EIA-861 Grid Reliability & Net Metering

# Electrical Dist No2 Pinal County (AZ) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Electrical Dist No2 Pinal County (EIA ID 15048, AZ) serves 5,592 customers at 13.32 c/kWh (-1.94 c/kWh vs Arizona average) with 141.1 min/yr SAIDI (2.35 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 15048

- **Res. Rate** : 13.32 c/kWh

- **SAIDI (All Events)** : 141.1 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Electrical Dist No2 Pinal County Compare on Tariffs and Reliability?

EIA-861 rate delta (-1.94 c/kWh vs Arizona average), customer scale (5,592), and 2026 solar payback benchmarks for Electrical Dist No2 Pinal County.

Serving 5,592 customers across 1 county including Pinal in Arizona, Electrical Dist No2 Pinal County (Political Subdivision, Balancing Authority WALC) bills residential power at 13.32 c/kWh (-1.94 c/kWh vs Arizona average vs. Arizona), offsetting ~$1,439/yr on an 8 kW array. Grid filings show the utility recorded 141.1 SAIDI outage minutes (2.35 hrs/yr, rank #318 of 751 reporting utilities), with zero residential net-metered PV reported in 2025 filings.

## Where Does Electrical Dist No2 Pinal County Sit Across US Utility Rates?

Positions Electrical Dist No2 Pinal County (13.32 c/kWh) across 1,989 US electric utility residential tariffs. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

## How Does Electrical Dist No2 Pinal County Rank Across Cost & Reliability?

Percentile placement of Electrical Dist No2 Pinal County across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for Electrical Dist No2 Pinal County?

Four key EIA-861 rate, outage, and solar payback benchmarks for Electrical Dist No2 Pinal County (Political Subdivision) in Arizona.

Lowest Rate #754 / 1,989

### 13.32 c/kWh (-1.94 vs AZ)

Commercial avg: 8.6 c/kWh; Industrial: 11.44 c/kWh; est. residential bill $130.62/mo.

Reliability #318 / 751

### 141.1 min/yr (2.35 hrs)

18.5% (26.1 min) from Major Event Days; avg restore 85.5 min (~2.6 kWh @ 1.8 kW).

Post-25D Payback

### 16.4 Years @ 13.32 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,439/yr at 1,350 kWh/kW.

Service Territory

### 5,592 Customers · 1 County

Serves 1 county including Pinal in Arizona; state FEMA declarations (2015-2026): 43.

Electrical Dist No2 Pinal County Reliability & Solar Offset Calculation

Backup_Energy = (85.5 min / 60) * 1.8 kW = 2.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1332 = $1,439/yr

EIA-861 2025 Utility ID 15048: Rate=13.32 c/kWh, Cust=5,592, SAIDI=141.1 min.

**Result:** 2.35 outage hrs/yr; 16.4 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Electrical Dist No2 Pinal County?

Complete Form EIA-861 filing summary for Electrical Dist No2 Pinal County (ID 15048) covering sales, PV, and counties.

Form EIA-861 2025 filing metrics for Electrical Dist No2 Pinal County (Utility ID 15048).

| EIA Utility ID & BA Code | ID 15048 · WALC |
|---|---|
| State & Ownership Type | AZ · Political Subdivision |
| Retail Electricity Rates | 13.32 c/kWh Res · 8.6 c Comm · 11.44 c Ind |
| Avg Monthly Usage & Bill | 980.5 kWh/mo ($130.62/mo est.) |
| SAIDI (All Events w/ MED) | 141.1 min/yr (2.35 hrs/yr) |
| SAIDI (Without Major Events) | 115.0 min/yr (Storm share: 18.5%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.65 /yr · 85.5 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Pinal) |

## Which Peer Electric Utilities Operate in AZ?

Compare Electrical Dist No2 Pinal County directly with Spruce Finance and nearby Arizona electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Spruce Finance**](https://epri-peac.com/utilities/az-spruce-finance-59943/) | 10.94 c | — | 0 | 3,606 |
| [**SunPower Capital, LLC**](https://epri-peac.com/utilities/az-sunpower-capital-llc-59580/) | 16.76 c | — | 0 | 8,083 |
| [**Dixie Escalante R E A, Inc**](https://epri-peac.com/utilities/az-dixie-escalante-r-e-a-inc-40165/) | 10.25 c | 99.4 min | 10 | 2,821 |
| [**Gila River Indian Utility Authority (GRICUA)**](https://epri-peac.com/utilities/az-gila-river-indian-utility-authority-gricua-65261/) | 14.27 c | 263.8 min | 0 | 2,707 |

What to Check & Best-Fit Scenarios

## What Should Electrical Dist No2 Pinal County Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Electrical Dist No2 Pinal County (Political Subdivision, AZ) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: Electrical Dist No2 Pinal County's 13.32 c/kWh blended residential rate in AZ does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: Electrical Dist No2 Pinal County system-wide SAIDI averages rural and urban circuits across its AZ territory or nearby Spruce Finance.

### Electrical Dist No2 Pinal County Solar & Battery Evaluators

Compare your actual Electrical Dist No2 Pinal County monthly kWh statement against 13.32 c/kWh and verify current export tariffs in AZ.

### Electrical Dist No2 Pinal County Outage & Generator Planners

Use Electrical Dist No2 Pinal County's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Electrical Dist No2 Pinal County (Arizona) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Electrical Dist No2 Pinal County's residential electricity rate and 2026 solar payback?

Electrical Dist No2 Pinal County averages 13.32 c/kWh (-1.94 c/kWh vs Arizona average vs. Arizona). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,439/yr (16.4-year payback).

### How reliable is Electrical Dist No2 Pinal County compared to peer Arizona utilities?

Electrical Dist No2 Pinal County recorded 141.1 SAIDI outage minutes (2.35 hrs/yr, rank #318 of 751 reporting utilities); compare rates and outage history directly with Spruce Finance (10.94 c/kWh) across Arizona.

### Which counties and customers does Electrical Dist No2 Pinal County serve in Arizona?

EIA-861 filings list 5,592 customers across 1 county including Pinal, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Electrical Dist No2 Pinal County.

## Related Pages

Explore Arizona energy benchmarks, Spruce Finance, county outage profiles, and NEC 705.12 tools alongside Electrical Dist No2 Pinal County.

[Arizona State Energy Rates & Utilities](https://epri-peac.com/states/arizona/) [All Arizona County Power & Outage Profiles](https://epri-peac.com/counties/arizona/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.32 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)