title: "Rancho Mirage Energy Authority (CA) Rate & SAIDI"
url: https://epri-peac.com/utilities/ca-rancho-mirage-energy-authority-61471/
description: "2025 EIA-861 profile for Rancho Mirage Energy Authority (CA): 13.58 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# Rancho Mirage Energy Authority (CA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Rancho Mirage Energy Authority (EIA ID 61471, CA) serves 12,995 customers at 13.58 c/kWh (-17.77 c/kWh vs California average) with no standalone IEEE SAIDI filing (0 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 61471

- **Res. Rate** : 13.58 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Rancho Mirage Energy Authority Compare on Tariffs and Reliability?

How Rancho Mirage Energy Authority (Community Choice Aggregator) performs across 0 counties on kWh rates and outage resilience.

Rancho Mirage Energy Authority (Community Choice Aggregator) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 358.3 min/yr). Typical residential meters drew 697.6 kWh/mo ($94.72/mo) in 2025, while its tariff bills residential power at 13.58 c/kWh (-17.77 c/kWh vs California average vs. California), offsetting ~$1,467/yr on an 8 kW array—compare rates directly with San Jacinto Power (16.97 c/kWh).

## Where Does Rancho Mirage Energy Authority Sit Across US Utility Rates?

National utility tariff curve marking Rancho Mirage Energy Authority at 13.58 c/kWh vs. 18.54 c/kWh US mean.

## How Does Rancho Mirage Energy Authority Rank Across Cost & Reliability?

Relative ranking of Rancho Mirage Energy Authority on residential electricity pricing and annual IEEE SAIDI outage duration. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

## What Do EIA-861 Benchmarks Show for Rancho Mirage Energy Authority?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Rancho Mirage Energy Authority in California.

Lowest Rate #840 / 1,989

### 13.58 c/kWh (-17.77 vs CA)

Commercial avg: 10.66 c/kWh; Industrial: 8.91 c/kWh; est. residential bill $94.72/mo.

State Reliability Context

### 358.3 min/yr (CA Avg)

Utility did not file separate IEEE SAIDI in 2025; California customer-weighted SAIDI is 358.3 min/yr.

Post-25D Payback

### 16.1 Years @ 13.58 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,467/yr at 1,350 kWh/kW.

Service Territory

### 12,995 Customers · 0 Counties

Serves 0 counties in California; state FEMA declarations (2015-2026): 161.

Rancho Mirage Energy Authority Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1358 = $1,467/yr

EIA-861 2025 Utility ID 61471: Rate=13.58 c/kWh, Cust=12,995.

**Result:** 16.1 yr 8 kW cash payback at 13.58 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for Rancho Mirage Energy Authority?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Rancho Mirage Energy Authority. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

Form EIA-861 2025 filing metrics for Rancho Mirage Energy Authority (Utility ID 61471).

| EIA Utility ID & BA Code | ID 61471 · CISO |
|---|---|
| State & Ownership Type | CA · Community Choice Aggregator |
| Retail Electricity Rates | 13.58 c/kWh Res · 10.66 c Comm · 8.91 c Ind |
| Avg Monthly Usage & Bill | 697.6 kWh/mo ($94.72/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |

## Which Peer Electric Utilities Operate in CA?

Nearby California electric utilities of comparable customer size led by San Jacinto Power (16.97 c/kWh). Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**San Jacinto Power**](https://epri-peac.com/utilities/ca-san-jacinto-power-61433/) | 16.97 c | — | 0 | 13,631 |
| [**Merced Irrigation District**](https://epri-peac.com/utilities/ca-merced-irrigation-district-12312/) | 24.15 c | — | 3,623 | 11,850 |
| [**Pico Rivera Innovative Municipal Energy**](https://epri-peac.com/utilities/ca-pico-rivera-innovative-municipal-energy-61083/) | 15.99 c | — | 0 | 14,772 |
| [**City of Azusa**](https://epri-peac.com/utilities/ca-city-of-azusa-1050/) | 20.77 c | — | 464 | 15,646 |

What to Check & Best-Fit Scenarios

## What Should Rancho Mirage Energy Authority Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Rancho Mirage Energy Authority (Community Choice Aggregator, CA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether Rancho Mirage Energy Authority acts as a wires-only TDU or bundled utility in CA.
- Transformer limits: Rancho Mirage Energy Authority interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.

### Rancho Mirage Energy Authority Solar & Battery Evaluators

Compare your actual Rancho Mirage Energy Authority monthly kWh statement against 13.58 c/kWh and verify current export tariffs in CA.

### Rancho Mirage Energy Authority Outage & Generator Planners

Use Rancho Mirage Energy Authority's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Rancho Mirage Energy Authority (California) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Rancho Mirage Energy Authority's residential electricity rate and 2026 solar payback?

Rancho Mirage Energy Authority averages 13.58 c/kWh (-17.77 c/kWh vs California average vs. California). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,467/yr (16.1-year payback).

### How reliable is Rancho Mirage Energy Authority compared to peer California utilities?

Rancho Mirage Energy Authority did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 358.3 min/yr); compare rates and outage history directly with San Jacinto Power (16.97 c/kWh) across California.

### Which counties and customers does Rancho Mirage Energy Authority serve in California?

EIA-861 filings list 12,995 customers across 0 counties, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Rancho Mirage Energy Authority.

## Related Pages

Explore California energy benchmarks, San Jacinto Power, county outage profiles, and NEC 705.12 tools alongside Rancho Mirage Energy Authority.

[California State Energy Rates & Utilities](https://epri-peac.com/states/california/) [All California County Power & Outage Profiles](https://epri-peac.com/counties/california/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.58 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)