---
title: "51-State Electricity Rates, Outages, Wages & Solar Data"
url: https://epri-peac.com/states/
description: "Compare 2025 EIA-861 residential electricity rates (18.54 c/kWh US avg), SAIDI outages, net-metered PV, and BLS electrician pay across 51 states."
---

State Energy & Grid Reference

# 51-State US Electricity, Solar & Licensing Benchmarks

Sources: **U.S. Energy Information Administration, Bureau of Labor Statistics, FEMA & NREL** Updated: **2026-11-26**

Across all 50 US states and DC, 2025 Form EIA-861 residential electricity averages 18.54 c/kWh (customer-weighted) with a 251.3 min/yr state median SAIDI outage duration and $64,810/yr BLS May 2025 electrician median pay. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **Jurisdictions Covered** : 50 States + DC

- **US Weighted Rate** : 18.54 c/kWh

- **BLS Elec. Median** : $64,810/yr

- **Federal Tax Status** : 25D Ended Dec 2025

Sunlit US residential neighborhood featuring rooftop solar arrays and local electrical distribution infrastructure

## Which States Have the Highest Residential Electricity Rates in 2025?

Top 12 residential rate states from EIA Form EIA-861 benchmark where solar self-consumption offsets high grid retail tariffs.

## How Do All 51 US Jurisdictions Compare on Rates, NEC Codes, Outages, and Wages?

Filter and sort verified Form EIA-861 electricity prices, adopted National Electrical Code editions, annual SAIDI interruption minutes, residential PV systems, and median electrician salaries.

Filter 51 states by name or NEC edition

51 of 51 jurisdictions shown

Click any column header to sort or use quick filters above across all 50 states and DC. Sources: EIA-861 (2025), Bureau of Labor Statistics (May 2025), and state electrical boards.

