---
title: "SPITZER ENERGY COMPANY Solar Panels and Inverters"
url: https://epri-peac.com/solar-equipment/brands/spitzer-energy-company/
description: "CEC datasheets for SPITZER ENERGY COMPANY: 721–10,186W AC, 0 module series, 20 inverter models, and NEC limits. Verified CEC solar ratings."
---

CEC Brand Hub

# SPITZER ENERGY COMPANY — CEC Certified Solar Equipment Catalog

Registry: **California Energy Commission (CEC)** Verified: **2026-11-26**

SPITZER ENERGY COMPANY holds 20 verified California Energy Commission (CEC) certifications and 20 grid-support inverter models (721–10,186W AC). On the AC conversion side, SPITZER ENERGY COMPANY lists 20 CEC-certified inverters from 721 W to 10,186 W AC (96.5% median weighted CEC efficiency, including 12 battery-ready hybrid units). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **Manufacturer** : SPITZER ENERGY COMPANY

- **PV Module Series** : 0

- **Listed Inverters** : 20

- **Output Range** : 721–10,186W AC

Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit

## How Do SPITZER ENERGY COMPANY Solar Specifications Compare Across the CEC Catalog?

Technical overview of SPITZER ENERGY COMPANY solar certifications used by municipal inspectors and utilities to approve residential rooftop permits.

Independent third-party test metrics from the CEC confirm electrical ratings for SPITZER ENERGY COMPANY hardware under UL 1703/61730 and IEEE 1547 utility protocols. On the AC conversion side, SPITZER ENERGY COMPANY lists 20 CEC-certified inverters from 721 W to 10,186 W AC (96.5% median weighted CEC efficiency, including 12 battery-ready hybrid units). No active CPSC electrical recalls match SPITZER ENERGY COMPANY in our federal recall archive as of 2026.

## Which SPITZER ENERGY COMPANY Grid-Support Inverters Are Listed? (20)

Compare CEC-certified SPITZER ENERGY COMPANY inverters by continuous AC output watts, nominal grid voltage, maximum DC input ceiling, and weighted test efficiency.

Filter SPITZER ENERGY COMPANY Inverters

Verified CEC grid-support inverters from SPITZER ENERGY COMPANY.

| Inverter Model | AC Output (W) | Vac (V) | Max DC (V) | CEC Eff (%) |
|---|---|---|---|---|
| [**SPITZER ENERGY COMPANY: SPZ 15KW-LV {208V}**](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-15kw-lv-208v/) | 10,186 | 208.0 | 480.0 | 96.46 |
| [**SPITZER ENERGY COMPANY: SPZ 15KW-LV-B {208V}**](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-15kw-lv-b-208v/) | 10,186 | 208.0 | 480.0 | 96.46 |
| [**SPITZER ENERGY COMPANY: SPZ 15KW-LV {240V}**](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-15kw-lv-240v/) | 10,147 | 240.0 | 480.0 | 96.56 |
| [**SPITZER ENERGY COMPANY: SPZ 15KW-LV-B {240V}**](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-15kw-lv-b-240v/) | 10,140 | 240.0 | 480.0 | 96.56 |
| [**SPITZER ENERGY COMPANY: SPZ 12KW-LV-B {208V}**](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-12kw-lv-b-208v/) | 8,060 | 208.0 | 480.0 | 96.45 |
| [**SPITZER ENERGY COMPANY: SPZ 12KW-LV-B {240V}**](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-12kw-lv-b-240v/) | 8,047 | 240.0 | 480.0 | 96.55 |
| [**SPITZER ENERGY COMPANY: SPZ 12KW-LV-A {208V}**](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-12kw-lv-a-208v/) | 7,648 | 208.0 | 480.0 | 96.57 |
| [**SPITZER ENERGY COMPANY: SPZ 12KW-LV-A {240V}**](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-12kw-lv-a-240v/) | 7,647 | 240.0 | 480.0 | 96.53 |
| [**SPITZER ENERGY COMPANY: SPZ 9KW-LV {240V}**](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-9kw-lv-240v/) | 6,149 | 240.0 | 480.0 | 97.06 |
| [**SPITZER ENERGY COMPANY: SPZ 9KW-LV {208V}**](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-9kw-lv-208v/) | 6,124 | 208.0 | 480.0 | 96.64 |
| [**SPITZER ENERGY COMPANY: SPZ 75KW-LV {240V}**](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-75kw-lv-240v/) | 5,040 | 240.0 | 480.0 | 96.99 |
| [**SPITZER ENERGY COMPANY: SPZ 75KW-LV {208V}**](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-75kw-lv-208v/) | 5,020 | 208.0 | 480.0 | 96.62 |
| [**SPITZER ENERGY COMPANY: SPZ-M1000-S {208V}**](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-m1000-s-208v/) | 962 | 208.0 | 50.0 | 96.24 |
| [**SPITZER ENERGY COMPANY: SPZ-M1000-W {208V}**](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-m1000-w-208v/) | 962 | 208.0 | 50.0 | 96.24 |
| [**SPITZER ENERGY COMPANY: SPZ-M1000-S {240V}**](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-m1000-s-240v/) | 958 | 240.0 | 50.0 | 95.48 |
| [**SPITZER ENERGY COMPANY: SPZ-M1000-W {240V}**](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-m1000-w-240v/) | 958 | 240.0 | 50.0 | 95.48 |
| [**SPITZER ENERGY COMPANY: SPZ-M800-S {240V}**](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-m800-s-240v/) | 723 | 240.0 | 50.0 | 95.96 |
| [**SPITZER ENERGY COMPANY: SPZ-M800-W {240V}**](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-m800-w-240v/) | 723 | 240.0 | 50.0 | 95.96 |
| [**SPITZER ENERGY COMPANY: SPZ-M800-S {208V}**](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-m800-s-208v/) | 721 | 208.0 | 50.0 | 95.98 |
| [**SPITZER ENERGY COMPANY: SPZ-M800-W {208V}**](https://epri-peac.com/solar-equipment/inverters/spitzer-energy-company/spitzer-energy-company-spz-m800-w-208v/) | 721 | 208.0 | 50.0 | 95.98 |

