---
title: "Manteca, CA Electricity, Wiring Age and Wages"
url: https://epri-peac.com/cities/california/manteca/
description: "Manteca, California: 28.9% pre-1980 wiring, $36.62/hr BLS electrician pay, 31.35 c/kWh power, 2022 CEC (2020 NEC base), and local EIA utilities."
---

California | 28.9% Pre-1980 Homes

# Manteca, CA — Local Electricity Rates, Wiring Age & Labor Data

Sources: **U.S. Census, EIA, Bureau of Labor Statistics, FEMA & NEC** Updated: **2026-11-26**

In Manteca, California (pop. 86,521 across 28,195 homes; 28.9% built pre-1980), residential power averages 31.35 c/kWh (~$154.73/mo) while California statewide BLS May 2025 baseline tracks electrician pay at $36.62/hr ($76,160/yr). Under 2022 CEC (2020 NEC base) and IECC 3, an 8 kW cash array ($23,600, 0% 25D in 2026) saves ~$3,386/yr (7.0-year payback).

- **Pre-1980 Homes** : 28.9% (28,195 units)

- **Elec. Median Pay** : $36.62/hr ($76,160/yr)

- **2025 State Rate** : 31.35 c/kWh (~$154.73/mo)

- **NEC / Climate** : 2022 CEC (2020 NEC base) / IECC 3

Sunlit US residential neighborhood featuring rooftop solar arrays and local electrical distribution infrastructure

## What Do Manteca Housing Age and Heating Fuel Mix Mean for Electrical Panels?

Native Census ACS 2023 housing vintage (28.9% pre-1980), space heating mix, and senior demographics shaping electrical retrofits in Manteca, CA.

Across Manteca, California, Census ACS 2023 records count 28,195 residential housing units serving 86,521 residents, where 28.9% of dwellings were built prior to 1980 and 10.1% date before 1960 (vs. 20.6% constructed since 2010). Median owner-occupied home values sit near $561,200 with $94,718/yr median household income, directly influencing whether older 60 A or 100 A load centers require upgrading to 200 A copper-bus service before adding EV charging or solar.

Space-heating fuel mix in Manteca breaks down to 22.6% electric heat, 70.7% piped utility gas, and 1.1% delivered propane. With 13.6% of residents aged 65 or older, clear circuit-breaker directory labels, GFCI/AFCI protection, and outdoor generator placement clearances protect older households against panel overload.

- Only 28.9% of Manteca dwellings predate 1980 (20.6% post-2010), meaning most neighborhoods run 200 A copper-bus services ready for Level 2 EVSE and AFCI/GFCI breakers.
- Utility gas heats 70.7% of residences while 22.6% use electric heat, so converting gas furnaces or water heaters to heat pumps typically adds 30–50 A of NEC 220 demand.
- Seniors aged 65+ represent 13.6% of Manteca's 86,521 residents (median home value $561,200, household income $94,718/yr); clear breaker labels and CO detectors >=20 ft from portable generators are essential.

## What Do Electricians Charge and What Does Solar Pay Back in Manteca, CA?

Local electrician hourly pay ($36.62/hr via California statewide BLS May 2025 baseline), 2025 retail kWh cost (31.35 c/kWh), and Post-25D solar math in Manteca.

Licensed electricians in Manteca (California statewide BLS May 2025 baseline) earn a median $36.62/hr ($76,160/yr), sitting $0.00/hr above California's $36.62/hr statewide median and $6.64/hr above the $29.98/hr national electrician baseline. At California's 31.35 c/kWh residential electricity tariff (~$154.73/mo average bill), an unfinanced $23,600 8 kW solar array generates roughly $3,386/yr in avoided utility charges—a 7.0-year payback under 2026 0% Section 25D rules.