| State | Rate (c/kWh) | Avg Bill ($/mo) | NEC Edition | SAIDI (min/yr) | Res PV Systems | Elec. Median ($/yr) |
|---|---|---|---|---|---|---|
| [**Alabama** (AL)](https://epri-peac.com/states/alabama/) | 16.09 | $184.31 | 2020 NEC | 270.2 | 87 | $55,690 |
| [**Alaska** (AK)](https://epri-peac.com/states/alaska/) | 26.11 | $147.18 | 2023 NEC | 563.5 | 3,005 | $89,440 |
| [**Arizona** (AZ)](https://epri-peac.com/states/arizona/) | 15.26 | $157.15 | Local Adoption | 68.7 | 333,870 | $61,060 |
| [**Arkansas** (AR)](https://epri-peac.com/states/arkansas/) | 12.87 | $138.42 | 2020 NEC | 474.5 | 19,458 | $49,070 |
| [**California** (CA)](https://epri-peac.com/states/california/) | 31.35 | $154.73 | 2022 CEC (2020 NEC base) | 358.3 | 2,241,381 | $76,160 |
| [**Colorado** (CO)](https://epri-peac.com/states/colorado/) | 15.69 | $103.30 | 2023 NEC | 272.5 | 191,943 | $62,230 |
| [**Connecticut** (CT)](https://epri-peac.com/states/connecticut/) | 29.31 | $206.46 | 2020 NEC | 185.8 | 119,508 | $77,540 |
| [**Delaware** (DE)](https://epri-peac.com/states/delaware/) | 17.15 | $157.80 | 2023 NEC | 103.9 | 15,186 | $63,700 |
| [**District of Columbia** (DC)](https://epri-peac.com/states/district-of-columbia/) | 21.92 | $140.05 | 2017/2020 DC Code | 50.3 | 21,479 | $78,970 |
| [**Florida** (FL)](https://epri-peac.com/states/florida/) | 15.21 | $167.86 | 2020 NEC (FBC 8th Ed.) | 72.7 | 319,411 | $57,250 |
| [**Georgia** (GA)](https://epri-peac.com/states/georgia/) | 14.74 | $158.70 | 2023 NEC | 268.9 | 20,377 | $58,320 |
| [**Hawaii** (HI)](https://epri-peac.com/states/hawaii/) | 40.40 | $207.89 | 2020 NEC | 335.4 | 104,259 | $96,460 |
| [**Idaho** (ID)](https://epri-peac.com/states/idaho/) | 11.83 | $110.36 | 2023 NEC | 291.4 | 23,850 | $63,000 |
| [**Illinois** (IL)](https://epri-peac.com/states/illinois/) | 17.67 | $126.59 | Local Adoption | 145.8 | 119,442 | $99,560 |
| [**Indiana** (IN)](https://epri-peac.com/states/indiana/) | 15.96 | $149.72 | 2020/2009 local | 379.0 | 11,490 | $68,490 |
| [**Iowa** (IA)](https://epri-peac.com/states/iowa/) | 13.62 | $117.30 | 2023 NEC | 183.2 | 19,220 | $60,860 |
| [**Kansas** (KS)](https://epri-peac.com/states/kansas/) | 14.44 | $126.42 | Local Adoption | 192.8 | 9,805 | $65,860 |
| [**Kentucky** (KY)](https://epri-peac.com/states/kentucky/) | 13.13 | $143.72 | 2023 NEC | 396.3 | 10,993 | $59,720 |
| [**Louisiana** (LA)](https://epri-peac.com/states/louisiana/) | 12.52 | $153.32 | 2020 NEC | 271.6 | 35,971 | $61,540 |
| [**Maine** (ME)](https://epri-peac.com/states/maine/) | 27.69 | $147.67 | 2023 NEC | 363.4 | 18,997 | $75,380 |
| [**Maryland** (MD)](https://epri-peac.com/states/maryland/) | 19.53 | $184.42 | 2023 NEC | 178.3 | 118,789 | $73,490 |
| [**Massachusetts** (MA)](https://epri-peac.com/states/massachusetts/) | 30.41 | $181.08 | 2023 NEC (MA Amendments) | 122.2 | 209,993 | $79,420 |
| [**Michigan** (MI)](https://epri-peac.com/states/michigan/) | 20.03 | $127.17 | 2023 NEC (MI Part 8) | 608.7 | 26,849 | $76,270 |
| [**Minnesota** (MN)](https://epri-peac.com/states/minnesota/) | 15.83 | $117.67 | 2023 NEC | 182.0 | 26,695 | $78,160 |
| [**Mississippi** (MS)](https://epri-peac.com/states/mississippi/) | 14.03 | $166.05 | Local Adoption | 524.4 | 2,029 | $60,860 |
