---
title: "SPITZER ENERGY COMPANY Inverter (962W)"
url: https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-m1000-s-208v/
description: "CEC specs for SPITZER ENERGY COMPANY: SPZ-M1000-S {208V}: 962W AC, 208V, 15A OCPD, and NEC 705.12 checks. Verified US government and CEC engineering data."
---

CEC Grid-Support Inverter

# SPITZER ENERGY COMPANY: SPZ-M1000-S {208V} — CEC Inverter Specifications

Manufacturer: [**SPITZER ENERGY COMPANY**](https://epri-peac.com/solar-equipment/brands/spitzer-energy-company/) Registry: **CEC Verified Engineering Specification**

SPITZER ENERGY COMPANY: SPZ-M1000-S {208V} outputs 962 W AC at 208 V, commercial single-phase (4.6 A continuous, 15 A OCPD), ranking #1,821 of 2,343 CEC inverters at 96.24% efficiency with a 35-50 V MPPT window and 50 V DC limit. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **AC Output (Paco)** : 962 W

- **AC Voltage** : 208 V, commercial single-phase

- **Min PV Breaker** : 15 A (14 AWG Cu)

- **CEC Efficiency** : 96.24%

Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit

## How Does SPITZER ENERGY COMPANY: SPZ-M1000-S {208V} Compare Against Peer CEC Listings?

Breaker sizing (15 A), 14 AWG Cu wire rules, and DC input limits for SPITZER ENERGY COMPANY: SPZ-M1000-S {208V}.

Classified as a grid-tied PV inverter (active in CEC directory), SPITZER ENERGY COMPANY: SPZ-M1000-S {208V} requires 5.8 A design capacity -> 15 A breaker using 14 AWG Cu copper at 75 C terminals. Weighted efficiency sits at 96.24% (-0.58 pts vs overall CEC median) across 2,343 CEC models, while module-level microinverter output eliminates high-voltage dc rooftop strings and connects via a 240v ac trunk circuit.

## Where Does SPITZER ENERGY COMPANY: SPZ-M1000-S {208V} Fall Across Listed CEC Models?

Output power comparison showing where SPITZER ENERGY COMPANY: SPZ-M1000-S {208V} sits among all 2,343 CEC-listed grid-support inverters. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

## What Dataset Percentiles Define SPITZER ENERGY COMPANY: SPZ-M1000-S {208V}?

Relative ranking of SPITZER ENERGY COMPANY: SPZ-M1000-S {208V} on continuous AC power, CEC weighted efficiency, and OCPD breaker current.

## What Do the Dataset Ranks Show for SPITZER ENERGY COMPANY: SPZ-M1000-S {208V}?

Snapshot of SPITZER ENERGY COMPANY: SPZ-M1000-S {208V} efficiency rank (#1,821), OCPD breaker size, MPPT span, and busbar verdict.

Eff #1,821 / 2,343

### 96.24% CEC Weighted Efficiency

-0.17 pts vs the 96.41% 208 V median; overall power rank #1,844 (962 W, below CEC median; higher than 21.2% of peers).

NEC 705.12 Check

### 15 A Required Backfeed OCPD

125% x 4.6 A = 5.8 A -> 15 A standard OCPD using 14 AWG Cu (75 C).

MPPT Window

### 35 V - 50 V (Max 50 V DC)

Tracking span of 15.0 V; active in CEC directory (grid-tied PV inverter).

Commercial / 3-Phase Fit

### PASS (120% Commercial Busbar)

Evaluated for 208 V, commercial single-phase switchgear (200A Bus / 200A Main (208V) to 1,200A Bus / 1,200A Main (208V)) under NEC 705.12 / 705.11.

NEC 705.12 Backfeed OCPD & 120% Busbar Formula

I_cont = 962.0W / 208 V -> 4.6 A | Breaker >= 1.25 * 4.6 = 5.8 A -> 15 A

CEC Inverters.csv for SPITZER ENERGY COMPANY: SPZ-M1000-S {208V}: Paco=962.0 W, Vac=208 V, Vdcmax=50.0 V, Eff=96.24%.

