/) | 14.9 c | — | 0 | 13,218 |

What to Check & Best-Fit Scenarios

## What Should City of Griffin - (GA) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Griffin - (GA) (Municipal, GA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: City of Griffin - (GA) (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in GA.
- Export credit rules: check City of Griffin - (GA)'s active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### City of Griffin - (GA) Solar & Battery Evaluators

Compare your actual City of Griffin - (GA) monthly kWh statement against 14.95 c/kWh and verify current export tariffs in GA.

### City of Griffin - (GA) Outage & Generator Planners

Use City of Griffin - (GA)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Griffin - (GA) (Georgia) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Griffin - (GA)'s residential electricity rate and 2026 solar payback?

City of Griffin - (GA) averages 14.95 c/kWh (+0.21 c/kWh vs Georgia average vs. Georgia). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,615/yr (14.6-year payback).

### How reliable is City of Griffin - (GA) compared to peer Georgia utilities?

City of Griffin - (GA) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 268.9 min/yr); compare rates and outage history directly with Three Notch Elec Member Corp (16.91 c/kWh) across Georgia.

### Which counties and customers does City of Griffin - (GA) serve in Georgia?

EIA-861 filings list 13,584 customers across 3 counties including Lamar, Pike, Spalding, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Griffin - (GA).

## Related Pages

Explore Georgia energy benchmarks, Three Notch Elec Member Corp, county outage profiles, and NEC 705.12 tools alongside City of Griffin - (GA).

[Georgia State Energy Rates & Utilities](https://epri-peac.com/states/georgia/) [All Georgia County Power & Outage Profiles](https://epri-peac.com/counties/georgia/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 14.95 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