| [**Missouri** (MO)](https://epri-peac.com/states/missouri/) | 13.30 | $137.97 | Local Adoption | 466.0 | 33,251 | $65,410 |
| [**Montana** (MT)](https://epri-peac.com/states/montana/) | 12.99 | $110.80 | 2023 NEC | 286.3 | 12,536 | $76,760 |
| [**Nebraska** (NE)](https://epri-peac.com/states/nebraska/) | 12.05 | $117.23 | 2023 NEC | 542.8 | 3,256 | $60,820 |
| [**Nevada** (NV)](https://epri-peac.com/states/nevada/) | 13.26 | $115.07 | 2023/2020 local | 127.8 | 142,497 | $73,570 |
| [**New Hampshire** (NH)](https://epri-peac.com/states/new-hampshire/) | 24.53 | $156.94 | 2023 NEC | 150.7 | 25,210 | $62,840 |
| [**New Jersey** (NJ)](https://epri-peac.com/states/new-jersey/) | 22.48 | $150.59 | 2023 NEC (NJ Rehab Subcode) | 155.0 | 219,395 | $77,250 |
| [**New Mexico** (NM)](https://epri-peac.com/states/new-mexico/) | 14.85 | $94.65 | 2023 NEC | 161.9 | 64,532 | $58,390 |
| [**New York** (NY)](https://epri-peac.com/states/new-york/) | 26.39 | $154.75 | 2020/2025 NY Code | 246.8 | 251,828 | $78,750 |
| [**North Carolina** (NC)](https://epri-peac.com/states/north-carolina/) | 14.00 | $146.14 | 2020 NEC (NC Amendments) | 191.5 | 63,841 | $56,800 |
| [**North Dakota** (ND)](https://epri-peac.com/states/north-dakota/) | 11.82 | $126.40 | 2023 NEC | 212.1 | 89 | $65,710 |
| [**Ohio** (OH)](https://epri-peac.com/states/ohio/) | 16.90 | $147.74 | 2023 NEC (Commercial) / 2019 Res. | 205.5 | 33,206 | $64,700 |
| [**Oklahoma** (OK)](https://epri-peac.com/states/oklahoma/) | 13.21 | $140.52 | 2023 NEC | 297.0 | 18,196 | $61,010 |
| [**Oregon** (OR)](https://epri-peac.com/states/oregon/) | 15.46 | $133.89 | 2023 OR Electrical Code | 302.4 | 61,540 | $101,310 |
| [**Pennsylvania** (PA)](https://epri-peac.com/states/pennsylvania/) | 19.29 | $161.90 | 2017/2020 UCC | 413.0 | 93,934 | $67,600 |
| [**Rhode Island** (RI)](https://epri-peac.com/states/rhode-island/) | 29.48 | $165.62 | 2023 NEC | 182.9 | 19,998 | $74,090 |
| [**South Carolina** (SC)](https://epri-peac.com/states/south-carolina/) | 15.12 | $161.21 | 2020 NEC | 153.0 | 41,365 | $58,740 |
| [**South Dakota** (SD)](https://epri-peac.com/states/south-dakota/) | 13.32 | $131.10 | 2023 NEC | 284.3 | 570 | $61,390 |
| [**Tennessee** (TN)](https://epri-peac.com/states/tennessee/) | 13.22 | $156.03 | 2017 NEC (Statewide) | 227.7 | 97 | $61,090 |
| [**Texas** (TX)](https://epri-peac.com/states/texas/) | 15.40 | $170.95 | 2023 NEC | 211.1 | 138,081 | $58,570 |
| [**Utah** (UT)](https://epri-peac.com/states/utah/) | 13.02 | $99.06 | 2023 NEC | 117.0 | 86,164 | $62,000 |
| [**Vermont** (VT)](https://epri-peac.com/states/vermont/) | 22.79 | $134.78 | 2023 NEC | 251.3 | 9,399 | $63,430 |
| [**Virginia** (VA)](https://epri-peac.com/states/virginia/) | 15.28 | $163.05 | 2021 USBC (2020 NEC) | 763.1 | 74,360 | $62,900 |
| [**Washington** (WA)](https://epri-peac.com/states/washington/) | 13.17 | $124.41 | 2023 NEC (WAC 296-46B) | 380.8 | 66,257 | $95,220 |
| [**West Virginia** (WV)](https://epri-peac.com/states/west-virginia/) | 15.39 | $165.13 | 2020 NEC | 1,013.1 | 4,841 | $64,810 |
| [**Wisconsin** (WI)](https://epri-peac.com/states/wisconsin/) | 18.08 | $120.60 | 2017 NEC (SPS 316) | 264.1 | 21,545 | $76,540 |
| [**Wyoming** (WY)](https://epri-peac.com/states/wyoming/) | 13.37 | $111.59 | 2023 NEC | 224.2 | 3,547 | $76,120 |

