Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of College Park - (GA) (EIA ID 3939, GA) serves 7,794 customers at 11.89 c/kWh (-2.85 c/kWh vs Georgia average) with no standalone IEEE SAIDI filing (3 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 3939

- **Res. Rate** : 11.89 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of College Park - (GA) Compare on Tariffs and Reliability?

How City of College Park - (GA) (Municipal) performs across 3 counties on kWh rates and outage resilience. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

City of College Park - (GA) (Municipal) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 268.9 min/yr). Typical residential meters drew 821.2 kWh/mo ($97.63/mo) in 2025, while its tariff offers a low 11.89 c/kWh residential rate (-6.65 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 18.4 years without federal 25D—compare rates directly with City of Cartersville - (GA) (14.58 c/kWh).

## Where Does City of College Park - (GA) Sit Across US Utility Rates?

National utility tariff curve marking City of College Park - (GA) at 11.89 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of College Park - (GA) Rank Across Cost & Reliability?

Relative ranking of City of College Park - (GA) on residential electricity pricing and annual IEEE SAIDI outage duration.

## What Do EIA-861 Benchmarks Show for City of College Park - (GA)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of College Park - (GA) in Georgia.

Lowest Rate #378 / 1,989

### 11.89 c/kWh (-2.85 vs GA)

Commercial avg: 8.72 c/kWh; est. residential bill $97.63/mo.

State Reliability Context

### 268.9 min/yr (GA Avg)

Utility did not file separate IEEE SAIDI in 2025; Georgia customer-weighted SAIDI is 268.9 min/yr.

Post-25D Payback

### 18.4 Years @ 11.89 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,284/yr at 1,350 kWh/kW.

Service Territory

### 7,794 Customers · 3 Counties

Serves 3 counties including Clayton, Fulton, Henry in Georgia; state FEMA declarations (2015-2026): 27.

City of College Park - (GA) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1189 = $1,284/yr

EIA-861 2025 Utility ID 3939: Rate=11.89 c/kWh, Cust=7,794.

**Result:** 18.4 yr 8 kW cash payback at 11.89 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of College Park - (GA)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of College Park - (GA). Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

Form EIA-861 2025 filing metrics for City of College Park - (GA) (Utility ID 3939).

| EIA Utility ID & BA Code | ID 3939 · SOCO |
|---|---|
| State & Ownership Type | GA · Municipal |
| Retail Electricity Rates | 11.89 c/kWh Res · 8.72 c Comm |
| Avg Monthly Usage & Bill | 821.2 kWh/mo ($97.63/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 3 counties (Clayton, Fulton, Henry) |

## Which Peer Electric Utilities Operate in GA?

Nearby Georgia electric utilities of comparable customer size led by City of Cartersville - (GA) (14.58 c/kWh). Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Cartersville - (GA)**](https://epri-peac.com/utilities/ga-city-of-cartersville-ga-3108/) | 14.58 c | — | 0 | 7,507 |
| [**Crisp County Power Comm**](https://epri-peac.com/utilities/ga-crisp-county-power-comm-4538/) | 17.84 c | 203.7 min | 6 | 9,210 |
| [**Newnan Wtr, Sewer & Light Comm**](https://epri-peac.com/utilities/ga-newnan-wtr-sewer-light-comm-13547/) | 13.21 c | — | 0 | 9,259 |
| [**City of Calhoun - (GA)**](https://epri-peac.com/utilities/ga-city-of-calhoun-ga-2812/) | 14.03 c | 116.6 min | 12 | 5,042 |

What to Check & Best-Fit Scenarios

## What Should City of College Park - (GA) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of College Park - (GA) (Municipal, GA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: City of College Park - (GA) (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in GA.
- Export credit rules: check City of College Park - (GA)'s active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### City of College Park - (GA) Solar & Battery Evaluators

Compare your actual City of College Park - (GA) monthly kWh statement against 11.89 c/kWh and verify current export tariffs in GA.

### City of College Park - (GA) Outage & Generator Planners

Use City of College Park - (GA)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of College Park - (GA) (Georgia) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of College Park - (GA)'s residential electricity rate and 2026 solar payback?

City of College Park - (GA) averages 11.89 c/kWh (-2.85 c/kWh vs Georgia average vs. Georgia). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,284/yr (18.4-year payback).

### How reliable is City of College Park - (GA) compared to peer Georgia utilities?

City of College Park - (GA) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 268.9 min/yr); compare rates and outage history directly with City of Cartersville - (GA) (14.58 c/kWh) across Georgia.

### Which counties and customers does City of College Park - (GA) serve in Georgia?

EIA-861 filings list 7,794 customers across 3 counties including Clayton, Fulton, Henry, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of College Park - (GA).

## Related Pages

Explore Georgia energy benchmarks, City of Cartersville - (GA), county outage profiles, and NEC 705.12 tools alongside City of College Park - (GA).

[Georgia State Energy Rates & Utilities](https://epri-peac.com/states/georgia/) [All Georgia County Power & Outage Profiles](https://epri-peac.com/counties/georgia/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 11.89 c/kWh rates.