Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Moreno Valley - (CA) (EIA ID 55787, CA) serves 7,952 customers at 40.6 c/kWh (+9.25 c/kWh vs California average) with 85.3 min/yr SAIDI (1.42 hrs/yr) with 3,204 net-metered residential solar systems (40.29% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 55787

- **Res. Rate** : 40.6 c/kWh

- **SAIDI (All Events)** : 85.3 min/yr

- **Net-Metered PV** : 3,204 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Moreno Valley - (CA) Compare on Tariffs and Reliability?

Solar payback, residential tariff (40.6 c/kWh), and outage history inside City of Moreno Valley - (CA) territory. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

Evaluating solar or generator backup under City of Moreno Valley - (CA) (California) starts with its 40.6 c/kWh residential baseline (+9.25 c/kWh vs California average) and 5.4-year 8 kW cash payback. EIA-861 records show City of Moreno Valley - (CA) recorded 85.3 SAIDI outage minutes (1.42 hrs/yr, rank #191 of 751 reporting utilities) across 7,952 accounts.

## Where Does City of Moreno Valley - (CA) Sit Across US Utility Rates?

Benchmarking City of Moreno Valley - (CA)'s 40.6 c/kWh residential rate against 1,989 EIA-861 utilities. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

## How Does City of Moreno Valley - (CA) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of Moreno Valley - (CA) across California utilities. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

## What Do EIA-861 Benchmarks Show for City of Moreno Valley - (CA)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of Moreno Valley - (CA) in 2025.

Lowest Rate #1,979 / 1,989

### 40.6 c/kWh (+9.25 vs CA)

Commercial avg: 22.83 c/kWh; Industrial: 47.99 c/kWh; est. residential bill $187.89/mo.

Reliability #191 / 751

### 85.3 min/yr (1.42 hrs)

0.0% (0.0 min) from Major Event Days; avg restore 113.8 min (~3.4 kWh @ 1.8 kW).

Post-25D Payback

### 5.4 Years @ 40.6 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$4,385/yr at 1,350 kWh/kW.

Distributed PV

### 3,204 Net-Metered Systems

15.341 MW residential PV (40.29% of customers) across 1 county; state FEMA declarations (2015-2026): 161.

City of Moreno Valley - (CA) Reliability & Solar Offset Calculation

Backup_Energy = (113.8 min / 60) * 1.8 kW = 3.4 kWh/event | Solar_Offset = 10,800 kWh * $0.4060 = $4,385/yr

EIA-861 2025 Utility ID 55787: Rate=40.6 c/kWh, Cust=7,952, SAIDI=85.3 min, PV=3,204.

**Result:** 1.42 outage hrs/yr; 5.4 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Moreno Valley - (CA)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 55787. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Form EIA-861 2025 filing metrics for City of Moreno Valley - (CA) (Utility ID 55787).

| EIA Utility ID & BA Code | ID 55787 · CISO |
|---|---|
| State & Ownership Type | CA · Municipal |
| Retail Electricity Rates | 40.6 c/kWh Res · 22.83 c Comm · 47.99 c Ind |
| Avg Monthly Usage & Bill | 462.8 kWh/mo ($187.89/mo est.) |
| SAIDI (All Events w/ MED) | 85.3 min/yr (1.42 hrs/yr) |
| SAIDI (Without Major Events) | 85.3 min/yr (Storm share: 0.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.749 /yr · 113.8 min restore |
| Residential Net-Metered PV | 3,204 systems (15.341 MW) |
| Counties Served (Sample) | 1 county (Riverside) |

## Which Peer Electric Utilities Operate in CA?

Benchmark City of Moreno Valley - (CA) directly against Palmetto Solar, LLC and peer California retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Palmetto Solar, LLC**](https://epri-peac.com/utilities/ca-palmetto-solar-llc-66026/) | 19.2 c | — | 0 | 7,842 |
| [**City of Shasta Lake - (CA)**](https://epri-peac.com/utilities/ca-city-of-shasta-lake-ca-17896/) | 22.91 c | 79.5 min | 146 | 4,278 |
| [**Merced Irrigation District**](https://epri-peac.com/utilities/ca-merced-irrigation-district-12312/) | 24.15 c | — | 3,623 | 11,850 |
| [**Pilot Power Group, LLC**](https://epri-peac.com/utilities/ca-pilot-power-group-llc-14999/) | 16.67 c | — | 0 | 3,678 |

What to Check & Best-Fit Scenarios

## What Should City of Moreno Valley - (CA) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Moreno Valley - (CA) (Municipal, CA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: City of Moreno Valley - (CA) (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in CA.
- Export credit rules: check City of Moreno Valley - (CA)'s active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### City of Moreno Valley - (CA) Solar & Battery Evaluators

Compare your actual City of Moreno Valley - (CA) monthly kWh statement against 40.6 c/kWh and verify current export tariffs in CA.

### City of Moreno Valley - (CA) Outage & Generator Planners

Use City of Moreno Valley - (CA)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Moreno Valley - (CA) (California) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Moreno Valley - (CA)'s residential electricity rate and 2026 solar payback?

City of Moreno Valley - (CA) averages 40.6 c/kWh (+9.25 c/kWh vs California average vs. California). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$4,385/yr (5.4-year payback).

### How reliable is City of Moreno Valley - (CA) compared to peer California utilities?

City of Moreno Valley - (CA) recorded 85.3 SAIDI outage minutes (1.42 hrs/yr, rank #191 of 751 reporting utilities); compare rates and outage history directly with Palmetto Solar, LLC (19.2 c/kWh) across California.

### Which counties and customers does City of Moreno Valley - (CA) serve in California?

EIA-861 filings list 7,952 customers across 1 county including Riverside, with 3,204 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Moreno Valley - (CA).

## Related Pages

Explore California energy benchmarks, Palmetto Solar, LLC, county outage profiles, and NEC 705.12 tools alongside City of Moreno Valley - (CA).

[California State Energy Rates & Utilities](https://epri-peac.com/states/california/) [All California County Power & Outage Profiles](https://epri-peac.com/counties/california/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 40.6 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)