EIA-861 Grid Reliability & Net Metering

# Sacramento Municipal Util Dist (CA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Sacramento Municipal Util Dist (EIA ID 16534, CA) serves 601,275 customers at 18.93 c/kWh (-12.42 c/kWh vs California average) with no standalone IEEE SAIDI filing (3 counties served) with 62,657 net-metered residential solar systems (10.42% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 16534

- **Res. Rate** : 18.93 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 62,657 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Sacramento Municipal Util Dist Compare on Tariffs and Reliability?

Solar payback, residential tariff (18.93 c/kWh), and outage history inside Sacramento Municipal Util Dist territory. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Evaluating solar or generator backup under Sacramento Municipal Util Dist (California) starts with its 18.93 c/kWh residential baseline (-12.42 c/kWh vs California average) and 11.5-year 8 kW cash payback. EIA-861 records show Sacramento Municipal Util Dist did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 358.3 min/yr) across 601,275 accounts.

## Where Does Sacramento Municipal Util Dist Sit Across US Utility Rates?

Benchmarking Sacramento Municipal Util Dist's 18.93 c/kWh residential rate against 1,989 EIA-861 utilities. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

## How Does Sacramento Municipal Util Dist Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Sacramento Municipal Util Dist across California utilities. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

## What Do EIA-861 Benchmarks Show for Sacramento Municipal Util Dist?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Sacramento Municipal Util Dist in 2025.

Lowest Rate #1,710 / 1,989

### 18.93 c/kWh (-12.42 vs CA)

Commercial avg: 17.57 c/kWh; Industrial: 13.66 c/kWh; est. residential bill $125.42/mo.

State Reliability Context

### 358.3 min/yr (CA Avg)

Utility did not file separate IEEE SAIDI in 2025; California customer-weighted SAIDI is 358.3 min/yr.

Post-25D Payback

### 11.5 Years @ 18.93 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$2,044/yr at 1,350 kWh/kW.

Distributed PV

### 62,657 Net-Metered Systems

282.809 MW residential PV (10.42% of customers) across 3 counties; state FEMA declarations (2015-2026): 161.

Sacramento Municipal Util Dist Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1893 = $2,044/yr

EIA-861 2025 Utility ID 16534: Rate=18.93 c/kWh, Cust=601,275, PV=62,657.

**Result:** 11.5 yr 8 kW cash payback at 18.93 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for Sacramento Municipal Util Dist?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 16534. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Form EIA-861 2025 filing metrics for Sacramento Municipal Util Dist (Utility ID 16534).

| EIA Utility ID & BA Code | ID 16534 · BANC |
|---|---|
| State & Ownership Type | CA · Political Subdivision |
| Retail Electricity Rates | 18.93 c/kWh Res · 17.57 c Comm · 13.66 c Ind |
| Avg Monthly Usage & Bill | 662.7 kWh/mo ($125.42/mo est.) |
| Residential Net-Metered PV | 62,657 systems (282.809 MW) |
| Counties Served (Sample) | 3 counties (Placer, Sacramento, Yolo) |

## Which Peer Electric Utilities Operate in CA?

Benchmark Sacramento Municipal Util Dist directly against Ava Community Energy and peer California retail electric power providers. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Ava Community Energy**](https://epri-peac.com/utilities/ca-ava-community-energy-61475/) | 14.48 c | — | 0 | 657,327 |
| [**Marin Clean Energy**](https://epri-peac.com/utilities/ca-marin-clean-energy-56692/) | 15.0 c | — | 0 | 533,896 |
| [**Clean Power Alliance of Southern Califor**](https://epri-peac.com/utilities/ca-clean-power-alliance-of-southern-califor-61526/) | 13.95 c | — | 0 | 752,163 |
| [**Central Coast Community Energy**](https://epri-peac.com/utilities/ca-central-coast-community-energy-61432/) | 14.75 c | — | 0 | 429,482 |

What to Check & Best-Fit Scenarios

## What Should Sacramento Municipal Util Dist Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Sacramento Municipal Util Dist (Political Subdivision, CA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: Sacramento Municipal Util Dist (Political Subdivision) reports historical 2025 EIA-861 averages rather than live rate-case riders in CA.
- Export credit rules: check Sacramento Municipal Util Dist's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### Sacramento Municipal Util Dist Solar & Battery Evaluators

Compare your actual Sacramento Municipal Util Dist monthly kWh statement against 18.93 c/kWh and verify current export tariffs in CA.

### Sacramento Municipal Util Dist Outage & Generator Planners

Use Sacramento Municipal Util Dist's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Sacramento Municipal Util Dist (California) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Sacramento Municipal Util Dist's residential electricity rate and 2026 solar payback?

Sacramento Municipal Util Dist averages 18.93 c/kWh (-12.42 c/kWh vs California average vs. California). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$2,044/yr (11.5-year payback).

### How reliable is Sacramento Municipal Util Dist compared to peer California utilities?

Sacramento Municipal Util Dist did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 358.3 min/yr); compare rates and outage history directly with Ava Community Energy (14.48 c/kWh) across California.

### Which counties and customers does Sacramento Municipal Util Dist serve in California?

EIA-861 filings list 601,275 customers across 3 counties including Placer, Sacramento, Yolo, with 62,657 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Sacramento Municipal Util Dist.

## Related Pages

Explore California energy benchmarks, Ava Community Energy, county outage profiles, and NEC 705.12 tools alongside Sacramento Municipal Util Dist.

[California State Energy Rates & Utilities](https://epri-peac.com/states/california/) [All California County Power & Outage Profiles](https://epri-peac.com/counties/california/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 18.93 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)