What to Check & Best-Fit Scenarios

## What Are the Design Limits and Best-Fit Uses for SPITZER ENERGY COMPANY Solar Hardware?

Evaluate SPITZER ENERGY COMPANY CEC certifications (721–10,186W AC), winter voltage limits, and main panel 120% backfeed constraints before finalizing your equipment contract.

- SPITZER ENERGY COMPANY supplies 20 inverter models on the CEC list; cold-climate roofs must check string Voc rise against the inverter's Vdcmax limit before finalizing module count.
- Winter temperature swings: high-efficiency silicon cells gain open-circuit voltage below freezing; oversized DC strings can void inverter DC ceilings if NEC 690.7 is skipped.

### SPITZER ENERGY COMPANY AC Conversion (721–10,186W AC)

Match SPITZER ENERGY COMPANY MPPT channels and Vdcmax ceilings to third-party CEC panels, verifying NEC 705.12 120% panel busbar limits.

### Cold-Weather String Sizing (NEC 690.7)

Calculate winter record-low string Voc using CEC beta_Voc coefficients before approving final roof array layout.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Common permitting, cold-weather string sizing, and warranty inspection questions homeowners ask before approving SPITZER ENERGY COMPANY solar equipment.

### How many SPITZER ENERGY COMPANY solar models are verified on the CEC list?

Our CEC archive indexes 20 SPITZER ENERGY COMPANY equipment records (0 module series and 20 inverter models) spanning 721–10,186W AC. Check local building department permit requirements for Spitzer Energy Company before finalizing component orders.

### What should homeowners check before approving SPITZER ENERGY COMPANY equipment on a solar quote?

Verify the exact CEC model string on your utility interconnection form, confirm cold-weather NEC 690.7 string Voc stays below inverter Vdcmax, and verify NEC 705.12 120% busbar capacity on your main breaker panel.

## Related Pages

Compare SPITZER ENERGY COMPANY against peer solar manufacturers, review CEC datasheet distributions, or open interactive NEC string-voltage and 120% busbar sizing calculators.

[Anhui Rinengzhongtian Semiconductor Development CEC Solar Catalog (165–330W PV)](https://epri-peac.com/solar-equipment/brands/anhui-rinengzhongtian-semiconductor-development/) [EPC Power Corp CEC Solar Catalog (220,033–1,504,900W AC)](https://epri-peac.com/solar-equipment/brands/epc-power-corp/) [Mitsubishi Electric CEC Solar Catalog (120–280W PV)](https://epri-peac.com/solar-equipment/brands/mitsubishi-electric/) [FreeVolt CEC Solar Catalog (300–585W PV)](https://epri-peac.com/solar-equipment/brands/freevolt/) [All CEC Certified Solar Manufacturers](https://epri-peac.com/solar-equipment/brands/) [Check NEC 690.7 Cold-Temp PV String Voc Limit](https://epri-peac.com/tools/pv-string-voc/)

## Sources

1. [CEC Solar Equipment List — PV Modules (NREL SAM Distribution)](https://raw.githubusercontent.com/NREL/SAM/develop/deploy/libraries/CEC%20Modules.csv) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
2. [CEC Solar Equipment List — Grid-Support Inverters (NREL SAM Distribution)](https://raw.githubusercontent.com/NREL/SAM/develop/deploy/libraries/CEC%20Inverters.csv) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
3. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
4. [CPSC SaferProducts Recall Database (Panels, Breakers, Generators, Solar)](https://www.saferproducts.gov/RestWebServices/Recall) — U.S. Consumer Product Safety Commission (CPSC), 2026-11 (retrieved 2026-11-23)

NEC Calculators

Check Sizing Before Buying

Verify cold-weather string Voc under NEC 690.7 and 120% panel busbar limits under NEC 705.12 before selecting equipment.
[PV String Voc Calculator](https://epri-peac.com/tools/pv-string-voc/) [120% Solar Busbar Checker](https://epri-peac.com/tools/solar-busbar-120/)