**Result:** Min 15 A breaker & 14 AWG Cu (75 C); 1,200A Bus / 1,200A Main (208V): PASS (120% Commercial Busbar).

## What Are the Published CEC Specifications for SPITZER ENERGY COMPANY: SPZ-M1000-S {208V}?

Complete California Energy Commission grid-support inverter ratings and hybrid battery capabilities for SPITZER ENERGY COMPANY: SPZ-M1000-S {208V}. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Official California Energy Commission (NREL SAM) test parameters for SPITZER ENERGY COMPANY: SPZ-M1000-S {208V}.

| Parameter | Measured / Listed Value | Engineering Significance |
|---|---|---|
| **Max Continuous AC Power (Paco)** | 962 W | Determines required backfeed OCPD size via 125% continuous rule |
| **Nominal AC Voltage (Vac)** | 208 V, commercial single-phase | 240V split-phase residential vs. 208V/480V/MV commercial |
| **Max DC Input Voltage (Vdcmax)** | 50 V | Hard ceiling for cold-weather PV string Voc under NEC 690.7 |
| **MPPT Operating Range** | 35 V - 50 V | Optimal DC string Vmp window for full power harvest |
| **Max Input DC Current (Idcmax)** | 23.7993 A | Used to verify parallel string combiner limits |
| **CEC Weighted Efficiency** | 96.24% | Calculated AC/DC conversion ratio from CEC test protocol |
| **Inverter Topology** | Hybrid: No (Grid-Tied PV) | CEC Solar Equipment List grid-support certification |

## What Switchgear Limits Apply to SPITZER ENERGY COMPANY: SPZ-M1000-S {208V} (208 V, commercial single-phase)?

NEC 705.12(B)(3)(2) backfeed compliance table for SPITZER ENERGY COMPANY: SPZ-M1000-S {208V} at 208 V, commercial single-phase.

Evaluates SPITZER ENERGY COMPANY: SPZ-M1000-S {208V} (15 A required OCPD at 208 V, commercial single-phase) across standard distribution busbars.

| Switchboard / Interconnect | 120% Max Backfeed | Required PV OCPD | Compliance Verdict |
|---|---|---|---|
| **200A Bus / 200A Main (208V)** | 40 A | 15 A | PASS (120% Commercial Busbar) |
| **400A Bus / 400A Main (208V)** | 80 A | 15 A | PASS (120% Commercial Busbar) |
| **600A Bus / 600A Main (208V)** | 120 A | 15 A | PASS (120% Commercial Busbar) |
| **800A Bus / 800A Main (208V)** | 160 A | 15 A | PASS (120% Commercial Busbar) |
| **1,200A Bus / 1,200A Main (208V)** | 240 A | 15 A | PASS (120% Commercial Busbar) |

## Which CEC PV Module Strings Pair With SPITZER ENERGY COMPANY: SPZ-M1000-S {208V}?

Minimum and maximum series solar module strings fitting SPITZER ENERGY COMPANY: SPZ-M1000-S {208V} MPPT and 50 V limits.

Sampled CEC PV modules aligned within 35.0-50.0 V MPPT and 50.0 V max DC at -10 C.

