# Yampa Valley Electric Assn Inc (CO) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Yampa Valley Electric Assn Inc (EIA ID 21081, CO) serves 23,604 customers at 16.98 c/kWh (+1.29 c/kWh vs Colorado average) with 272.2 min/yr SAIDI (4.54 hrs/yr) with 339 net-metered residential solar systems (1.44% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 21081

- **Res. Rate** : 16.98 c/kWh

- **SAIDI (All Events)** : 272.2 min/yr

- **Net-Metered PV** : 339 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Yampa Valley Electric Assn Inc Compare on Tariffs and Reliability?

Solar payback, residential tariff (16.98 c/kWh), and outage history inside Yampa Valley Electric Assn Inc territory. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Evaluating solar or generator backup under Yampa Valley Electric Assn Inc (Colorado) starts with its 16.98 c/kWh residential baseline (+1.29 c/kWh vs Colorado average) and 12.9-year 8 kW cash payback. EIA-861 records show Yampa Valley Electric Assn Inc logged 272.2 SAIDI outage minutes (4.54 hrs/yr, 30.6% storm-driven), making battery backup or a standby ATS worthwhile across 23,604 accounts.

## Where Does Yampa Valley Electric Assn Inc Sit Across US Utility Rates?

Benchmarking Yampa Valley Electric Assn Inc's 16.98 c/kWh residential rate against 1,989 EIA-861 utilities. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

## How Does Yampa Valley Electric Assn Inc Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Yampa Valley Electric Assn Inc across Colorado utilities. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

## What Do EIA-861 Benchmarks Show for Yampa Valley Electric Assn Inc?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Yampa Valley Electric Assn Inc in 2025.

Lowest Rate #1,550 / 1,989

### 16.98 c/kWh (+1.29 vs CO)

Commercial avg: 13.22 c/kWh; Industrial: 8.43 c/kWh; est. residential bill $145.84/mo.

Reliability #506 / 751

### 272.2 min/yr (4.54 hrs)

30.6% (83.2 min) from Major Event Days; avg restore 135.8 min (~4.1 kWh @ 1.8 kW).

Post-25D Payback

### 12.9 Years @ 16.98 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,834/yr at 1,350 kWh/kW.

Distributed PV

### 339 Net-Metered Systems

2.975 MW residential PV (1.44% of customers) across 5 counties; state FEMA declarations (2015-2026): 28.

Yampa Valley Electric Assn Inc Reliability & Solar Offset Calculation

Backup_Energy = (135.8 min / 60) * 1.8 kW = 4.1 kWh/event | Solar_Offset = 10,800 kWh * $0.1698 = $1,834/yr

EIA-861 2025 Utility ID 21081: Rate=16.98 c/kWh, Cust=23,604, SAIDI=272.2 min, PV=339.

**Result:** 4.54 outage hrs/yr; 12.9 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Yampa Valley Electric Assn Inc?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 21081. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Form EIA-861 2025 filing metrics for Yampa Valley Electric Assn Inc (Utility ID 21081).

| EIA Utility ID & BA Code | ID 21081 · PSCO |
|---|---|
| State & Ownership Type | CO · Cooperative |
| Retail Electricity Rates | 16.98 c/kWh Res · 13.22 c Comm · 8.43 c Ind |
| Avg Monthly Usage & Bill | 858.6 kWh/mo ($145.84/mo est.) |
| SAIDI (All Events w/ MED) | 272.2 min/yr (4.54 hrs/yr) |
| SAIDI (Without Major Events) | 189.0 min/yr (Storm share: 30.6%) |
| SAIFI & CAIDI (Per-Outage Avg) | 2.005 /yr · 135.8 min restore |
| Residential Net-Metered PV | 339 systems (2.975 MW) |
| Counties Served (Sample) | 5 counties (Eagle, Grand, Moffat, Rio Blanco, Routt) |

## Which Peer Electric Utilities Operate in CO?

Benchmark Yampa Valley Electric Assn Inc directly against San Isabel Electric Assn, Inc and peer Colorado retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**San Isabel Electric Assn, Inc**](https://epri-peac.com/utilities/co-san-isabel-electric-assn-inc-16616/) | 18.86 c | — | 1,416 | 23,415 |
| [**Mountain Parks Electric, Inc**](https://epri-peac.com/utilities/co-mountain-parks-electric-inc-13050/) | 17.54 c | 181.3 min | 419 | 19,571 |
| [**Grand Valley Power**](https://epri-peac.com/utilities/co-grand-valley-power-7563/) | 16.2 c | 116.4 min | 1,415 | 17,657 |
| [**City of Fountain**](https://epri-peac.com/utilities/co-city-of-fountain-6638/) | 14.05 c | 42.1 min | 1,004 | 17,088 |

What to Check & Best-Fit Scenarios

## What Should Yampa Valley Electric Assn Inc Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Yampa Valley Electric Assn Inc (Cooperative, CO) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether Yampa Valley Electric Assn Inc acts as a wires-only TDU or bundled utility in CO.
- Transformer limits: Yampa Valley Electric Assn Inc interconnection engineering still checks neighborhood transformer kVA regardless of 272.2 SAIDI.

### Yampa Valley Electric Assn Inc Solar & Battery Evaluators

Compare your actual Yampa Valley Electric Assn Inc monthly kWh statement against 16.98 c/kWh and verify current export tariffs in CO.

### Yampa Valley Electric Assn Inc Outage & Generator Planners

Use Yampa Valley Electric Assn Inc's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Yampa Valley Electric Assn Inc (Colorado) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Yampa Valley Electric Assn Inc's residential electricity rate and 2026 solar payback?

Yampa Valley Electric Assn Inc averages 16.98 c/kWh (+1.29 c/kWh vs Colorado average vs. Colorado). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,834/yr (12.9-year payback).

### How reliable is Yampa Valley Electric Assn Inc compared to peer Colorado utilities?

Yampa Valley Electric Assn Inc logged 272.2 SAIDI outage minutes (4.54 hrs/yr, 30.6% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with San Isabel Electric Assn, Inc (18.86 c/kWh) across Colorado.

### Which counties and customers does Yampa Valley Electric Assn Inc serve in Colorado?

EIA-861 filings list 23,604 customers across 5 counties including Eagle, Grand, Moffat, with 339 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Yampa Valley Electric Assn Inc.

## Related Pages

Explore Colorado energy benchmarks, San Isabel Electric Assn, Inc, county outage profiles, and NEC 705.12 tools alongside Yampa Valley Electric Assn Inc.

[Colorado State Energy Rates & Utilities](https://epri-peac.com/states/colorado/) [All Colorado County Power & Outage Profiles](https://epri-peac.com/counties/colorado/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 16.98 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)