## What Do Federal Filings Show About State Rates, Outages & Wages?

Each direct answer below summarizes verified federal statistics, state contractor boards, NEC tables, and solar test data.

Home Solar Payback

### What does residential solar payback look like in 2026 without the 25D tax credit?

Because IRS Section 25D ended after December 31, 2025, homeowner cash purchases receive 0% federal 25D credit. Across 1,996 EIA-861 utilities (US weighted rate 18.54 c/kWh), an 8 kW cash array ($23,600 at $2.95/W) offsets ~$2,002/yr for an 11.8-year US baseline payback—faster in high-rate states like HI/CA/MA/CT.

Source: IRS 25D + Form EIA-861 (2025) · [See 2026 tax & payback rules](https://epri-peac.com/tax-credits-2026/)

Panel Upgrades

### When does solar or an EV charger require a 200 A electrical panel upgrade?

Under NEC 705.12(B)(3)(2), a 200 A busbar with a 200 A main breaker allows (200 x 1.20) - 200 = 40 A of solar backfeed (7.68 kW AC). Larger arrays, 60 A EVSE + heat-pump loads, or obsolete FPE Stab-Lok / Zinsco panels require a 175 A main derate, supply-side tap, or 200 A upgrade (BLS US median electrician pay: $64,810/yr).

Source: NEC 705.12, UL DIVQ & BLS May 2025 wage survey · [Run 120% busbar rule checker](https://epri-peac.com/tools/solar-busbar-120/)

What to Check & Best-Fit Scenarios

## What Are the Limitations of Reference Data and Who Should Not Rely on It Alone?

Published government datasets and CEC lab ratings establish baseline electrical and solar bounds, subject to field verification at your specific property.

- Tariffs change mid-year: verify your electric utility's current net-billing export tariff and transformer capacity before signing contracts.
- NEC edition lags: state and city building departments enforce varying NEC editions (2017, 2020, 2023, or 2026) with local amendments.
- Not a substitute for on-site inspection: busbar pitting, ungrounded circuits, or loose neutral lugs require in-person testing by a licensed electrician.

### Grid-Outage Resilience Priority

Focus on high-SAIDI utilities (>180 min/yr) and verify 120% busbar capacity for a 60 A hybrid battery or 200 A transfer switch.

### Post-25D Cash Solar Payback Focus

With 0% federal 25D in 2026, prioritize higher-tariff markets above 18 c/kWh and avoid 20%-35% loan dealer fees.

### EV Charging & Circuit Safety

Hardwire 48 A chargers on 6 AWG Cu THHN (75 C) rather than 6/2 NM-B, or step down to 32 A (40 A breaker) on tight 100 A panels.

## Related Pages

Explore related homeowner calculators, state electricity rate guides, licensed electrician lists, safety recall alerts, and solar equipment datasheets across this directory.

[Run Post-25D State Solar Payback Estimator](https://epri-peac.com/tools/post-25d-solar-payback/) [Browse Major US Electric Utilities by SAIDI](https://epri-peac.com/utilities/) [Find State-Licensed Electricians Across 5 States](https://epri-peac.com/pros/) [2026 Solar & Panel Tax Credit Termination Guide](https://epri-peac.com/tax-credits-2026/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [Occupational Employment and Wage Statistics (OEWS) — Electricians (47-2111) & Solar PV Installers (47-2231)](https://api.bls.gov/publicAPI/v1/timeseries/data/) — U.S. Bureau of Labor Statistics (BLS), May 2025 OEWS (retrieved 2026-11-23)
3. [OpenFEMA Disaster Declarations Summaries v2 (Storm, Hurricane, Ice, Wildfire Grid Perils)](https://www.fema.gov/api/open/v2/DisasterDeclarationsSummaries) — Federal Emergency Management Agency (FEMA), v2 (2015-2026) (retrieved 2026-11-23)
4. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

2026 Tax Credit Reality

Residential federal 25D & 25C credits expired Dec. 31, 2025. Verify state-level utility rates and commercial 48E lease math before signing solar contracts.
[Read 2026 Policy Details](https://epri-peac.com/tax-credits-2026/)
