title: "Groton Dept of Utilities (CT) Rate & SAIDI"
url: https://epri-peac.com/utilities/ct-groton-dept-of-utilities-ct-7716/
description: "2025 EIA-861 profile for Groton Dept of Utilities - (CT) (CT): 18.05 c/kWh rate, SAIDI 71.2 min/yr, 822 solar systems. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# Groton Dept of Utilities - (CT) (CT) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Groton Dept of Utilities - (CT) (EIA ID 7716, CT) serves 12,596 customers at 18.05 c/kWh (-11.26 c/kWh vs Connecticut average) with 71.2 min/yr SAIDI (1.19 hrs/yr) with 822 net-metered residential solar systems (6.53% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 7716

- **Res. Rate** : 18.05 c/kWh

- **SAIDI (All Events)** : 71.2 min/yr

- **Net-Metered PV** : 822 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Groton Dept of Utilities - (CT) Compare on Tariffs and Reliability?

How Groton Dept of Utilities - (CT) (Municipal) performs across 1 county on kWh rates and outage resilience. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

Across 1 county including New London, Groton Dept of Utilities - (CT) bills residential power at 18.05 c/kWh (-11.26 c/kWh vs Connecticut average vs. Connecticut), offsetting ~$1,949/yr on an 8 kW array compared to peer XOOM Energy Connecticut, LLC (13.09 c/kWh). With 12,596 customer accounts (Municipal), 2025 Form EIA-861 shows Groton Dept of Utilities - (CT) recorded 71.2 SAIDI outage minutes (1.19 hrs/yr, rank #166 of 751 reporting utilities), with 822 net-metered residential solar systems (6.53% customer adoption).

## Where Does Groton Dept of Utilities - (CT) Sit Across US Utility Rates?

National utility tariff curve marking Groton Dept of Utilities - (CT) at 18.05 c/kWh vs. 18.54 c/kWh US mean.

## How Does Groton Dept of Utilities - (CT) Rank Across Cost & Reliability?

Relative ranking of Groton Dept of Utilities - (CT) on residential electricity pricing and annual IEEE SAIDI outage duration.

## What Do EIA-861 Benchmarks Show for Groton Dept of Utilities - (CT)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Groton Dept of Utilities - (CT) in Connecticut.

Lowest Rate #1,648 / 1,989

### 18.05 c/kWh (-11.26 vs CT)

Commercial avg: 17.59 c/kWh; Industrial: 13.95 c/kWh; est. residential bill $133.62/mo.

Reliability #166 / 751

### 71.2 min/yr (1.19 hrs)

0.0% (0.0 min) from Major Event Days; avg restore 197.8 min (~5.9 kWh @ 1.8 kW).

Post-25D Payback

### 12.1 Years @ 18.05 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,949/yr at 1,350 kWh/kW.

Distributed PV

### 822 Net-Metered Systems

4.278 MW residential PV (6.53% of customers) across 1 county; state FEMA declarations (2015-2026): 13.

Groton Dept of Utilities - (CT) Reliability & Solar Offset Calculation

Backup_Energy = (197.8 min / 60) * 1.8 kW = 5.9 kWh/event | Solar_Offset = 10,800 kWh * $0.1805 = $1,949/yr

EIA-861 2025 Utility ID 7716: Rate=18.05 c/kWh, Cust=12,596, SAIDI=71.2 min, PV=822.

**Result:** 1.19 outage hrs/yr; 12.1 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Groton Dept of Utilities - (CT)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Groton Dept of Utilities - (CT). Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Form EIA-861 2025 filing metrics for Groton Dept of Utilities - (CT) (Utility ID 7716).

| EIA Utility ID & BA Code | ID 7716 · ISNE |
|---|---|
| State & Ownership Type | CT · Municipal |
| Retail Electricity Rates | 18.05 c/kWh Res · 17.59 c Comm · 13.95 c Ind |
| Avg Monthly Usage & Bill | 740.3 kWh/mo ($133.62/mo est.) |
| SAIDI (All Events w/ MED) | 71.2 min/yr (1.19 hrs/yr) |
| SAIDI (Without Major Events) | 71.2 min/yr (Storm share: 0.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.36 /yr · 197.8 min restore |
| Residential Net-Metered PV | 822 systems (4.278 MW) |
| Counties Served (Sample) | 1 county (New London) |

## Which Peer Electric Utilities Operate in CT?

Nearby Connecticut electric utilities of comparable customer size led by XOOM Energy Connecticut, LLC (13.09 c/kWh). Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**XOOM Energy Connecticut, LLC**](https://epri-peac.com/utilities/ct-xoom-energy-connecticut-llc-57487/) | 13.09 c | — | 0 | 8,430 |
| [**Tesla Inc.**](https://epri-peac.com/utilities/ct-tesla-inc-57313/) | 17.44 c | — | 0 | 8,394 |
| [**Major Energy Electric Services**](https://epri-peac.com/utilities/ct-major-energy-electric-services-56504/) | 11.67 c | — | 0 | 6,374 |
| [**City of Norwich - (CT)**](https://epri-peac.com/utilities/ct-city-of-norwich-ct-13831/) | 23.35 c | 168.8 min | 75 | 18,967 |

What to Check & Best-Fit Scenarios

## What Should Groton Dept of Utilities - (CT) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Groton Dept of Utilities - (CT) (Municipal, CT) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: Groton Dept of Utilities - (CT)'s 18.05 c/kWh blended residential rate in CT does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: Groton Dept of Utilities - (CT) system-wide SAIDI averages rural and urban circuits across its CT territory or nearby XOOM Energy Connecticut, LLC.

### Groton Dept of Utilities - (CT) Solar & Battery Evaluators

Compare your actual Groton Dept of Utilities - (CT) monthly kWh statement against 18.05 c/kWh and verify current export tariffs in CT.

### Groton Dept of Utilities - (CT) Outage & Generator Planners

Use Groton Dept of Utilities - (CT)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Groton Dept of Utilities - (CT) (Connecticut) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Groton Dept of Utilities - (CT)'s residential electricity rate and 2026 solar payback?

Groton Dept of Utilities - (CT) averages 18.05 c/kWh (-11.26 c/kWh vs Connecticut average vs. Connecticut). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,949/yr (12.1-year payback).

### How reliable is Groton Dept of Utilities - (CT) compared to peer Connecticut utilities?

Groton Dept of Utilities - (CT) recorded 71.2 SAIDI outage minutes (1.19 hrs/yr, rank #166 of 751 reporting utilities); compare rates and outage history directly with XOOM Energy Connecticut, LLC (13.09 c/kWh) across Connecticut.

### Which counties and customers does Groton Dept of Utilities - (CT) serve in Connecticut?

EIA-861 filings list 12,596 customers across 1 county including New London, with 822 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Groton Dept of Utilities - (CT).

## Related Pages

Explore Connecticut energy benchmarks, XOOM Energy Connecticut, LLC, county outage profiles, and NEC 705.12 tools alongside Groton Dept of Utilities - (CT).

[Connecticut State Energy Rates & Utilities](https://epri-peac.com/states/connecticut/) [All Connecticut County Power & Outage Profiles](https://epri-peac.com/counties/connecticut/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 18.05 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)