EIA-861 Grid Reliability & Net Metering

# Blue Ridge Mountain EMC - (GA) (GA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Blue Ridge Mountain EMC - (GA) (EIA ID 1891, GA) serves 30,863 customers at 14.81 c/kWh (+0.07 c/kWh vs Georgia average) with 518.7 min/yr SAIDI (8.65 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 1891

- **Res. Rate** : 14.81 c/kWh

- **SAIDI (All Events)** : 518.7 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Blue Ridge Mountain EMC - (GA) Compare on Tariffs and Reliability?

EIA-861 rate delta (+0.07 c/kWh vs Georgia average), customer scale (30,863), and 2026 solar payback benchmarks for Blue Ridge Mountain EMC - (GA).

Serving 30,863 customers across 4 counties including Fannin, Gilmer, Towns in Georgia, Blue Ridge Mountain EMC - (GA) (Cooperative, Balancing Authority TVA) bills residential power at 14.81 c/kWh (+0.07 c/kWh vs Georgia average vs. Georgia), offsetting ~$1,599/yr on an 8 kW array. Grid filings show the utility logged 518.7 SAIDI outage minutes (8.65 hrs/yr, 44.3% storm-driven), making battery backup or a standby ATS worthwhile, with zero residential net-metered PV reported in 2025 filings.

## Where Does Blue Ridge Mountain EMC - (GA) Sit Across US Utility Rates?

Positions Blue Ridge Mountain EMC - (GA) (14.81 c/kWh) across 1,989 US electric utility residential tariffs. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

## How Does Blue Ridge Mountain EMC - (GA) Rank Across Cost & Reliability?

Percentile placement of Blue Ridge Mountain EMC - (GA) across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for Blue Ridge Mountain EMC - (GA)?

Four key EIA-861 rate, outage, and solar payback benchmarks for Blue Ridge Mountain EMC - (GA) (Cooperative) in Georgia.

Lowest Rate #1,175 / 1,989

### 14.81 c/kWh (+0.07 vs GA)

Commercial avg: 15.87 c/kWh; est. residential bill $141.39/mo.

Reliability #640 / 751

### 518.7 min/yr (8.65 hrs)

44.3% (229.6 min) from Major Event Days; avg restore 139.1 min (~4.2 kWh @ 1.8 kW).

Post-25D Payback

### 14.8 Years @ 14.81 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,599/yr at 1,350 kWh/kW.

Service Territory

### 30,863 Customers · 4 Counties

Serves 4 counties including Fannin, Gilmer, Towns in Georgia; state FEMA declarations (2015-2026): 27.

Blue Ridge Mountain EMC - (GA) Reliability & Solar Offset Calculation

Backup_Energy = (139.1 min / 60) * 1.8 kW = 4.2 kWh/event | Solar_Offset = 10,800 kWh * $0.1481 = $1,599/yr

EIA-861 2025 Utility ID 1891: Rate=14.81 c/kWh, Cust=30,863, SAIDI=518.7 min.

**Result:** 8.65 outage hrs/yr; 14.8 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Blue Ridge Mountain EMC - (GA)?

Complete Form EIA-861 filing summary for Blue Ridge Mountain EMC - (GA) (ID 1891) covering sales, PV, and counties.

Form EIA-861 2025 filing metrics for Blue Ridge Mountain EMC - (GA) (Utility ID 1891).

| EIA Utility ID & BA Code | ID 1891 · TVA |
|---|---|
| State & Ownership Type | GA · Cooperative |
| Retail Electricity Rates | 14.81 c/kWh Res · 15.87 c Comm |
| Avg Monthly Usage & Bill | 954.4 kWh/mo ($141.39/mo est.) |
| SAIDI (All Events w/ MED) | 518.7 min/yr (8.65 hrs/yr) |
| SAIDI (Without Major Events) | 289.1 min/yr (Storm share: 44.3%) |
| SAIFI & CAIDI (Per-Outage Avg) | 3.729 /yr · 139.1 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 4 counties (Fannin, Gilmer, Towns, Union) |

## Which Peer Electric Utilities Operate in GA?

Compare Blue Ridge Mountain EMC - (GA) directly with Hart Electric Member Corp and nearby Georgia electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Hart Electric Member Corp**](https://epri-peac.com/utilities/ga-hart-electric-member-corp-8210/) | 13.11 c | 306.2 min | 134 | 30,698 |
| [**Albany Utility Board**](https://epri-peac.com/utilities/ga-albany-utility-board-230/) | 13.45 c | 199.1 min | 32 | 31,706 |
| [**Diverse Power Incorporated**](https://epri-peac.com/utilities/ga-diverse-power-incorporated-19219/) | 17.23 c | 503.9 min | 62 | 32,557 |
| [**Okefenoke Rural El Member Corp**](https://epri-peac.com/utilities/ga-okefenoke-rural-el-member-corp-31833/) | 14.28 c | 407.1 min | 155 | 28,463 |

What to Check & Best-Fit Scenarios

## What Should Blue Ridge Mountain EMC - (GA) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Blue Ridge Mountain EMC - (GA) (Cooperative, GA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: Blue Ridge Mountain EMC - (GA)'s 14.81 c/kWh blended residential rate in GA does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: Blue Ridge Mountain EMC - (GA) system-wide SAIDI averages rural and urban circuits across its GA territory or nearby Hart Electric Member Corp.

### Blue Ridge Mountain EMC - (GA) Solar & Battery Evaluators

Compare your actual Blue Ridge Mountain EMC - (GA) monthly kWh statement against 14.81 c/kWh and verify current export tariffs in GA.

### Blue Ridge Mountain EMC - (GA) Outage & Generator Planners

Use Blue Ridge Mountain EMC - (GA)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Blue Ridge Mountain EMC - (GA) (Georgia) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Blue Ridge Mountain EMC - (GA)'s residential electricity rate and 2026 solar payback?

Blue Ridge Mountain EMC - (GA) averages 14.81 c/kWh (+0.07 c/kWh vs Georgia average vs. Georgia). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,599/yr (14.8-year payback).

### How reliable is Blue Ridge Mountain EMC - (GA) compared to peer Georgia utilities?

Blue Ridge Mountain EMC - (GA) logged 518.7 SAIDI outage minutes (8.65 hrs/yr, 44.3% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with Hart Electric Member Corp (13.11 c/kWh) across Georgia.

### Which counties and customers does Blue Ridge Mountain EMC - (GA) serve in Georgia?

EIA-861 filings list 30,863 customers across 4 counties including Fannin, Gilmer, Towns, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Blue Ridge Mountain EMC - (GA).

## Related Pages

Explore Georgia energy benchmarks, Hart Electric Member Corp, county outage profiles, and NEC 705.12 tools alongside Blue Ridge Mountain EMC - (GA).

[Georgia State Energy Rates & Utilities](https://epri-peac.com/states/georgia/) [All Georgia County Power & Outage Profiles](https://epri-peac.com/counties/georgia/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 14.81 c/kWh rates.