title: "City of East Point - (GA) (GA) Rate & SAIDI"
url: https://epri-peac.com/utilities/ga-city-of-east-point-ga-5582/
description: "2025 EIA-861 profile for City of East Point - (GA) (GA): 11.99 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# City of East Point - (GA) (GA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of East Point - (GA) (EIA ID 5582, GA) serves 16,204 customers at 11.99 c/kWh (-2.75 c/kWh vs Georgia average) with no standalone IEEE SAIDI filing (1 county served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 5582

- **Res. Rate** : 11.99 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of East Point - (GA) Compare on Tariffs and Reliability?

Solar payback, residential tariff (11.99 c/kWh), and outage history inside City of East Point - (GA) territory. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Evaluating solar or generator backup under City of East Point - (GA) (Georgia) starts with its 11.99 c/kWh residential baseline (-2.75 c/kWh vs Georgia average) and 18.2-year 8 kW cash payback. EIA-861 records show City of East Point - (GA) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 268.9 min/yr) across 16,204 accounts.

## Where Does City of East Point - (GA) Sit Across US Utility Rates?

Benchmarking City of East Point - (GA)'s 11.99 c/kWh residential rate against 1,989 EIA-861 utilities. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

## How Does City of East Point - (GA) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of East Point - (GA) across Georgia utilities. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

## What Do EIA-861 Benchmarks Show for City of East Point - (GA)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of East Point - (GA) in 2025.

Lowest Rate #399 / 1,989

### 11.99 c/kWh (-2.75 vs GA)

Commercial avg: 11.31 c/kWh; est. residential bill $100.39/mo.

State Reliability Context

### 268.9 min/yr (GA Avg)

Utility did not file separate IEEE SAIDI in 2025; Georgia customer-weighted SAIDI is 268.9 min/yr.

Post-25D Payback

### 18.2 Years @ 11.99 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,295/yr at 1,350 kWh/kW.

Service Territory

### 16,204 Customers · 1 County

Serves 1 county including Fulton in Georgia; state FEMA declarations (2015-2026): 27.

City of East Point - (GA) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1199 = $1,295/yr

EIA-861 2025 Utility ID 5582: Rate=11.99 c/kWh, Cust=16,204.

**Result:** 18.2 yr 8 kW cash payback at 11.99 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of East Point - (GA)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 5582. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Form EIA-861 2025 filing metrics for City of East Point - (GA) (Utility ID 5582).

| EIA Utility ID & BA Code | ID 5582 · SOCO |
|---|---|
| State & Ownership Type | GA · Municipal |
| Retail Electricity Rates | 11.99 c/kWh Res · 11.31 c Comm |
| Avg Monthly Usage & Bill | 837.6 kWh/mo ($100.39/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Fulton) |

## Which Peer Electric Utilities Operate in GA?

Benchmark City of East Point - (GA) directly against Planters Electric Member Corp and peer Georgia retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Planters Electric Member Corp**](https://epri-peac.com/utilities/ga-planters-electric-member-corp-14649/) | 14.85 c | — | 55 | 16,417 |
| [**Rayle Electric Membership Corp**](https://epri-peac.com/utilities/ga-rayle-electric-membership-corp-15700/) | 14.64 c | 473.8 min | 87 | 16,474 |
| [**Washington Elec Member Corp**](https://epri-peac.com/utilities/ga-washington-elec-member-corp-20146/) | 15.36 c | 1,789.3 min | 30 | 15,170 |
| [**Sumter Electric Member Corp**](https://epri-peac.com/utilities/ga-sumter-electric-member-corp-18305/) | 14.62 c | 159.4 min | 68 | 15,145 |

What to Check & Best-Fit Scenarios

## What Should City of East Point - (GA) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of East Point - (GA) (Municipal, GA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether City of East Point - (GA) acts as a wires-only TDU or bundled utility in GA.
- Transformer limits: City of East Point - (GA) interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.

### City of East Point - (GA) Solar & Battery Evaluators

Compare your actual City of East Point - (GA) monthly kWh statement against 11.99 c/kWh and verify current export tariffs in GA.

### City of East Point - (GA) Outage & Generator Planners

Use City of East Point - (GA)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of East Point - (GA) (Georgia) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of East Point - (GA)'s residential electricity rate and 2026 solar payback?

City of East Point - (GA) averages 11.99 c/kWh (-2.75 c/kWh vs Georgia average vs. Georgia). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,295/yr (18.2-year payback).

### How reliable is City of East Point - (GA) compared to peer Georgia utilities?

City of East Point - (GA) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 268.9 min/yr); compare rates and outage history directly with Planters Electric Member Corp (14.85 c/kWh) across Georgia.

### Which counties and customers does City of East Point - (GA) serve in Georgia?

EIA-861 filings list 16,204 customers across 1 county including Fulton, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of East Point - (GA).

## Related Pages

Explore Georgia energy benchmarks, Planters Electric Member Corp, county outage profiles, and NEC 705.12 tools alongside City of East Point - (GA).

[Georgia State Energy Rates & Utilities](https://epri-peac.com/states/georgia/) [All Georgia County Power & Outage Profiles](https://epri-peac.com/counties/georgia/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 11.99 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)