| CEC Module | STC (W) | -10 C Voc | Valid String Range | Max String DC |
|---|---|---|---|---|
| [**Aptos Solar Technology LLC DNA-108-MFN10-440W**](https://epri-peac.com/solar-equipment/modules/aptos-solar-technology-llc/aptos-solar-technology-llc-dna-108-mfn10-440w/) | 440.0 W | 42.15 V | 1 panel (micro/module) | 0.44 kW |
| [**Boviet Solar Technology Co Ltd BVM7610M-425-H-HC-BF**](https://epri-peac.com/solar-equipment/modules/boviet-solar-technology-co-ltd/boviet-solar-technology-co-ltd-bvm7610m-425-h-hc-bf/) | 425.0 W | 44.75 V | 1 panel (micro/module) | 0.42 kW |
| [**CSI Solar Co Ltd CS6P-200P**](https://epri-peac.com/solar-equipment/modules/csi-solar-co-ltd/csi-solar-co-ltd-cs6p-200p/) | 200.0 W | 40.6 V | 1 panel (micro/module) | 0.2 kW |
| [**Hanwha Qcells (Qidong) Co Ltd HSL60P6-PB-0-270TW**](https://epri-peac.com/solar-equipment/modules/hanwha-qcells-qidong-co-ltd/hanwha-qcells-qidong-co-ltd-hsl60p6-pb-0-270tw/) | 270.0 W | 42.56 V | 1 panel (micro/module) | 0.27 kW |

## Which Competing Grid-Support Inverters Compare to SPITZER ENERGY COMPANY: SPZ-M1000-S {208V}?

Peer 208 V, commercial single-phase CEC inverters near 962 W AC output such as Cherry Solution Co Ltd: CMI-1000S-SA {208V}.

Alternative CEC inverters at comparable AC output power and voltage class.

| Alternative Inverter | AC Output | Delta | Vac | Max DC | CEC Eff |
|---|---|---|---|---|---|
| [**Cherry Solution Co Ltd: CMI-1000S-SA {208V}**](https://epri-peac.com/solar-equipment/inverters/cherry-solution-co-ltd/cherry-solution-co-ltd-cmi-1000s-sa-208v/) Cherry Solution Co Ltd | 994 W | +32 W | 208.0 V | 50.0 V | 96.35% |
| [**Cherry Solution Co Ltd: CMI-1000S-WA {208V}**](https://epri-peac.com/solar-equipment/inverters/cherry-solution-co-ltd/cherry-solution-co-ltd-cmi-1000s-wa-208v/) Cherry Solution Co Ltd | 994 W | +32 W | 208.0 V | 50.0 V | 96.35% |
| [**Cherry Solution Co Ltd: CMI-800S-SA {208V}**](https://epri-peac.com/solar-equipment/inverters/cherry-solution-co-ltd/cherry-solution-co-ltd-cmi-800s-sa-208v/) Cherry Solution Co Ltd | 800 W | -162 W | 208.0 V | 50.0 V | 95.84% |
| [**Cherry Solution Co Ltd: CMI-800S-WA {208V}**](https://epri-peac.com/solar-equipment/inverters/cherry-solution-co-ltd/cherry-solution-co-ltd-cmi-800s-wa-208v/) Cherry Solution Co Ltd | 800 W | -162 W | 208.0 V | 50.0 V | 95.84% |

What to Check & Best-Fit Scenarios

## What Are the Interconnection Limits and Best-Fit Uses for SPITZER ENERGY COMPANY: SPZ-M1000-S {208V}?

Check SPITZER ENERGY COMPANY: SPZ-M1000-S {208V} (962 W AC, 15 A OCPD) against your main panel busbar, winter string Voc, and IEEE 1547 outage rules.

- Anti-islanding shutdown: grid-tied inverters shut off within 2 seconds during blackouts under IEEE 1547 unless paired with a battery microgrid interconnect.
- Busbar 120% limit: Module-level microinverter output eliminates high-voltage DC rooftop strings and connects via a 240V AC trunk circuit.
- Cold Voc hard ceiling: never allow winter open-circuit PV string voltage to exceed 50 V DC on SPITZER ENERGY COMPANY: SPZ-M1000-S {208V}.

### SPITZER ENERGY COMPANY: SPZ-M1000-S {208V} Panel & Wire Spec

Size 75 C copper conductors at 14 AWG Cu on a 15 A OCPD breaker (4.6 A continuous).

