# City of Loveland - (CO) (CO) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Loveland - (CO) (EIA ID 11256, CO) serves 37,387 customers at 15.29 c/kWh (-0.40 c/kWh vs Colorado average) with 26.6 min/yr SAIDI (0.44 hrs/yr) with 559 net-metered residential solar systems (1.5% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 11256

- **Res. Rate** : 15.29 c/kWh

- **SAIDI (All Events)** : 26.6 min/yr

- **Net-Metered PV** : 559 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Loveland - (CO) Compare on Tariffs and Reliability?

How City of Loveland - (CO) (Municipal) performs across 1 county on kWh rates and outage resilience. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

City of Loveland - (CO) (Municipal) recorded 26.6 SAIDI outage minutes (0.44 hrs/yr, rank #57 of 751 reporting utilities). Typical residential meters drew 618.3 kWh/mo ($94.55/mo) in 2025, while its tariff bills residential power at 15.29 c/kWh (-0.40 c/kWh vs Colorado average vs. Colorado), offsetting ~$1,651/yr on an 8 kW array—compare rates directly with La Plata Electric Assn, Inc (18.33 c/kWh).

## Where Does City of Loveland - (CO) Sit Across US Utility Rates?

National utility tariff curve marking City of Loveland - (CO) at 15.29 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Loveland - (CO) Rank Across Cost & Reliability?

Relative ranking of City of Loveland - (CO) on residential electricity pricing and annual IEEE SAIDI outage duration. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

## What Do EIA-861 Benchmarks Show for City of Loveland - (CO)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Loveland - (CO) in Colorado.

Lowest Rate #1,271 / 1,989

### 15.29 c/kWh (-0.40 vs CO)

Commercial avg: 15.2 c/kWh; Industrial: 10.17 c/kWh; est. residential bill $94.55/mo.

Reliability #57 / 751

### 26.6 min/yr (0.44 hrs)

0.0% (0.0 min) from Major Event Days; avg restore 78.4 min (~2.4 kWh @ 1.8 kW).

Post-25D Payback

### 14.3 Years @ 15.29 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,651/yr at 1,350 kWh/kW.

Distributed PV

### 559 Net-Metered Systems

3.73 MW residential PV (1.5% of customers) across 1 county; state FEMA declarations (2015-2026): 28.

City of Loveland - (CO) Reliability & Solar Offset Calculation

Backup_Energy = (78.4 min / 60) * 1.8 kW = 2.4 kWh/event | Solar_Offset = 10,800 kWh * $0.1529 = $1,651/yr

EIA-861 2025 Utility ID 11256: Rate=15.29 c/kWh, Cust=37,387, SAIDI=26.6 min, PV=559.

**Result:** 0.44 outage hrs/yr; 14.3 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Loveland - (CO)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Loveland - (CO). Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

Form EIA-861 2025 filing metrics for City of Loveland - (CO) (Utility ID 11256).

| EIA Utility ID & BA Code | ID 11256 · PSCO |
|---|---|
| State & Ownership Type | CO · Municipal |
| Retail Electricity Rates | 15.29 c/kWh Res · 15.2 c Comm · 10.17 c Ind |
| Avg Monthly Usage & Bill | 618.3 kWh/mo ($94.55/mo est.) |
| SAIDI (All Events w/ MED) | 26.6 min/yr (0.44 hrs/yr) |
| SAIDI (Without Major Events) | 26.6 min/yr (Storm share: 0.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.34 /yr · 78.4 min restore |
| Residential Net-Metered PV | 559 systems (3.73 MW) |
| Counties Served (Sample) | 1 county (Larimer) |

## Which Peer Electric Utilities Operate in CO?

Nearby Colorado electric utilities of comparable customer size led by La Plata Electric Assn, Inc (18.33 c/kWh).

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**La Plata Electric Assn, Inc**](https://epri-peac.com/utilities/co-la-plata-electric-assn-inc-10539/) | 18.33 c | 217.7 min | 3,105 | 40,369 |
| [**City of Longmont**](https://epri-peac.com/utilities/co-city-of-longmont-11187/) | 13.12 c | 39.8 min | 1,070 | 41,483 |
| [**Delta Montrose Electric Assn**](https://epri-peac.com/utilities/co-delta-montrose-electric-assn-5086/) | 14.9 c | 115.5 min | 2,174 | 32,985 |
| [**Holy Cross Electric Assn, Inc**](https://epri-peac.com/utilities/co-holy-cross-electric-assn-inc-8773/) | 12.45 c | 71.1 min | 2,757 | 50,431 |

What to Check & Best-Fit Scenarios

## What Should City of Loveland - (CO) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Loveland - (CO) (Municipal, CO) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether City of Loveland - (CO) acts as a wires-only TDU or bundled utility in CO.
- Transformer limits: City of Loveland - (CO) interconnection engineering still checks neighborhood transformer kVA regardless of 26.6 SAIDI.

### City of Loveland - (CO) Solar & Battery Evaluators

Compare your actual City of Loveland - (CO) monthly kWh statement against 15.29 c/kWh and verify current export tariffs in CO.

### City of Loveland - (CO) Outage & Generator Planners

Use City of Loveland - (CO)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Loveland - (CO) (Colorado) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Loveland - (CO)'s residential electricity rate and 2026 solar payback?

City of Loveland - (CO) averages 15.29 c/kWh (-0.40 c/kWh vs Colorado average vs. Colorado). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,651/yr (14.3-year payback).

### How reliable is City of Loveland - (CO) compared to peer Colorado utilities?

City of Loveland - (CO) recorded 26.6 SAIDI outage minutes (0.44 hrs/yr, rank #57 of 751 reporting utilities); compare rates and outage history directly with La Plata Electric Assn, Inc (18.33 c/kWh) across Colorado.

### Which counties and customers does City of Loveland - (CO) serve in Colorado?

EIA-861 filings list 37,387 customers across 1 county including Larimer, with 559 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Loveland - (CO).

## Related Pages

Explore Colorado energy benchmarks, La Plata Electric Assn, Inc, county outage profiles, and NEC 705.12 tools alongside City of Loveland - (CO).

[Colorado State Energy Rates & Utilities](https://epri-peac.com/states/colorado/) [All Colorado County Power & Outage Profiles](https://epri-peac.com/counties/colorado/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 15.29 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)