# Turlock Irrigation District (CA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Turlock Irrigation District (EIA ID 19281, CA) serves 80,976 customers at 17.4 c/kWh (-13.95 c/kWh vs California average) with 61.5 min/yr SAIDI (1.02 hrs/yr) with 5,415 net-metered residential solar systems (6.69% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 19281

- **Res. Rate** : 17.4 c/kWh

- **SAIDI (All Events)** : 61.5 min/yr

- **Net-Metered PV** : 5,415 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Turlock Irrigation District Compare on Tariffs and Reliability?

Solar payback, residential tariff (17.4 c/kWh), and outage history inside Turlock Irrigation District territory. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Evaluating solar or generator backup under Turlock Irrigation District (California) starts with its 17.4 c/kWh residential baseline (-13.95 c/kWh vs California average) and 12.6-year 8 kW cash payback. EIA-861 records show Turlock Irrigation District recorded 61.5 SAIDI outage minutes (1.02 hrs/yr, rank #139 of 751 reporting utilities) across 80,976 accounts.

## Where Does Turlock Irrigation District Sit Across US Utility Rates?

Benchmarking Turlock Irrigation District's 17.4 c/kWh residential rate against 1,989 EIA-861 utilities. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

## How Does Turlock Irrigation District Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Turlock Irrigation District across California utilities. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

## What Do EIA-861 Benchmarks Show for Turlock Irrigation District?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Turlock Irrigation District in 2025. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Lowest Rate #1,598 / 1,989

### 17.4 c/kWh (-13.95 vs CA)

Commercial avg: 14.35 c/kWh; Industrial: 13.23 c/kWh; est. residential bill $141.66/mo.

Reliability #139 / 751

### 61.5 min/yr (1.02 hrs)

0.0% (0.0 min) from Major Event Days; avg restore 93.2 min (~2.8 kWh @ 1.8 kW).

Post-25D Payback

### 12.6 Years @ 17.4 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,879/yr at 1,350 kWh/kW.

Distributed PV

### 5,415 Net-Metered Systems

31.449 MW residential PV (6.69% of customers) across 3 counties; state FEMA declarations (2015-2026): 161.

Turlock Irrigation District Reliability & Solar Offset Calculation

Backup_Energy = (93.2 min / 60) * 1.8 kW = 2.8 kWh/event | Solar_Offset = 10,800 kWh * $0.1740 = $1,879/yr

EIA-861 2025 Utility ID 19281: Rate=17.4 c/kWh, Cust=80,976, SAIDI=61.5 min, PV=5,415.

**Result:** 1.02 outage hrs/yr; 12.6 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Turlock Irrigation District?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 19281. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Form EIA-861 2025 filing metrics for Turlock Irrigation District (Utility ID 19281).

| EIA Utility ID & BA Code | ID 19281 · TIDC |
|---|---|
| State & Ownership Type | CA · Political Subdivision |
| Retail Electricity Rates | 17.4 c/kWh Res · 14.35 c Comm · 13.23 c Ind |
| Avg Monthly Usage & Bill | 814.0 kWh/mo ($141.66/mo est.) |
| SAIDI (All Events w/ MED) | 61.5 min/yr (1.02 hrs/yr) |
| SAIDI (Without Major Events) | 61.5 min/yr (Storm share: 0.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.66 /yr · 93.2 min restore |
| Residential Net-Metered PV | 5,415 systems (31.449 MW) |
| Counties Served (Sample) | 3 counties (Merced, Stanislaus, Tuolumne) |

## Which Peer Electric Utilities Operate in CA?

Benchmark Turlock Irrigation District directly against City of Glendale - (CA) and peer California retail electric power providers. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Glendale - (CA)**](https://epri-peac.com/utilities/ca-city-of-glendale-ca-7294/) | 35.51 c | — | 3,874 | 78,071 |
| [**City of Roseville - (CA)**](https://epri-peac.com/utilities/ca-city-of-roseville-ca-16295/) | 21.29 c | — | 13,362 | 64,556 |
| [**SunPower Capital, LLC**](https://epri-peac.com/utilities/ca-sunpower-capital-llc-59580/) | 25.7 c | — | 0 | 64,390 |
| [**City of Riverside - (CA)**](https://epri-peac.com/utilities/ca-city-of-riverside-ca-16088/) | 21.94 c | 88.3 min | 7,975 | 101,042 |

What to Check & Best-Fit Scenarios

## What Should Turlock Irrigation District Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Turlock Irrigation District (Political Subdivision, CA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether Turlock Irrigation District acts as a wires-only TDU or bundled utility in CA.
- Transformer limits: Turlock Irrigation District interconnection engineering still checks neighborhood transformer kVA regardless of 61.5 SAIDI.

### Turlock Irrigation District Solar & Battery Evaluators

Compare your actual Turlock Irrigation District monthly kWh statement against 17.4 c/kWh and verify current export tariffs in CA.

### Turlock Irrigation District Outage & Generator Planners

Use Turlock Irrigation District's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Turlock Irrigation District (California) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

### What is Turlock Irrigation District's residential electricity rate and 2026 solar payback?

Turlock Irrigation District averages 17.4 c/kWh (-13.95 c/kWh vs California average vs. California). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,879/yr (12.6-year payback).

### How reliable is Turlock Irrigation District compared to peer California utilities?

Turlock Irrigation District recorded 61.5 SAIDI outage minutes (1.02 hrs/yr, rank #139 of 751 reporting utilities); compare rates and outage history directly with City of Glendale - (CA) (35.51 c/kWh) across California.

### Which counties and customers does Turlock Irrigation District serve in California?

EIA-861 filings list 80,976 customers across 3 counties including Merced, Stanislaus, Tuolumne, with 5,415 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Turlock Irrigation District.

## Related Pages

Explore California energy benchmarks, City of Glendale - (CA), county outage profiles, and NEC 705.12 tools alongside Turlock Irrigation District.

[California State Energy Rates & Utilities](https://epri-peac.com/states/california/) [All California County Power & Outage Profiles](https://epri-peac.com/counties/california/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 17.4 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)