### Alternative Inverter Comparison

Compare efficiency (96.24%) and MPPT window (35-50 V) directly against Cherry Solution Co Ltd: CMI-1000S-SA {208V} (994 W).

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for SPITZER ENERGY COMPANY: SPZ-M1000-S {208V} by SPITZER ENERGY COMPANY covering breaker sizing, MPPT limits, and 208 V, commercial single-phase interconnection.

### What breaker and wire size does SPITZER ENERGY COMPANY: SPZ-M1000-S {208V} require?

At 962 W continuous AC (208 V, commercial single-phase), continuous current is 4.6 A; 125% NEC 690.8/705.12 sizing requires a 15 A breaker and 14 AWG Cu (75 C) wire.

### What commercial switchgear or feeder sizing does SPITZER ENERGY COMPANY: SPZ-M1000-S {208V} require?

At 962 W AC and 208 V, commercial single-phase, continuous line current is 4.6 A, requiring a 15 A OCPD and 1,200A Bus / 1,200A Main (208V) or NEC 705.11 interconnection.

### How does SPITZER ENERGY COMPANY: SPZ-M1000-S {208V} compare to Cherry Solution Co Ltd: CMI-1000S-SA {208V}?

SPITZER ENERGY COMPANY: SPZ-M1000-S {208V} delivers 962 W AC at 96.24% CEC efficiency with a 50 V DC ceiling, while Cherry Solution Co Ltd: CMI-1000S-SA {208V} outputs 994 W at 208 V, commercial single-phase.

## Related Pages

Explore SPITZER ENERGY COMPANY hardware, Cherry Solution Co Ltd: CMI-1000S-SA {208V}, utility rates, and NEC 705.12 sizing calculators alongside SPITZER ENERGY COMPANY: SPZ-M1000-S {208V}.

[All SPITZER ENERGY COMPANY Certified Solar Hardware](https://epri-peac.com/solar-equipment/brands/spitzer-energy-company/) [Browse All CEC Solar Modules & Inverters](https://epri-peac.com/solar-equipment/) [Check NEC 705.12 120% Busbar Capacity Calculator](https://epri-peac.com/tools/solar-busbar-120/) [Run NEC 690.7 Cold-Temp PV String Voc Calculator](https://epri-peac.com/tools/pv-string-voc/)

## Sources

1. [CEC Solar Equipment List — Grid-Support Inverters (NREL SAM Distribution)](https://raw.githubusercontent.com/NREL/SAM/develop/deploy/libraries/CEC%20Inverters.csv) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
2. [CEC Solar Equipment List — PV Modules (NREL SAM Distribution)](https://raw.githubusercontent.com/NREL/SAM/develop/deploy/libraries/CEC%20Modules.csv) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
3. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)

Spec Sheet Sections

- Dataset Ranks & Thresholds
- CEC Electrical Table
- Alternative Peers
- Engineering FAQ
- Official Sources

Interactive NEC Tools

Run custom cold-temp string Voc or 120% panel busbar checks for this hardware.
[PV String Voc Calculator](https://epri-peac.com/tools/pv-string-voc/) [120% Busbar Checker](https://epri-peac.com/tools/solar-busbar-120/)

More From SPITZER ENERGY COMPANY

- [All SPITZER ENERGY COMPANY Specs](https://epri-peac.com/solar-equipment/brands/spitzer-energy-company/)
- [SPITZER ENERGY COMPANY: SPZ 15KW-LV {208V}](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-15kw-lv-208v/)
- [SPITZER ENERGY COMPANY: SPZ 15KW-LV-B {208V}](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-15kw-lv-b-208v/)
- [SPITZER ENERGY COMPANY: SPZ 15KW-LV {240V}](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-15kw-lv-240v/)
- [SPITZER ENERGY COMPANY: SPZ 15KW-LV-B {240V}](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-15kw-lv-b-240v/)
- [SPITZER ENERGY COMPANY: SPZ 12KW-LV-B {208V}](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-12kw-lv-b-208v/)
