---
title: "City of Douglas (GA) Rate & SAIDI"
url: https://epri-peac.com/utilities/ga-city-of-douglas-5325/
description: "2025 EIA-861 profile for City of Douglas (GA): 10.42 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# City of Douglas (GA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Douglas (EIA ID 5325, GA) serves 4,129 customers at 10.42 c/kWh (-4.32 c/kWh vs Georgia average) with no standalone IEEE SAIDI filing (1 county served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 5325

- **Res. Rate** : 10.42 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Douglas Compare on Tariffs and Reliability?

EIA-861 rate delta (-4.32 c/kWh vs Georgia average), customer scale (4,129), and 2026 solar payback benchmarks for City of Douglas.

Serving 4,129 customers across 1 county including Coffee in Georgia, City of Douglas (Municipal, Balancing Authority SOCO) offers a low 10.42 c/kWh residential rate (-8.12 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 21.0 years without federal 25D. Grid filings show the utility did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 268.9 min/yr), with zero residential net-metered PV reported in 2025 filings.

## Where Does City of Douglas Sit Across US Utility Rates?

Positions City of Douglas (10.42 c/kWh) across 1,989 US electric utility residential tariffs. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

## How Does City of Douglas Rank Across Cost & Reliability?

Percentile placement of City of Douglas across retail kWh electricity cost and IEEE grid reliability outage metrics. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

## What Do EIA-861 Benchmarks Show for City of Douglas?

Four key EIA-861 rate, outage, and solar payback benchmarks for City of Douglas (Municipal) in Georgia. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

Lowest Rate #178 / 1,989

### 10.42 c/kWh (-4.32 vs GA)

Commercial avg: 9.08 c/kWh; Industrial: 7.93 c/kWh; est. residential bill $122.97/mo.

State Reliability Context

### 268.9 min/yr (GA Avg)

Utility did not file separate IEEE SAIDI in 2025; Georgia customer-weighted SAIDI is 268.9 min/yr.

Post-25D Payback

### 21.0 Years @ 10.42 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,125/yr at 1,350 kWh/kW.

Service Territory

### 4,129 Customers · 1 County

Serves 1 county including Coffee in Georgia; state FEMA declarations (2015-2026): 27.

City of Douglas Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1042 = $1,125/yr

EIA-861 2025 Utility ID 5325: Rate=10.42 c/kWh, Cust=4,129.

**Result:** 21.0 yr 8 kW cash payback at 10.42 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Douglas?

Complete Form EIA-861 filing summary for City of Douglas (ID 5325) covering sales, PV, and counties. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Form EIA-861 2025 filing metrics for City of Douglas (Utility ID 5325).

| EIA Utility ID & BA Code | ID 5325 · SOCO |
|---|---|
| State & Ownership Type | GA · Municipal |
| Retail Electricity Rates | 10.42 c/kWh Res · 9.08 c Comm · 7.93 c Ind |
| Avg Monthly Usage & Bill | 1,180.5 kWh/mo ($122.97/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Coffee) |

## Which Peer Electric Utilities Operate in GA?

Compare City of Douglas directly with City of Calhoun - (GA) and nearby Georgia electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Calhoun - (GA)**](https://epri-peac.com/utilities/ga-city-of-calhoun-ga-2812/) | 14.03 c | 116.6 min | 12 | 5,042 |
| [**City of Buford**](https://epri-peac.com/utilities/ga-city-of-buford-2487/) | 13.43 c | — | 8 | 3,004 |
| [**City of Sandersville - (GA)**](https://epri-peac.com/utilities/ga-city-of-sandersville-ga-16637/) | 10.51 c | — | 0 | 2,215 |
| [**City of Sylvania - (GA)**](https://epri-peac.com/utilities/ga-city-of-sylvania-ga-18397/) | 13.39 c | — | 0 | 1,909 |

What to Check & Best-Fit Scenarios

## What Should City of Douglas Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Douglas (Municipal, GA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: City of Douglas's 10.42 c/kWh blended residential rate in GA does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: City of Douglas system-wide SAIDI averages rural and urban circuits across its GA territory or nearby City of Calhoun - (GA).

### City of Douglas Solar & Battery Evaluators

Compare your actual City of Douglas monthly kWh statement against 10.42 c/kWh and verify current export tariffs in GA.

### City of Douglas Outage & Generator Planners

Use City of Douglas's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Douglas (Georgia) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

### What is City of Douglas's residential electricity rate and 2026 solar payback?

City of Douglas averages 10.42 c/kWh (-4.32 c/kWh vs Georgia average vs. Georgia). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,125/yr (21.0-year payback).

### How reliable is City of Douglas compared to peer Georgia utilities?

City of Douglas did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 268.9 min/yr); compare rates and outage history directly with City of Calhoun - (GA) (14.03 c/kWh) across Georgia.

### Which counties and customers does City of Douglas serve in Georgia?

EIA-861 filings list 4,129 customers across 1 county including Coffee, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Douglas.

## Related Pages

Explore Georgia energy benchmarks, City of Calhoun - (GA), county outage profiles, and NEC 705.12 tools alongside City of Douglas.

[Georgia State Energy Rates & Utilities](https://epri-peac.com/states/georgia/) [All Georgia County Power & Outage Profiles](https://epri-peac.com/counties/georgia/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 10.42 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