Verified BLS OEWS May 2025 labor rates and 2025 EIA-861 solar/EV operating costs for Manteca, CA.

| Benchmark Metric | Local Value | Source & Planning Note |
|---|---|---|
| Electrician Median Wage (47-2111) | $36.62/hr ($76,160/yr) | California statewide BLS May 2025 baseline |
| 2025 State Residential Rate | 31.35 c/kWh (~$154.73/mo bill) | Form EIA-861 bundled average |
| 8 kW Solar Yr-1 Bill Offset (0% 25D) | ~$3,386/yr (7.0 yr payback) | $23,600 cash system @ 10,800 kWh/yr |
| EV Home Fueling (12,000 mi/yr) | ~$1,075/yr @ 3.5 mi/kWh | NEC 625.41 48A EVSE needs 60A circuit |

## Which Electric Utilities and Weather Hazards Affect Manteca (San Joaquin County)?

Electric utilities serving San Joaquin County (6 matched providers), IECC 3 climate zone, and 7 federal disaster declarations since 2015 around Manteca.

Power distribution in Manteca falls inside San Joaquin County and DOE IECC Climate Zone 3, served by Pacific Gas & Electric Co., Modesto Irrigation District, City of Lodi - (CA) under 2022 CEC (2020 NEC base). OpenFEMA archives document 7 federal disaster declarations since 2015 alongside peak Lightning NRI exposure (93.4), underscoring why NEC 230.67 surge arresters belong on every panel swap.

- Adopted Code & Climate: California enforces 2022 CEC (2020 NEC base) inside DOE IECC Zone 3; peak FEMA NRI exposure is Lightning (93.4) with 7 federal disaster declarations (2015–2026).
- Regional Licensing Authority: CA Contractors State License Board (CSLB C-10 / C-46).
- County Context: Compare full housing and soil/radon risk inside San Joaquin County or browse peer city Los Angeles (71.0% pre-1980).

EIA-861 utilities matched inside San Joaquin County serving Manteca, CA.

| Utility Provider | Ownership | Res. Rate | Annual SAIDI |
|---|---|---|---|
| Pacific Gas & Electric Co. | Investor Owned | 29.68 c/kWh | 272.6 min/yr |
| Modesto Irrigation District | Political Subdivision | 23.03 c/kWh | 36.3 min/yr |
| City of Lodi - (CA) | Municipal | 22.78 c/kWh | 72.3 min/yr |
| WAPA-- Western Area Power Administration | EIA Provider | 31.35 c/kWh (state) | Unreported |
| Port of Stockton - (CA) | EIA Provider | 31.35 c/kWh (state) | Unreported |
| Lathrop Irrigation District | EIA Provider | 31.35 c/kWh (state) | Unreported |

What to Check & Best-Fit Scenarios

## What Local Electrical Trade-Offs Apply to Manteca, CA Homeowners?

Balance 28.9% pre-1980 panel capacity, $36.62/hr BLS labor benchmarks, and 31.35 c/kWh electricity rates before signing bids in Manteca.

- With 28.9% pre-1980 dwellings in Manteca, homes holding 100 A panels or Stab-Lok/Zinsco busbars often need a full 200 A upgrade before solar or dual 60 A EVSE fits.
- With federal 25D residential solar tax credits ended in 2026, 7.0-year cash paybacks at 31.35 c/kWh demand competitive cash bids below $2.95/W.

### Manteca Panel & EV Upgrade

Verify NEC 220 loads and anchor quotes against California Metro Region's $36.62/hr median electrician rate.

### Manteca Storm Backup & Solar

Match surge arresters (NEC 230.67) and transfer switches to Lightning (7 federal disaster declarations) risk in San Joaquin County.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Key residential wiring age, BLS electrician pay, utility tariff, and 2026 solar payback answers for Manteca, CA homeowners.

### How old is residential electrical wiring in Manteca, CA?

Census ACS 2023 reports 28.9% of Manteca's 28,195 housing units were built before 1980 (10.1% before 1960), elevating the odds of 100 A legacy panels or 1965–73 aluminum branch wiring.

### What is the median electrician hourly pay near Manteca?

BLS May 2025 OEWS data records $36.62/hr ($76,160/yr) for SOC 47-2111 Electricians in Manteca using California statewide BLS May 2025 baseline ($0.00/hr above California's $36.62/hr statewide median and $6.64/hr above the $29.98/hr national electrician baseline).

### How long is residential solar payback in Manteca in 2026 without Section 25D?

At California's 31.35 c/kWh average rate, an 8 kW cash system ($23,600) offsets roughly $3,386/yr, yielding a 7.0-year baseline payback with 0% federal 25D credit.

