---
title: "Lee County Electric Coop, Inc (FL) Rate & SAIDI"
url: https://epri-peac.com/utilities/fl-lee-county-electric-coop-inc-fl-10857/
description: "2025 EIA-861 profile for Lee County Electric Coop, Inc - (FL) (FL): 14.2 c/kWh rate, SAIDI Not reported in EIA-861, 10,389 solar systems."
---

EIA-861 Grid Reliability & Net Metering

# Lee County Electric Coop, Inc - (FL) (FL) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Lee County Electric Coop, Inc - (FL) (EIA ID 10857, FL) serves 236,578 customers at 14.2 c/kWh (-1.01 c/kWh vs Florida average) with no standalone IEEE SAIDI filing (6 counties served) with 10,389 net-metered residential solar systems (4.39% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 10857

- **Res. Rate** : 14.2 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 10,389 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Lee County Electric Coop, Inc - (FL) Compare on Tariffs and Reliability?

EIA-861 rate delta (-1.01 c/kWh vs Florida average), customer scale (236,578), and 2026 solar payback benchmarks for Lee County Electric Coop, Inc - (FL).

Serving 236,578 customers across 6 counties including Broward, Charlotte, Collier in Florida, Lee County Electric Coop, Inc - (FL) (Cooperative, Balancing Authority FPL) bills residential power at 14.2 c/kWh (-1.01 c/kWh vs Florida average vs. Florida), offsetting ~$1,534/yr on an 8 kW array. Grid filings show the utility did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 72.7 min/yr), with 10,389 net-metered residential solar systems (4.39% customer adoption).

## Where Does Lee County Electric Coop, Inc - (FL) Sit Across US Utility Rates?

Positions Lee County Electric Coop, Inc - (FL) (14.2 c/kWh) across 1,989 US electric utility residential tariffs. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

## How Does Lee County Electric Coop, Inc - (FL) Rank Across Cost & Reliability?

Percentile placement of Lee County Electric Coop, Inc - (FL) across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for Lee County Electric Coop, Inc - (FL)?

Four key EIA-861 rate, outage, and solar payback benchmarks for Lee County Electric Coop, Inc - (FL) (Cooperative) in Florida.

Lowest Rate #1,030 / 1,989

### 14.2 c/kWh (-1.01 vs FL)

Commercial avg: 12.18 c/kWh; est. residential bill $166.98/mo.

State Reliability Context

### 72.7 min/yr (FL Avg)

Utility did not file separate IEEE SAIDI in 2025; Florida customer-weighted SAIDI is 72.7 min/yr.

Post-25D Payback

### 15.4 Years @ 14.2 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,534/yr at 1,350 kWh/kW.

Distributed PV

### 10,389 Net-Metered Systems

93.502 MW residential PV (4.39% of customers) across 6 counties; state FEMA declarations (2015-2026): 54.

Lee County Electric Coop, Inc - (FL) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1420 = $1,534/yr

EIA-861 2025 Utility ID 10857: Rate=14.2 c/kWh, Cust=236,578, PV=10,389.

**Result:** 15.4 yr 8 kW cash payback at 14.2 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for Lee County Electric Coop, Inc - (FL)?

Complete Form EIA-861 filing summary for Lee County Electric Coop, Inc - (FL) (ID 10857) covering sales, PV, and counties.

Form EIA-861 2025 filing metrics for Lee County Electric Coop, Inc - (FL) (Utility ID 10857).

| EIA Utility ID & BA Code | ID 10857 · FPL |
|---|---|
| State & Ownership Type | FL · Cooperative |
| Retail Electricity Rates | 14.2 c/kWh Res · 12.18 c Comm |
| Avg Monthly Usage & Bill | 1,175.7 kWh/mo ($166.98/mo est.) |
| Residential Net-Metered PV | 10,389 systems (93.502 MW) |
| Counties Served (Sample) | 6 counties (Broward, Charlotte, Collier, Hendry, Lee, Monroe) |

## Which Peer Electric Utilities Operate in FL?

Compare Lee County Electric Coop, Inc - (FL) directly with Sumter Electric Coop, Inc and nearby Florida electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Sumter Electric Coop, Inc**](https://epri-peac.com/utilities/fl-sumter-electric-coop-inc-18304/) | 14.98 c | — | 6,842 | 240,241 |
| [**Withlacoochee River Elec Coop**](https://epri-peac.com/utilities/fl-withlacoochee-river-elec-coop-20885/) | 13.7 c | 105.5 min | 5,637 | 231,677 |
| [**Orlando Utilities Comm**](https://epri-peac.com/utilities/fl-orlando-utilities-comm-14610/) | 13.22 c | — | 11,443 | 254,552 |
| [**Clay Electric Cooperative, Inc - (FL)**](https://epri-peac.com/utilities/fl-clay-electric-cooperative-inc-fl-3757/) | 14.02 c | 204.9 min | 3,287 | 173,966 |

What to Check & Best-Fit Scenarios

## What Should Lee County Electric Coop, Inc - (FL) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Lee County Electric Coop, Inc - (FL) (Cooperative, FL) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside Lee County Electric Coop, Inc - (FL) (FL) shift real bills away from 14.2 c/kWh.
- Outage clustering: Major Event Days skew Lee County Electric Coop, Inc - (FL) annual minutes differently than routine non-storm reliability.

### Lee County Electric Coop, Inc - (FL) Solar & Battery Evaluators

Compare your actual Lee County Electric Coop, Inc - (FL) monthly kWh statement against 14.2 c/kWh and verify current export tariffs in FL.

### Lee County Electric Coop, Inc - (FL) Outage & Generator Planners

Use Lee County Electric Coop, Inc - (FL)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Lee County Electric Coop, Inc - (FL) (Florida) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Lee County Electric Coop, Inc - (FL)'s residential electricity rate and 2026 solar payback?

Lee County Electric Coop, Inc - (FL) averages 14.2 c/kWh (-1.01 c/kWh vs Florida average vs. Florida). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,534/yr (15.4-year payback).

### How reliable is Lee County Electric Coop, Inc - (FL) compared to peer Florida utilities?

Lee County Electric Coop, Inc - (FL) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 72.7 min/yr); compare rates and outage history directly with Sumter Electric Coop, Inc (14.98 c/kWh) across Florida.

### Which counties and customers does Lee County Electric Coop, Inc - (FL) serve in Florida?

EIA-861 filings list 236,578 customers across 6 counties including Broward, Charlotte, Collier, with 10,389 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Lee County Electric Coop, Inc - (FL).

## Related Pages

Explore Florida energy benchmarks, Sumter Electric Coop, Inc, county outage profiles, and NEC 705.12 tools alongside Lee County Electric Coop, Inc - (FL).

[Florida State Energy Rates & Utilities](https://epri-peac.com/states/florida/) [All Florida County Power & Outage Profiles](https://epri-peac.com/counties/florida/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 14.2 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
