---
title: "Modesto Irrigation District (CA) Rate & SAIDI"
url: https://epri-peac.com/utilities/ca-modesto-irrigation-district-12745/
description: "2025 EIA-861 profile for Modesto Irrigation District (CA): 23.03 c/kWh rate, SAIDI 36.3 min/yr, 11,986 solar systems. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# Modesto Irrigation District (CA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Modesto Irrigation District (EIA ID 12745, CA) serves 104,671 customers at 23.03 c/kWh (-8.32 c/kWh vs California average) with 36.3 min/yr SAIDI (0.6 hrs/yr) with 11,986 net-metered residential solar systems (11.45% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 12745

- **Res. Rate** : 23.03 c/kWh

- **SAIDI (All Events)** : 36.3 min/yr

- **Net-Metered PV** : 11,986 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Modesto Irrigation District Compare on Tariffs and Reliability?

EIA-861 rate delta (-8.32 c/kWh vs California average), customer scale (104,671), and 2026 solar payback benchmarks for Modesto Irrigation District.

Serving 104,671 customers across 2 counties including San Joaquin, Stanislaus in California, Modesto Irrigation District (Political Subdivision, Balancing Authority BANC) carries a high 23.03 c/kWh residential tariff (-8.32 c/kWh vs California average), yielding strong ~$2,487/yr solar savings (9.5-yr cash payback). Grid filings show the utility recorded 36.3 SAIDI outage minutes (0.6 hrs/yr, rank #74 of 751 reporting utilities), with 11,986 net-metered residential solar systems (11.45% customer adoption).

## Where Does Modesto Irrigation District Sit Across US Utility Rates?

Positions Modesto Irrigation District (23.03 c/kWh) across 1,989 US electric utility residential tariffs. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

## How Does Modesto Irrigation District Rank Across Cost & Reliability?

Percentile placement of Modesto Irrigation District across retail kWh electricity cost and IEEE grid reliability outage metrics. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

## What Do EIA-861 Benchmarks Show for Modesto Irrigation District?

Four key EIA-861 rate, outage, and solar payback benchmarks for Modesto Irrigation District (Political Subdivision) in California. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Lowest Rate #1,869 / 1,989

### 23.03 c/kWh (-8.32 vs CA)

Commercial avg: 18.23 c/kWh; Industrial: 13.16 c/kWh; est. residential bill $173.07/mo.

Reliability #74 / 751

### 36.3 min/yr (0.6 hrs)

13.8% (5.0 min) from Major Event Days; avg restore 84.8 min (~2.5 kWh @ 1.8 kW).

Post-25D Payback

### 9.5 Years @ 23.03 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$2,487/yr at 1,350 kWh/kW.

Distributed PV

### 11,986 Net-Metered Systems

60.878 MW residential PV (11.45% of customers) across 2 counties; state FEMA declarations (2015-2026): 161.

Modesto Irrigation District Reliability & Solar Offset Calculation

Backup_Energy = (84.8 min / 60) * 1.8 kW = 2.5 kWh/event | Solar_Offset = 10,800 kWh * $0.2303 = $2,487/yr

EIA-861 2025 Utility ID 12745: Rate=23.03 c/kWh, Cust=104,671, SAIDI=36.3 min, PV=11,986.

**Result:** 0.6 outage hrs/yr; 9.5 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Modesto Irrigation District?

Complete Form EIA-861 filing summary for Modesto Irrigation District (ID 12745) covering sales, PV, and counties. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Form EIA-861 2025 filing metrics for Modesto Irrigation District (Utility ID 12745).

| EIA Utility ID & BA Code | ID 12745 · BANC |
|---|---|
| State & Ownership Type | CA · Political Subdivision |
| Retail Electricity Rates | 23.03 c/kWh Res · 18.23 c Comm · 13.16 c Ind |
| Avg Monthly Usage & Bill | 751.4 kWh/mo ($173.07/mo est.) |
| SAIDI (All Events w/ MED) | 36.3 min/yr (0.6 hrs/yr) |
| SAIDI (Without Major Events) | 31.3 min/yr (Storm share: 13.8%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.428 /yr · 84.8 min restore |
| Residential Net-Metered PV | 11,986 systems (60.878 MW) |
| Counties Served (Sample) | 2 counties (San Joaquin, Stanislaus) |

## Which Peer Electric Utilities Operate in CA?

Compare Modesto Irrigation District directly with City of Anaheim - (CA) and nearby California electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Anaheim - (CA)**](https://epri-peac.com/utilities/ca-city-of-anaheim-ca-590/) | 19.37 c | 31.9 min | 5,351 | 107,148 |
| [**City of Riverside - (CA)**](https://epri-peac.com/utilities/ca-city-of-riverside-ca-16088/) | 21.94 c | 88.3 min | 7,975 | 101,042 |
| [**Tesla Inc.**](https://epri-peac.com/utilities/ca-tesla-inc-57313/) | 18.91 c | — | 0 | 125,519 |
| [**Turlock Irrigation District**](https://epri-peac.com/utilities/ca-turlock-irrigation-district-19281/) | 17.4 c | 61.5 min | 5,415 | 80,976 |

What to Check & Best-Fit Scenarios

## What Should Modesto Irrigation District Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Modesto Irrigation District (Political Subdivision, CA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: Modesto Irrigation District's 23.03 c/kWh blended residential rate in CA does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: Modesto Irrigation District system-wide SAIDI averages rural and urban circuits across its CA territory or nearby City of Anaheim - (CA).

### Modesto Irrigation District Solar & Battery Evaluators

Compare your actual Modesto Irrigation District monthly kWh statement against 23.03 c/kWh and verify current export tariffs in CA.

### Modesto Irrigation District Outage & Generator Planners

Use Modesto Irrigation District's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Modesto Irrigation District (California) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

### What is Modesto Irrigation District's residential electricity rate and 2026 solar payback?

Modesto Irrigation District averages 23.03 c/kWh (-8.32 c/kWh vs California average vs. California). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$2,487/yr (9.5-year payback).

### How reliable is Modesto Irrigation District compared to peer California utilities?

Modesto Irrigation District recorded 36.3 SAIDI outage minutes (0.6 hrs/yr, rank #74 of 751 reporting utilities); compare rates and outage history directly with City of Anaheim - (CA) (19.37 c/kWh) across California.

### Which counties and customers does Modesto Irrigation District serve in California?

EIA-861 filings list 104,671 customers across 2 counties including San Joaquin, Stanislaus, with 11,986 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Modesto Irrigation District.

## Related Pages

Explore California energy benchmarks, City of Anaheim - (CA), county outage profiles, and NEC 705.12 tools alongside Modesto Irrigation District.

[California State Energy Rates & Utilities](https://epri-peac.com/states/california/) [All California County Power & Outage Profiles](https://epri-peac.com/counties/california/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 23.03 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