### How much does charging an electric vehicle cost in Manteca, CA?

Driving 12,000 miles annually at 3.5 mi/kWh consumes ~3,429 kWh—costing roughly $1,075/yr at California's 31.35 c/kWh average residential rate on a 60 A circuit.

### Which electric utilities and climate zone apply to Manteca?

Manteca lies inside San Joaquin County (DOE IECC Climate Zone 3) under 2022 CEC (2020 NEC base), with 6 matched EIA-861 utilities including Pacific Gas & Electric Co., Modesto Irrigation District, City of Lodi - (CA).

### How does Manteca's weather outage risk compare under OpenFEMA?

Federal records document 7 federal disaster declarations in San Joaquin County since 2015, led by Lightning risk (93.4 NRI), making NEC 230.67 surge protection valuable.

## Sources

All municipal utility territories, electricity tariffs, BLS wages, and FEMA disaster counts above trace directly to the 7 published registries listed below.

1. [American Community Survey (ACS) 5-Year Estimates — Housing Age, Heating Fuel, Demographics & Home Values](https://www2.census.gov/programs-surveys/acs/summary_file/2023/table-based-SF/) — U.S. Census Bureau, 2019-2023 5-Year Estimates (retrieved 2026-11-25)
2. [Occupational Employment and Wage Statistics (OEWS) — Metropolitan Area (MSA) Electrician & Solar PV Wages](https://www.bls.gov/oes/tables.htm) — U.S. Bureau of Labor Statistics (BLS), May 2025 MSA Estimates (retrieved 2026-11-25)
3. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
4. [FEMA National Risk Index (NRI) — County Lightning, High Wind, Hurricane, Winter Weather & Wildfire Risk](https://hazards.fema.gov/nri/) — Federal Emergency Management Agency (FEMA), National Risk Index County Release (retrieved 2026-11-25)
5. [OpenFEMA Disaster Declarations Summaries v2 (Storm, Hurricane, Ice, Wildfire Grid Perils)](https://www.fema.gov/api/open/v2/DisasterDeclarationsSummaries) — Federal Emergency Management Agency (FEMA), v2 (2015-2026) (retrieved 2026-11-23)
6. [Building America & IECC Climate Zone County Classifications](https://www.energycodes.gov/climate-zones) — U.S. Department of Energy (DOE) / Pacific Northwest National Laboratory (PNNL), 2021/2024 IECC Climate Zones (retrieved 2026-11-25)
7. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)

## Related Pages

Open San Joaquin County electrical grid risk metrics, local EIA-861 utilities, neighboring cities, or state benchmarks near Manteca.

[San Joaquin County, CA Electrical Grid & FEMA Risk](https://epri-peac.com/counties/california/san-joaquin-county/) [Pacific Gas & Electric Co. Rates & SAIDI Outages](https://epri-peac.com/utilities/ca-pacific-gas-electric-co-14328/) [Modesto Irrigation District Rates & SAIDI Outages](https://epri-peac.com/utilities/ca-modesto-irrigation-district-12745/) [Los Angeles, CA Electrical & Solar Guide](https://epri-peac.com/cities/california/los-angeles/) [San Diego, CA Electrical & Solar Guide](https://epri-peac.com/cities/california/san-diego/)

Local Snapshot

## Manteca, CA Snapshot

Local electric utility territories, U.S. Census population figures, state electrician wages, and severe-weather records for San Joaquin County.

- **Electrical Code:** 2022 CEC (2020 NEC base)
- **Top Weather Hazard:** Lightning (7 FEMA declarations)
- **Avg State Electric Bill:** $154.73/mo
- **State Licensing Board:** CA Contractors State License Board (CSLB C-10 / C-46)
[Open California State Guide](https://epri-peac.com/states/california/) [San Joaquin County Grid Risk](https://epri-peac.com/counties/california/san-joaquin-county/)

## Popular Reference Guides

[200A Panel Costs](https://epri-peac.com/costs/200-amp-panel-upgrade-cost/) [EV 300-Mi Cost](https://epri-peac.com/ev-chargers/charging-cost-300-miles/) [2026 Solar Payback](https://epri-peac.com/solar-for-home/cost-payback-and-2026-rules/) [Home Generators](https://epri-peac.com/generators/) [Wattage Chart](https://epri-peac.com/wattage-guide/)
