description: "2025 EIA-861 profile for Lancaster Choice Energy (CA): 16.38 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# Lancaster Choice Energy (CA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Lancaster Choice Energy (EIA ID 59625, CA) serves 47,159 customers at 16.38 c/kWh (-14.97 c/kWh vs California average) with no standalone IEEE SAIDI filing (0 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 59625

- **Res. Rate** : 16.38 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Lancaster Choice Energy Compare on Tariffs and Reliability?

How Lancaster Choice Energy (Community Choice Aggregator) performs across 0 counties on kWh rates and outage resilience. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

Lancaster Choice Energy (Community Choice Aggregator) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 358.3 min/yr). Typical residential meters drew 499.7 kWh/mo ($81.85/mo) in 2025, while its tariff bills residential power at 16.38 c/kWh (-14.97 c/kWh vs California average vs. California), offsetting ~$1,769/yr on an 8 kW array—compare rates directly with City of Burbank Water and Power - (CA) (21.5 c/kWh).

## Where Does Lancaster Choice Energy Sit Across US Utility Rates?

National utility tariff curve marking Lancaster Choice Energy at 16.38 c/kWh vs. 18.54 c/kWh US mean.

## How Does Lancaster Choice Energy Rank Across Cost & Reliability?

Relative ranking of Lancaster Choice Energy on residential electricity pricing and annual IEEE SAIDI outage duration. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

## What Do EIA-861 Benchmarks Show for Lancaster Choice Energy?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Lancaster Choice Energy in California. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

Lowest Rate #1,471 / 1,989

### 16.38 c/kWh (-14.97 vs CA)

Commercial avg: 13.28 c/kWh; Industrial: 11.58 c/kWh; est. residential bill $81.85/mo.

State Reliability Context

### 358.3 min/yr (CA Avg)

Utility did not file separate IEEE SAIDI in 2025; California customer-weighted SAIDI is 358.3 min/yr.

Post-25D Payback

### 13.3 Years @ 16.38 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,769/yr at 1,350 kWh/kW.

Service Territory

### 47,159 Customers · 0 Counties

Serves 0 counties in California; state FEMA declarations (2015-2026): 161.

Lancaster Choice Energy Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1638 = $1,769/yr

EIA-861 2025 Utility ID 59625: Rate=16.38 c/kWh, Cust=47,159.

**Result:** 13.3 yr 8 kW cash payback at 16.38 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for Lancaster Choice Energy?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Lancaster Choice Energy. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

Form EIA-861 2025 filing metrics for Lancaster Choice Energy (Utility ID 59625).

| EIA Utility ID & BA Code | ID 59625 · CISO |
|---|---|
| State & Ownership Type | CA · Community Choice Aggregator |
| Retail Electricity Rates | 16.38 c/kWh Res · 13.28 c Comm · 11.58 c Ind |
| Avg Monthly Usage & Bill | 499.7 kWh/mo ($81.85/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |

## Which Peer Electric Utilities Operate in CA?

Nearby California electric utilities of comparable customer size led by City of Burbank Water and Power - (CA) (21.5 c/kWh).

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Burbank Water and Power - (CA)**](https://epri-peac.com/utilities/ca-city-of-burbank-water-and-power-ca-2507/) | 21.5 c | 174.4 min | 1,899 | 46,719 |
| [**Liberty Utilities**](https://epri-peac.com/utilities/ca-liberty-utilities-57483/) | 27.65 c | 614.3 min | 744 | 44,507 |
| [**Redwood Coast Energy Authority**](https://epri-peac.com/utilities/ca-redwood-coast-energy-authority-60868/) | 13.83 c | — | 0 | 51,383 |
| [**Energy for Palmdale's Independent Choice**](https://epri-peac.com/utilities/ca-energy-for-palmdale-s-independent-choice-65259/) | 16.85 c | — | 0 | 40,579 |

What to Check & Best-Fit Scenarios

## What Should Lancaster Choice Energy Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Lancaster Choice Energy (Community Choice Aggregator, CA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: Lancaster Choice Energy (Community Choice Aggregator) reports historical 2025 EIA-861 averages rather than live rate-case riders in CA.
- Export credit rules: check Lancaster Choice Energy's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### Lancaster Choice Energy Solar & Battery Evaluators

Compare your actual Lancaster Choice Energy monthly kWh statement against 16.38 c/kWh and verify current export tariffs in CA.

### Lancaster Choice Energy Outage & Generator Planners

Use Lancaster Choice Energy's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Lancaster Choice Energy (California) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

### What is Lancaster Choice Energy's residential electricity rate and 2026 solar payback?

Lancaster Choice Energy averages 16.38 c/kWh (-14.97 c/kWh vs California average vs. California). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,769/yr (13.3-year payback).

### How reliable is Lancaster Choice Energy compared to peer California utilities?

Lancaster Choice Energy did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 358.3 min/yr); compare rates and outage history directly with City of Burbank Water and Power - (CA) (21.5 c/kWh) across California.

### Which counties and customers does Lancaster Choice Energy serve in California?

EIA-861 filings list 47,159 customers across 0 counties, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Lancaster Choice Energy.

## Related Pages

Explore California energy benchmarks, City of Burbank Water and Power - (CA), county outage profiles, and NEC 705.12 tools alongside Lancaster Choice Energy.

[California State Energy Rates & Utilities](https://epri-peac.com/states/california/) [All California County Power & Outage Profiles](https://epri-peac.com/counties/california/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 16.38 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)