---
title: "City of Corona - (CA) (CA) Rate & SAIDI"
url: https://epri-peac.com/utilities/ca-city-of-corona-ca-4390/
description: "2025 EIA-861 profile for City of Corona - (CA) (CA): 15.76 c/kWh rate, SAIDI 177.5 min/yr, 20 solar systems. Verified US government and CEC engineering data."
---

EIA-861 Grid Reliability & Net Metering

# City of Corona - (CA) (CA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Corona - (CA) (EIA ID 4390, CA) serves 1,305 customers at 15.76 c/kWh (-15.59 c/kWh vs California average) with 177.5 min/yr SAIDI (2.96 hrs/yr) with 20 net-metered residential solar systems (1.53% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 4390

- **Res. Rate** : 15.76 c/kWh

- **SAIDI (All Events)** : 177.5 min/yr

- **Net-Metered PV** : 20 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Corona - (CA) Compare on Tariffs and Reliability?

EIA-861 rate delta (-15.59 c/kWh vs California average), customer scale (1,305), and 2026 solar payback benchmarks for City of Corona - (CA).

Ranked #1,365 of 1,989 reporting US utilities for residential rate (above US utility median; lower than 31.3% of peers), City of Corona - (CA) serves 1,305 accounts in California (Municipal). Commercial power averages 14.13 c/kWh. It recorded 177.5 SAIDI outage minutes (2.96 hrs/yr, rank #375 of 751 reporting utilities), with 20 net-metered residential solar systems (1.53% customer adoption).

## Where Does City of Corona - (CA) Sit Across US Utility Rates?

Positions City of Corona - (CA) (15.76 c/kWh) across 1,989 US electric utility residential tariffs. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

## How Does City of Corona - (CA) Rank Across Cost & Reliability?

Percentile placement of City of Corona - (CA) across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for City of Corona - (CA)?

Four key EIA-861 rate, outage, and solar payback benchmarks for City of Corona - (CA) (Municipal) in California. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Lowest Rate #1,365 / 1,989

### 15.76 c/kWh (-15.59 vs CA)

Commercial avg: 14.13 c/kWh; Industrial: 11.0 c/kWh; est. residential bill $83.83/mo.

Reliability #375 / 751

### 177.5 min/yr (2.96 hrs)

1.7% (3.0 min) from Major Event Days; avg restore 94.9 min (~2.8 kWh @ 1.8 kW).

Post-25D Payback

### 13.9 Years @ 15.76 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,702/yr at 1,350 kWh/kW.

Distributed PV

### 20 Net-Metered Systems

0.16 MW residential PV (1.53% of customers) across 1 county; state FEMA declarations (2015-2026): 161.

City of Corona - (CA) Reliability & Solar Offset Calculation

Backup_Energy = (94.9 min / 60) * 1.8 kW = 2.8 kWh/event | Solar_Offset = 10,800 kWh * $0.1576 = $1,702/yr

EIA-861 2025 Utility ID 4390: Rate=15.76 c/kWh, Cust=1,305, SAIDI=177.5 min, PV=20.

**Result:** 2.96 outage hrs/yr; 13.9 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Corona - (CA)?

Complete Form EIA-861 filing summary for City of Corona - (CA) (ID 4390) covering sales, PV, and counties. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Form EIA-861 2025 filing metrics for City of Corona - (CA) (Utility ID 4390).

| EIA Utility ID & BA Code | ID 4390 · CISO |
|---|---|
| State & Ownership Type | CA · Municipal |
| Retail Electricity Rates | 15.76 c/kWh Res · 14.13 c Comm · 11.0 c Ind |
| Avg Monthly Usage & Bill | 531.8 kWh/mo ($83.83/mo est.) |
| SAIDI (All Events w/ MED) | 177.5 min/yr (2.96 hrs/yr) |
| SAIDI (Without Major Events) | 174.5 min/yr (Storm share: 1.7%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.87 /yr · 94.9 min restore |
| Residential Net-Metered PV | 20 systems (0.16 MW) |
| Counties Served (Sample) | 1 county (Riverside) |

## Which Peer Electric Utilities Operate in CA?

Compare City of Corona - (CA) directly with City of Vernon - (CA) and nearby California electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Vernon - (CA)**](https://epri-peac.com/utilities/ca-city-of-vernon-ca-19798/) | 12.99 c | — | 0 | 73 |
| [**3 Phases Renewables Inc**](https://epri-peac.com/utilities/ca-3-phases-renewables-inc-21093/) | 13.02 c | — | 0 | 53 |
| [**Valley Electric Assn, Inc**](https://epri-peac.com/utilities/ca-valley-electric-assn-inc-19840/) | 18.69 c | — | 0 | 12 |
| [**King City Community Power**](https://epri-peac.com/utilities/ca-king-city-community-power-61570/) | 14.2 c | — | 0 | 2,716 |

What to Check & Best-Fit Scenarios

## What Should City of Corona - (CA) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Corona - (CA) (Municipal, CA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: City of Corona - (CA) (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in CA.
- Export credit rules: check City of Corona - (CA)'s active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### City of Corona - (CA) Solar & Battery Evaluators

Compare your actual City of Corona - (CA) monthly kWh statement against 15.76 c/kWh and verify current export tariffs in CA.

### City of Corona - (CA) Outage & Generator Planners

Use City of Corona - (CA)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Corona - (CA) (California) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Corona - (CA)'s residential electricity rate and 2026 solar payback?

City of Corona - (CA) averages 15.76 c/kWh (-15.59 c/kWh vs California average vs. California). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,702/yr (13.9-year payback).

### How reliable is City of Corona - (CA) compared to peer California utilities?

City of Corona - (CA) recorded 177.5 SAIDI outage minutes (2.96 hrs/yr, rank #375 of 751 reporting utilities); compare rates and outage history directly with City of Vernon - (CA) (12.99 c/kWh) across California.

### Which counties and customers does City of Corona - (CA) serve in California?

EIA-861 filings list 1,305 customers across 1 county including Riverside, with 20 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Corona - (CA).

## Related Pages

Explore California energy benchmarks, City of Vernon - (CA), county outage profiles, and NEC 705.12 tools alongside City of Corona - (CA).

[California State Energy Rates & Utilities](https://epri-peac.com/states/california/) [All California County Power & Outage Profiles](https://epri-peac.com/counties/california/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 15.76 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
