---
title: "Gila River Indian Utility (AZ) Rate & SAIDI"
url: https://epri-peac.com/utilities/az-gila-river-indian-utility-authority-gricua-65261/
description: "2025 EIA-861 profile for Gila River Indian Utility Authority (GRICUA) (AZ): 14.27 c/kWh rate, SAIDI 263.8 min/yr, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# Gila River Indian Utility Authority (GRICUA) (AZ) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Gila River Indian Utility Authority (GRICUA) (EIA ID 65261, AZ) serves 2,707 customers at 14.27 c/kWh (-0.99 c/kWh vs Arizona average) with 263.8 min/yr SAIDI (4.4 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 65261

- **Res. Rate** : 14.27 c/kWh

- **SAIDI (All Events)** : 263.8 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Gila River Indian Utility Authority (GRICUA) Compare on Tariffs and Reliability?

How Gila River Indian Utility Authority (GRICUA) (Cooperative) performs across 2 counties on kWh rates and outage resilience.

Across 2 counties including Maricopa, Pinal, Gila River Indian Utility Authority (GRICUA) bills residential power at 14.27 c/kWh (-0.99 c/kWh vs Arizona average vs. Arizona), offsetting ~$1,541/yr on an 8 kW array compared to peer Dixie Escalante R E A, Inc (10.25 c/kWh). With 2,707 customer accounts (Cooperative), 2025 Form EIA-861 shows Gila River Indian Utility Authority (GRICUA) logged 263.8 SAIDI outage minutes (4.4 hrs/yr, 0.0% storm-driven), making battery backup or a standby ATS worthwhile, with zero residential net-metered PV reported in 2025 filings.

## Where Does Gila River Indian Utility Authority (GRICUA) Sit Across US Utility Rates?

National utility tariff curve marking Gila River Indian Utility Authority (GRICUA) at 14.27 c/kWh vs. 18.54 c/kWh US mean.

## How Does Gila River Indian Utility Authority (GRICUA) Rank Across Cost & Reliability?

Relative ranking of Gila River Indian Utility Authority (GRICUA) on residential electricity pricing and annual IEEE SAIDI outage duration.

## What Do EIA-861 Benchmarks Show for Gila River Indian Utility Authority (GRICUA)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Gila River Indian Utility Authority (GRICUA) in Arizona.

Lowest Rate #1,048 / 1,989

### 14.27 c/kWh (-0.99 vs AZ)

Commercial avg: 12.56 c/kWh; est. residential bill $201.39/mo.

Reliability #497 / 751

### 263.8 min/yr (4.4 hrs)

0.0% (0.0 min) from Major Event Days; avg restore 42.0 min (~1.3 kWh @ 1.8 kW).

Post-25D Payback

### 15.3 Years @ 14.27 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,541/yr at 1,350 kWh/kW.

Service Territory

### 2,707 Customers · 2 Counties

Serves 2 counties including Maricopa, Pinal in Arizona; state FEMA declarations (2015-2026): 43.

Gila River Indian Utility Authority (GRICUA) Reliability & Solar Offset Calculation

Backup_Energy = (42.0 min / 60) * 1.8 kW = 1.3 kWh/event | Solar_Offset = 10,800 kWh * $0.1427 = $1,541/yr

EIA-861 2025 Utility ID 65261: Rate=14.27 c/kWh, Cust=2,707, SAIDI=263.8 min.

**Result:** 4.4 outage hrs/yr; 15.3 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Gila River Indian Utility Authority (GRICUA)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Gila River Indian Utility Authority (GRICUA).

Form EIA-861 2025 filing metrics for Gila River Indian Utility Authority (GRICUA) (Utility ID 65261).

| EIA Utility ID & BA Code | ID 65261 · WALC |
|---|---|
| State & Ownership Type | AZ · Cooperative |
| Retail Electricity Rates | 14.27 c/kWh Res · 12.56 c Comm |
| Avg Monthly Usage & Bill | 1,411.5 kWh/mo ($201.39/mo est.) |
| SAIDI (All Events w/ MED) | 263.8 min/yr (4.4 hrs/yr) |
| SAIDI (Without Major Events) | 263.8 min/yr (Storm share: 0.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 6.274 /yr · 42.0 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 2 counties (Maricopa, Pinal) |

## Which Peer Electric Utilities Operate in AZ?

Nearby Arizona electric utilities of comparable customer size led by Dixie Escalante R E A, Inc (10.25 c/kWh).

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Dixie Escalante R E A, Inc**](https://epri-peac.com/utilities/az-dixie-escalante-r-e-a-inc-40165/) | 10.25 c | 99.4 min | 10 | 2,821 |
| [**Palmetto Solar, LLC**](https://epri-peac.com/utilities/az-palmetto-solar-llc-66026/) | 14.75 c | — | 0 | 2,320 |
| [**Morenci Water and Electric**](https://epri-peac.com/utilities/az-morenci-water-and-electric-12919/) | 6.02 c | — | 1 | 2,241 |
| [**Spruce Finance**](https://epri-peac.com/utilities/az-spruce-finance-59943/) | 10.94 c | — | 0 | 3,606 |

What to Check & Best-Fit Scenarios

## What Should Gila River Indian Utility Authority (GRICUA) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Gila River Indian Utility Authority (GRICUA) (Cooperative, AZ) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside Gila River Indian Utility Authority (GRICUA) (AZ) shift real bills away from 14.27 c/kWh.
- Outage clustering: Major Event Days skew Gila River Indian Utility Authority (GRICUA) annual minutes differently than routine non-storm reliability.

### Gila River Indian Utility Authority (GRICUA) Solar & Battery Evaluators

Compare your actual Gila River Indian Utility Authority (GRICUA) monthly kWh statement against 14.27 c/kWh and verify current export tariffs in AZ.

### Gila River Indian Utility Authority (GRICUA) Outage & Generator Planners

Use Gila River Indian Utility Authority (GRICUA)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Gila River Indian Utility Authority (GRICUA) (Arizona) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Gila River Indian Utility Authority (GRICUA)'s residential electricity rate and 2026 solar payback?

Gila River Indian Utility Authority (GRICUA) averages 14.27 c/kWh (-0.99 c/kWh vs Arizona average vs. Arizona). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,541/yr (15.3-year payback).

### How reliable is Gila River Indian Utility Authority (GRICUA) compared to peer Arizona utilities?

Gila River Indian Utility Authority (GRICUA) logged 263.8 SAIDI outage minutes (4.4 hrs/yr, 0.0% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with Dixie Escalante R E A, Inc (10.25 c/kWh) across Arizona.

### Which counties and customers does Gila River Indian Utility Authority (GRICUA) serve in Arizona?

EIA-861 filings list 2,707 customers across 2 counties including Maricopa, Pinal, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Gila River Indian Utility Authority (GRICUA).

## Related Pages

Explore Arizona energy benchmarks, Dixie Escalante R E A, Inc, county outage profiles, and NEC 705.12 tools alongside Gila River Indian Utility Authority (GRICUA).

[Arizona State Energy Rates & Utilities](https://epri-peac.com/states/arizona/) [All Arizona County Power & Outage Profiles](https://epri-peac.com/counties/arizona/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 14.27 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
