EIA-861 Grid Reliability & Net Metering

# City of Longmont (CO) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Longmont (EIA ID 11187, CO) serves 41,483 customers at 13.12 c/kWh (-2.57 c/kWh vs Colorado average) with 39.8 min/yr SAIDI (0.66 hrs/yr) with 1,070 net-metered residential solar systems (2.58% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 11187

- **Res. Rate** : 13.12 c/kWh

- **SAIDI (All Events)** : 39.8 min/yr

- **Net-Metered PV** : 1,070 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Longmont Compare on Tariffs and Reliability?

Solar payback, residential tariff (13.12 c/kWh), and outage history inside City of Longmont territory. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Homeowners inside City of Longmont's Colorado footprint (2 counties including Boulder, Weld) face 13.12 c/kWh benchmark pricing (-5.42 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 16.7 years. Reliability data recorded 39.8 SAIDI outage minutes (0.66 hrs/yr, rank #84 of 751 reporting utilities).

## Where Does City of Longmont Sit Across US Utility Rates?

Benchmarking City of Longmont's 13.12 c/kWh residential rate against 1,989 EIA-861 utilities. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

## How Does City of Longmont Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of Longmont across Colorado utilities. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

## What Do EIA-861 Benchmarks Show for City of Longmont?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of Longmont in 2025. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Lowest Rate #695 / 1,989

### 13.12 c/kWh (-2.57 vs CO)

Commercial avg: 12.08 c/kWh; Industrial: 9.55 c/kWh; est. residential bill $88.39/mo.

Reliability #84 / 751

### 39.8 min/yr (0.66 hrs)

0.0% (0.0 min) from Major Event Days; avg restore 70.5 min (~2.1 kWh @ 1.8 kW).

Post-25D Payback

### 16.7 Years @ 13.12 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,417/yr at 1,350 kWh/kW.

Distributed PV

### 1,070 Net-Metered Systems

7.53 MW residential PV (2.58% of customers) across 2 counties; state FEMA declarations (2015-2026): 28.

City of Longmont Reliability & Solar Offset Calculation

Backup_Energy = (70.5 min / 60) * 1.8 kW = 2.1 kWh/event | Solar_Offset = 10,800 kWh * $0.1312 = $1,417/yr

EIA-861 2025 Utility ID 11187: Rate=13.12 c/kWh, Cust=41,483, SAIDI=39.8 min, PV=1,070.

**Result:** 0.66 outage hrs/yr; 16.7 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Longmont?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 11187. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Form EIA-861 2025 filing metrics for City of Longmont (Utility ID 11187).

| EIA Utility ID & BA Code | ID 11187 · PSCO |
|---|---|
| State & Ownership Type | CO · Municipal |
| Retail Electricity Rates | 13.12 c/kWh Res · 12.08 c Comm · 9.55 c Ind |
| Avg Monthly Usage & Bill | 673.7 kWh/mo ($88.39/mo est.) |
| SAIDI (All Events w/ MED) | 39.8 min/yr (0.66 hrs/yr) |
| SAIDI (Without Major Events) | 39.8 min/yr (Storm share: 0.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.564 /yr · 70.5 min restore |
| Residential Net-Metered PV | 1,070 systems (7.53 MW) |
| Counties Served (Sample) | 2 counties (Boulder, Weld) |

## Which Peer Electric Utilities Operate in CO?

Benchmark City of Longmont directly against La Plata Electric Assn, Inc and peer Colorado retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**La Plata Electric Assn, Inc**](https://epri-peac.com/utilities/co-la-plata-electric-assn-inc-10539/) | 18.33 c | 217.7 min | 3,105 | 40,369 |
| [**City of Loveland - (CO)**](https://epri-peac.com/utilities/co-city-of-loveland-co-11256/) | 15.29 c | 26.6 min | 559 | 37,387 |
| [**Delta Montrose Electric Assn**](https://epri-peac.com/utilities/co-delta-montrose-electric-assn-5086/) | 14.9 c | 115.5 min | 2,174 | 32,985 |
| [**Holy Cross Electric Assn, Inc**](https://epri-peac.com/utilities/co-holy-cross-electric-assn-inc-8773/) | 12.45 c | 71.1 min | 2,757 | 50,431 |

What to Check & Best-Fit Scenarios

## What Should City of Longmont Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Longmont (Municipal, CO) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: City of Longmont's 13.12 c/kWh blended residential rate in CO does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: City of Longmont system-wide SAIDI averages rural and urban circuits across its CO territory or nearby La Plata Electric Assn, Inc.

### City of Longmont Solar & Battery Evaluators

Compare your actual City of Longmont monthly kWh statement against 13.12 c/kWh and verify current export tariffs in CO.

### City of Longmont Outage & Generator Planners

Use City of Longmont's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Longmont (Colorado) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

### What is City of Longmont's residential electricity rate and 2026 solar payback?

City of Longmont averages 13.12 c/kWh (-2.57 c/kWh vs Colorado average vs. Colorado). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,417/yr (16.7-year payback).

### How reliable is City of Longmont compared to peer Colorado utilities?

City of Longmont recorded 39.8 SAIDI outage minutes (0.66 hrs/yr, rank #84 of 751 reporting utilities); compare rates and outage history directly with La Plata Electric Assn, Inc (18.33 c/kWh) across Colorado.

### Which counties and customers does City of Longmont serve in Colorado?

EIA-861 filings list 41,483 customers across 2 counties including Boulder, Weld, with 1,070 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Longmont.

## Related Pages

Explore Colorado energy benchmarks, La Plata Electric Assn, Inc, county outage profiles, and NEC 705.12 tools alongside City of Longmont.

[Colorado State Energy Rates & Utilities](https://epri-peac.com/states/colorado/) [All Colorado County Power & Outage Profiles](https://epri-peac.com/counties/colorado/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.12 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)